This Order creates two irrigation districts (Lake River and River Ouse), names the Hydro-Electric Corporation (HEC) as the responsible water entity, and legally grants specific annual water entitlements to named landholders and the Lawrenny Water Trust, with detailed volumes and transfer conditions. The HEC must supply listed volumes from the river beds (clauses 4–7; Schedules 3–5). Who pays: HEC manages delivery; entitlement-holders receive water and may trade rights under the Water Management Act; the Trust has limits and a mandatory river release.
This order, despite its title referring to electricity supply industry restructuring, mechanically creates two new irrigation districts in Tasmania and confers statutory water rights on named private landholders and the Lawrenny Water Trust. The order appoints the Lake River Irrigation District and the River Ouse Irrigation District as irrigation districts under the Water Management Act 1999, with the Hydro-Electric Corporation (HEC) designated as the responsible water entity for both districts. It then confers irrigation rights on 48 separate entitlement holders in the Lake River district and 19 holders in the River Ouse district, specifying the annual volume of water each is entitled to receive from the respective rivers. These rights are granted for the purposes of the Irrigation Clauses Act 1973. Separately, the order deems a licence to have been granted to the Lawrenny Water Trust for taking water from the River Ouse, subject to specific conditions. The HEC is obliged to make the stated volumes available annually from the bed of each river, which limits the source of supply to the natural watercourse rather than allowing alternative delivery methods. The order also includes two plans in Schedule 2 that define the geographical boundaries of each irrigation district, though these are incorporated by reference as graphic images. The granting of rights to specifically named persons and entities by property identification number fixes the entitlements to particular parcels of land, not just to the nominal holder, creating an enduring link between the water right and the property. This structure effectively transfers control over defined water volumes from the state electricity authority to private agricultural operators, representing a significant reallocation of a scarce resource. The order does not explain the basis on which volumes were allocated to particular holders, nor does it provide for periodic review or adjustment of those volumes. It operates as a transitional instrument by converting previous arrangements, likely related to the HEC’s former role, into permanent irrigation rights under the Water Management Act 1999.
Current sections
Direct links to the current provisions in Electricity Supply Industry Restructuring (Savings and Transitional Provisions) Order 2020.
This order takes effect on the day on which its making is notified in the Gazette.
3
Interpretation
3 Interpretation
In this order –
Lawrenny Water Trust means the body corporate and politic by that name created by letters patent under the seal of the State on 11 February 1960 (as notified in the Gazette on 16 March 1960);
property identification number, in respect of a property, means the property identification number for the property contained in the Land Information System Tasmania administered by the department responsible for the administration of the Land Titles Act 1980 .
(a) appointed, and defined, as an irrigation district within the meaning of the Water Management Act 1999 ; and
(b) named the River Ouse Irrigation District.
(3) An irrigation district appointed, and named, under this clause is taken to have been created, and established, under Part 9 of the Water Management Act 1999 .
(4) For the purposes of the Water Management Act 1999 , the HEC is the water entity responsible for each of the irrigation districts appointed and defined under this clause.
(a) an irrigation right is conferred on an entitlement holder, specified in column 1 of the table in Schedule 3 to this order, in respect of the property identified by the property identification number specified in respect of the entitlement holder in column 2 of that table; and
(b) the irrigation right so conferred on such an entitlement holder is for the entitlement holder to be supplied annually, from the Lake River, with the volume of water specified, in respect of the entitlement holder, in column 3 of the table in Schedule 3 to this order; and
(c) the HEC is to make available to an entitlement holder annually, from the Lake River, the volume of water specified, in respect of the entitlement holder, in column 3 of the table in Schedule 3 to this order.
(2) In making water available to an entitlement holder in accordance with this clause, the HEC is only obliged to do so from the bed of the Lake River.
(a) an irrigation right is conferred on an entitlement holder, specified in column 1 of the table in Schedule 4 to this order, in respect of the property identified by the property identification number specified in respect of the entitlement holder in column 2 of that table; and
(b) the irrigation right so conferred on such an entitlement holder is for the entitlement holder to be supplied annually, from the River Ouse, with the volume of water specified, in respect of the entitlement holder, in column 3 of the table in Schedule 4 to this order; and
(c) the HEC is to make available to an entitlement holder annually, from the River Ouse, the volume of water specified, in respect of the entitlement holder, in column 3 of the table in Schedule 4 to this order.
