Future Made in Australia (Guarantee of Origin) Rules 2025
47Eligible amount—Act, s 91(4)
Start here
Get a plain-English read of 47
Turn the raw legal text into a practical explanation grounded in Future Made in Australia (Guarantee of Origin) Rules 2025.
47 Eligible amount—Act, s 91(4)
(1) The eligible amount for a registered renewable electricity facility and the time period is calculated in accordance with the following:
(a) for a facility that is an electricity generation system—section 48;
(b) for a facility that is an energy storage system:
(i) if the system has a direct supply relationship with a registered renewable electricity generation system that meets the requirements in subsection (3)—the maximum eligible amount under section 49;
(ii) in any other case—section 50.
Note: Section 50 (which is about calculating the eligible amount where mixed charging sources are used) requires the calculation of the maximum eligible amount in accordance with section 49.
(2) If a variable used in this Division is covered by a measurement standard, the variable must be measured in accordance with the standard.
(3) For subparagraph (1)(b)(i), a registered renewable electricity generation system meets the requirements of this subsection if the system:
(a) only uses eligible renewable energy sources to generate electricity; and
(b) either:
(i) is the sole supplier of electricity to the energy storage system; or
(ii) supplies electricity to the energy storage system together with another registered renewable electricity generation system that:
(A) has a direct supply relationship with the energy storage system; and
(B) only uses eligible renewable energy sources to generate electricity.