Electricity Supply Industry Restructuring (Savings and Transitional Provisions) Order 2020
6River Ouse Irrigation District
Start here
Get a plain-English read of 6
Turn the raw legal text into a practical explanation grounded in Electricity Supply Industry Restructuring (Savings and Transitional Provisions) Order 2020.
6 River Ouse Irrigation District
(1) For the purposes of the Irrigation Clauses Act 1973 –
(a) an irrigation right is conferred on an entitlement holder, specified in column 1 of the table in Schedule 4 to this order, in respect of the property identified by the property identification number specified in respect of the entitlement holder in column 2 of that table; and
(b) the irrigation right so conferred on such an entitlement holder is for the entitlement holder to be supplied annually, from the River Ouse, with the volume of water specified, in respect of the entitlement holder, in column 3 of the table in Schedule 4 to this order; and
(c) the HEC is to make available to an entitlement holder annually, from the River Ouse, the volume of water specified, in respect of the entitlement holder, in column 3 of the table in Schedule 4 to this order.
(2) In making water available to an entitlement holder in accordance with this clause, the HEC is only obliged to do so from the bed of the River Ouse.