(2) In making water available to an entitlement holder in accordance with this clause, the HEC is only obliged to do so from the bed of the River Ouse.
7
Lawrenny Water Trust
7 Lawrenny Water Trust
(1) A licence under the Water Management Act 1999 is taken to have been conferred on the Lawrenny Water Trust authorising the Lawrenny Water Trust to take a volume of water from the River Ouse in accordance with Schedule 5 to this order.
(2) In any year, the HEC is to make available to the Lawrenny Water Trust, under the licence taken to have been conferred under subclause (1) , the volume of water from the River Ouse specified in Schedule 5 to this order.
(3) In making water available to the Lawrenny Water Trust in accordance with this clause, the HEC is obliged to do so only from the bed of the River Ouse.
(4) The following conditions apply to the licence taken to have been conferred on the Lawrenny Water Trust under subclause (1) :
(a) that a maximum annual volume of 4 250 megalitres, of the water made available to the Lawrenny Water Trust under the licence, is to be used for irrigation of the land serviced by the Trust;
(b) that the rights to a maximum annual volume of 4 250 megalitres, of the water made available to the Lawrenny Water Trust under the licence, may be transferred from the Trust to other parties in accordance with Division 4 of Part 6 of the Water Management Act 1999 ;
(c) if the Lawrenny Water Trust transfers a right under paragraph (b) to another party, that the maximum amount of water that may be used for irrigation, under paragraph (a) , is reduced by the aggregate amount of water in respect of which rights have been transferred under paragraph (b) ;
(d) that a minimum annual volume of 15 000 megalitres, of the water made available to the Lawrenny Water Trust under the licence, is to be released into the River Derwent.
(5) For the avoidance of doubt, nothing in subclause (4) prevents the Lawrenny Water Trust from transferring, to the HEC in accordance with Division 4 of Part 6 of the Water Management Act 1999 , the rights to all, or part, of the total volume of the water made available to the Trust under the licence taken to have been conferred on the Trust under subclause (1) .
SCHEDULE 1 - Areas of land
SCHEDULE 1 - Areas of land
SCHEDULE 1 - Areas of land SCHEDULE 1 - Areas of land
This order is administered in the Department of Primary Industries, Parks, Water and Environment.
Source text
Sourced from Tasmanian Legislation Online (legislation.tas.gov.au), CC BY 4.0.
1 Short title
1 Short title
This order may be cited as the Electricity Supply Industry Restructuring (Savings and Transitional Provisions) Order 2020 .
2 Commencement
2 Commencement
This order takes effect on the day on which its making is notified in the Gazette.
3 Interpretation
3 Interpretation
In this order –
Lawrenny Water Trust means the body corporate and politic by that name created by letters patent under the seal of the State on 11 February 1960 (as notified in the Gazette on 16 March 1960);
property identification number, in respect of a property, means the property identification number for the property contained in the Land Information System Tasmania administered by the department responsible for the administration of the Land Titles Act 1980 .
4 Appointment of irrigation districts
4 Appointment of irrigation districts
(1) The area of land specified in Part 1 of Schedule 1 to this order is –
(a) appointed, and defined, as an irrigation district within the meaning of the Water Management Act 1999 ; and
(b) named the Lake River Irrigation District.
(2) The area of land specified in Part 2 of Schedule 1 to this order is –
(a) appointed, and defined, as an irrigation district within the meaning of the Water Management Act 1999 ; and
(b) named the River Ouse Irrigation District.
(3) An irrigation district appointed, and named, under this clause is taken to have been created, and established, under Part 9 of the Water Management Act 1999 .
(4) For the purposes of the , the HEC is the water entity responsible for each of the irrigation districts appointed and defined under this clause.
Main concepts
The core concept is the irrigation district, defined by reference to the Water Management Act 1999 as an area of land appointed by order. The order itself creates two such districts and specifies their boundaries through Schedule 1 (hectarage descriptions) and Schedule 2 (plans). The boundaries are identified as Lot 1 and Lot 2 for each district, totalling 25,138 hectares for Lake River and 8,879 hectares for River Ouse. These districts are taken to have been created under Part 9 of the Water Management Act 1999, so they carry the legal consequences of that Part including the role of a water entity.
