(1) The following requirements are prescribed for the energy storage system:
(a) the energy storage system must receive renewable electricity directly from the electricity generation system;
(b) metering or measurement of electricity that enters the energy storage system must meet the requirements (if any) prescribed by a measurement standard applying to the energy storage system.
(2) The following requirements are prescribed for the electricity generation system:
(a) the electricity generation system must supply eligible renewable electricity to the energy storage system;
(b) the electricity generation system must meet the requirements (if any) prescribed by a measurement standard that apply to the electricity generation system.
(3) The following requirements are prescribed for the transfer of electricity:
(a) the transfer between the electricity generation system and the energy storage system must be metered or measured in accordance with the requirements (if any) prescribed by an applicable measurement standard;
(b) the transfer must occur through a direct line from the electricity generation system to the energy storage system.
connection point meter, in relation to a facility, means:
(a) if the facility is in the national electricity market—the meter installed at a connection point (within the meaning of the National Electricity Rules) of the facility; or
(b) in any other case—the meter installed at a point where electricity is transferred from the facility to an electricity network.
direct line, an electricity generation system and an energy storage system transfer electricity through a direct line if:
(a) the electricity generation system and the energy storage system are electrically connected; and
(b) the electricity transferred from the electricity generation system and the energy storage system does not pass through:
(i) a connection point meter; or
(ii) another load.
eligible renewable electricity means electricity generated:
(a) using an eligible renewable energy source; and
(b) in accordance with the Act.
load has the same meaning as in Part 3 of the Future Made in Australia (Guarantee of Origin) Measurement Standard 2025.
national electricity market means the interconnected electricity grids in the participating jurisdictions in the National Electricity Rules.