The regulation organises around three operational themes: conversion, transfer, and abandonment. Each is anchored to specified documentary and technical standards.
Conversion: The conversion concept is the statutory process turning a "relevant GHG well" into a "water supply bore". Notices of intention (s 5) and completion (s 7) bookend the activity. The regulation defines the minimum content and evidence that must accompany those notices: well schematics located by GDA2020, and a licensed water bore driller’s written approval of suitability (s 5). After completion, the conversion certificate and conversion report (s 8) supply exhaustive pre‑ and post‑conversion technical particulars , spatial coordinates, well completion dates, depths, perforation depths, surveys, casing/equipment diagrams, cementing volumes and losses, plug locations and intervals, and a full inventory of retained/preserved equipment identified as "prescribed equipment" (s 8).
Transfer: The transfer concept governs how the converted water supply bore is conveyed to a landowner under the parent Act’s transfer provisions (s 9). The notice of transfer must be written, state bore identification, position by GDA2020, landowner contact details and intended water use, confirm compliance with conversion requirements in s 467(1)(a)-(f) of the Act, and be accompanied by a signed statement from the landowner consenting to the transfer (s 9).
Plugging and abandonment: The regulation prescribes two routes to abandon a relevant GHG well: the "standard way" being the construction and abandonment code for petroleum wells, or an alternative "proposed way" subject to approval by the chief inspector (s 12). Before any plugging and abandonment works, CTSCo must undertake a systematic safety assessment and prepare a safety report that records, for each identified risk, an "acceptable level" of risk and measures to control the risk (s 13). A plugging and abandonment plan (s 14) must accompany that safety report, demonstrate consideration of code matters, state whether the proposed way deviates from the standard way and, if so, explain the deviation and describe technical measures for risk controls. The chief inspector may approve the alternative method only where satisfied that the acceptable level for each risk is reasonable relative to the standard way and that CTSCo will control the risk to that acceptable level (s 15).
Interlocking references and definitions: The instrument repeatedly invokes external standards and instruments: the GAB Water Plan (s 6), water bore construction codes (s 6, s 14), the construction and abandonment code and petroleum well standards (ss 10, 12, 14), and the P&G Act for definitions (s 8, s 10). It also relies on spatial datum GDA2020 for coordinate specification (ss 5, 7, 9, 8). The regulation refers to "former EPQ10" and CTSCo in the conversion report template (s 8), indicating it is tailored to a specific property set or program, but the full definition of these terms appears in the schedule and in the parent Act (sec 4 notes the dictionary in schedule 1).
Transitional timing and scope: The instrument is expressly transitional (s 3) and temporary, operating between commencement and expiry on 18 June 2029. It also contains "as soon as practicable" catch‑up obligations for works already begun prior to commencement (ss 13(2), 14(2)), which means some actions are retrospective in effect but only to the extent practicable.
Risk and safety framing: The technical requirements emphasise preventing cross‑aquifer flow (internal cement plugs, casing/cement life equivalent to new bores , s 6), and documenting any retained equipment that might create hazards to underground mining (s 8). In the plugging context, the safety assessment requires explicit articulation of acceptable levels of risk having regard to likelihood, severity, and avoidability, and requires control measures targeted at avoiding, eliminating, or minimising risks (s 13).
Decision nodes and evidentiary requirements: The regulation creates several decision points where documentary certification is necessary: the licensed water bore driller’s report for conversion suitability (s 5), the conversion certificate and conversion report (s 7-8), the signed landowner consent for transfer (s 9), the safety assessment report and plugging plan for abandonment (ss 13-14), and the chief inspector’s approval of any deviation from the standard abandonment way (s 15). Those documents form the evidentiary basis for regulatory acceptance of the actions prescribed.