The irrigation right is the central right conferred on entitlement holders. Under the Irrigation Clauses Act 1973, an irrigation right entitles the holder to be supplied annually with a specific volume of water from the designated river. The order names each holder, their property identification number (a unique identifier from the Land Information System Tasmania under the Land Titles Act 1980), and the megalitre volume. The right is conferred for the purposes of the Irrigation Clauses Act, meaning the enforcement mechanisms and obligations under that Act apply. Notably, the HEC is required to make water available from the bed of the river, not from any storage or transfer scheme. This limits the HEC’s flexibility and makes supply dependent on natural river flows, which creates an asymmetry of risk: the entitlement holder’s right is fixed volumetrically, but the HEC’s obligation is only to offer the water from the river bed; if the river is dry or low, the obligation may be practically impossible to fulfil.
The Lawrenny Water Trust is a separate legal entity created by letters patent in 1960. It receives a deemed licence under the Water Management Act 1999 rather than individual irrigation rights. The conditions on that licence are critical: a maximum of 4,250 megalitres per year may be used for irrigation of land serviced by the Trust; rights to that volume may be transferred to others under Division 4 of Part 6 of the Water Management Act; any transfer reduces the maximum irrigation volume pro tanto; and a minimum of 15,000 megalitres per year must be released into the River Derwent. The total volume made available to the Trust is not specified in the order, but the conditions create a split between consumptive use (irrigation) and environmental flow (release). The Trust may also transfer rights back to the HEC. This structure introduces a limited market mechanism for water rights, as the Trust can sell or assign its rights to third parties through the transfer provisions. However, the transfer is subject to the overarching reduction in the irrigation cap, meaning the Trust can only permanently alienate its irrigation allocation, reducing the total water available for the Trust’s own landholders.
Who it affects
The order directly names 67 separate entitlement holders across the two districts, plus the Lawrenny Water Trust. These are predominantly private individuals (such as Archer, Richard William; Bassett, David Henry and Bassett, Diane May) and corporate entities (Clovelly Tasmania Pty Ltd, Connorville Estates Pty Ltd, Panshanger Pty Ltd, etc.). At least 15 corporate entities appear in Schedule 3 alone. Several holders own multiple properties with separate volumes, such as Clovelly Tasmania Pty Ltd with two entries totalling 2,750 megalitres, and Tooma Holdings Pty Ltd with one entry of 4,315 megalitres. Production in the region includes crops, livestock, and specialty agriculture, so the order directly affects farm incomes and land values.
The HEC is directly affected as the water entity obliged to make water available. The obligation is ongoing and annual, with no sunset date in the order. The HEC must supply from the river bed only, which may require investment in offtake infrastructure, monitoring, and management of river flows. The HEC’s other operations, including hydro-electric generation, may be constrained by the need to release water for these irrigation rights, particularly in dry periods. Downstream water users on the River Derwent are indirectly affected by the minimum 15,000 megalitre release condition imposed on the Lawrenny Water Trust, which provides a floor on flows but also means that in wet years the Trust may be forced to release water that could otherwise be stored or used.
The Lawrenny Water Trust itself is affected by the conditions on its licence. Its management must decide how to allocate the maximum 4,250 megalitres for irrigation among its landholders, and whether to transfer rights to others. The transfer mechanism gives the Trust flexibility to monetise surplus water rights or to concentrate irrigation on more productive land, but the permanent reduction in the irrigation cap from transfers imposes a one-way ratchet: once transferred, those rights are lost to the Trust’s irrigation pool. The Trust can also transfer rights to the HEC, which may be a way to temporarily or permanently retire irrigation water.
All existing and potential water users in the Lake River and River Ouse catchments are affected because the order, by conferring these rights, fixed the allocation of a finite resource. Other landowners or new entrants cannot acquire equivalent rights unless they purchase an existing entitlement property, creating a barrier to entry and capitalising the water right into land value. The order does not create a mechanism for reallocating rights between holders other than the Lawrenny Water Trust’s limited transfer power. This means the initial allocation is locked in, which may reduce the flexibility of the water market overall.
Key duties and rights
The primary right conferred is the entitlement holder’s right to be supplied annually with a specified volume of water from the named river. For each holder listed in Schedule 3 (Lake River) and Schedule 4 (River Ouse), that right arises under the Irrigation Clauses Act 1973. The right is attached to the property identified by the property identification number, so a change in ownership of the land would presumably transfer the right, although the order does not expressly state that. The holder can enforce that right against the HEC to the extent that the HEC must make the water available from the river bed. However, the holder does not have a right to demand that the HEC construct infrastructure or deliver the water to a specific point; the obligation is only to make it available from the river.
The HEC’s duty is to make the water available annually from the bed of the river. This is an obligation to provide the opportunity for the holder to take the water, but the HEC is not obliged to ensure that the river contains that volume at all times. The order does not define what happens if natural flows are insufficient: whether the HEC must release stored water, or whether the obligation is subject to hydrological availability. The phrase “make available” suggests the HEC must not obstruct or hinder the holder’s access, but it does not create a guarantee of supply. This is a significant limitation: in drought years, the entitlement may be worth little more than the paper it is written on. The holder bears the hydrological risk.
The Lawrenny Water Trust has the right to take water under a deemed licence, subject to four conditions. The condition requiring a minimum annual release of 15,000 megalitres into the River Derwent is both a duty and a constraint: the Trust must ensure that release occurs before it can use any water for irrigation. This effectively creates a priority: the first 15,000 megalitres of the Trust’s total allocation must go to environmental flow. The Trust also has the right to transfer its irrigation rights to other parties under the Water Management Act, which gives it a tradable asset. However, the condition that the maximum irrigation volume is reduced by transferred amounts means that transfers are irreversible: the Trust can sell rights, but it cannot sell rights that it later repurchases while retaining the same cap. That is a constraint on the Trust’s ability to engage in temporary trading or leasing.
The order does not confer any right on third parties, such as downstream users, to enforce the conditions on the Lawrenny Water Trust. Enforcement would fall under the Water Management Act 1999, which likely gives the Minister enforcement powers. The absence of private rights of action means that if the Trust fails to release the minimum 15,000 megalitres, only the state can take action. This creates a potential principal-agent problem where the environmental condition is not directly enforceable by affected parties.
Penalties and enforcement
The order itself contains no penalty provisions. It does not create offences, set fines, or specify enforcement powers. Enforcement of the rights and duties created by the order is left to the underlying statutes, principally the Water Management Act 1999 and the Irrigation Clauses Act 1973. Under the Water Management Act, it is an offence to take water without a licence or in contravention of licence conditions, with penalties that may include fines and orders to remedy harm. The HEC’s failure to make water available could potentially be enforced by an entitlement holder through civil proceedings for breach of statutory duty or through the dispute resolution mechanisms under the Irrigation Clauses Act. However, the order does not clarify the remedy: a holder cannot compel the HEC to store water or augment flows, so the practical remedy is likely limited to damages if the HEC actively prevents access.
For the Lawrenny Water Trust, non-compliance with the conditions on its deemed licence could result in enforcement action by the Minister under the Water Management Act, including suspension or cancellation of the licence, directions to comply, or prosecution for taking water in excess of the licence. The maximum irrigation cap of 4,250 megalitres is a strict condition; exceeding it would likely be an offence. Similarly, failure to release the minimum 15,000 megalitres to the River Derwent could be enforced. The Water Management Act gives the Minister broad powers to issue compliance notices and seek court orders. However, the enforcement provisions are discretionary; the order does not mandate enforcement or create any automatic penalty.
The absence of explicit penalties in the order means that the value of the irrigation rights depends on the effectiveness of the generally applicable enforcement regime. In practice, enforcement of water laws in Tasmania has been criticised as under-resourced, which adds to the risk that rights-holders may face little consequence if they exceed their entitlement, or may struggle to enforce the HEC’s obligations. The order also does not contain any clawback or adjustment mechanism if climate or hydrological conditions change significantly, leaving enforcement of supply obligations uncertain in a drying climate.
How it interacts with other laws
The order explicitly ties to several pieces of legislation. It appoints the irrigation districts under the Water Management Act 1999, and those districts are taken to have been created under Part 9 of that Act. Part 9 provides for the establishment of irrigation districts, the role of water entities, and the management of water within them. The order also engages the Irrigation Clauses Act 1973, which governs the content and enforcement of irrigation rights. The rights conferred under clauses 5 and 6 are expressly for the purposes of that Act, meaning that the Act’s provisions on rights, obligations, and dispute resolution apply.
The Lawrenny Water Trust licence is deemed to be conferred under the Water Management Act 1999, and the conditions on it are statutorily imposed. The transfer provisions in clause 7(4)(b) expressly refer to Division 4 of Part 6 of the Water Management Act, which deals with transfers of water rights. This enables the Trust to sell or assign its irrigation rights to other parties, but any transfer reduces the maximum irrigation cap under the order. The Trust may also transfer rights to the HEC, which could allow the HEC to retire water rights in exchange for compensation or other arrangements.
The Land Titles Act 1980 is used to define the property identification numbers that link the rights to specific parcels. This creates a clear interface with the land titles system, meaning that a purchaser of the property will acquire the water right as part of the land, assuming the right runs with the land. The order does not state this explicitly, but the use of the property identification number implies the right is appurtenant to the land, not personal to the holder.
The Electricity Supply Industry Restructuring Act is the parent Act under which this order is made (the title states “Electricity Supply Industry Restructuring (Savings and Transitional Provisions) Order 2020). The purpose is likely to save and transition water rights that were previously held or managed by the HEC in its capacity as a state electricity entity to the new irrigation regime. The order does not cite any specific provision of that Act, but its existence as an order under that Act means it is subordinate legislation subject to the parent Act’s scope. Any inconsistency with the parent Act would be resolved in favour of the parent Act.
The order does not interact with the Commonwealth Water Act 2007 or the Murray-Darling Basin Plan, as these are Tasmanian rivers not in the Murray-Darling system. It also does not appear to engage the Environmental Protection and Biodiversity Conservation Act 1999, but releases of water into the River Derwent may affect listed species or wetlands. The order does not require any federal approval, leaving potential environmental impacts to state regulation.
Amendment history
The order was notified in the Gazette on 23 December 2020 and took effect that day. There is one recorded amendment: Schedule 3 was amended by S.R. 2021, No. 57, applied on 21 July 2021. The amendment is marked in the source text as applying to Schedule 3, but the specific changes are not described. Given that Schedule 3 lists the Lake River Irrigation District entitlements, the amendment likely corrected a clerical error, added or removed a holder, or adjusted a volume. The amendment was made by a subsequent statutory rule, which is a legislative instrument of the same rank as this order. This demonstrates that the schedule is subject to further amendment by the executive, and the entitlements are not permanently fixed by this order alone. There is no indication of any other amendments.
The order does not contain a sunset clause or review date. It appears to be permanent in effect, subject only to future amendment or repeal. The absence of a mandatory review means that the allocations may become outdated if the property holders change or if hydrological conditions shift, but the order has no mechanism for periodic adjustment. The 2021 amendment shows that the government can update the schedule when needed, but there is no obligation to consult affected parties or take account of changed circumstances. The amendment history is thin, reflecting that the order is relatively recent and has not been substantially litigated or reviewed.
Litigation history
The source text does not mention any court cases or tribunal decisions relating to this order. A search of Tasmanian judgments would be necessary to confirm whether any litigation has occurred, but the order itself provides no reference. Given that the order creates specific property-like rights, it is possible that disputes have arisen over the interpretation of the HEC’s obligation to make water available, especially in years of low river flows. The ambiguity of “make available” is a natural target for litigation. Additionally, the interaction between the order and the underlying statutes could generate jurisdictional disputes: for example, whether an entitlement holder can sue the HEC directly under the Irrigation Clauses Act or must exhaust administrative remedies under the Water Management Act.
The Lawrenny Water Trust conditions could also lead to litigation. The minimum release of 15,000 megalitres to the River Derwent is a binding condition that may conflict with the Trust’s ability to meet irrigation demands in dry years. If the Trust fails to release the minimum, the Minister could take enforcement action, and the Trust might challenge the reasonableness of the condition or seek a variation. Conversely, downstream users or environmental groups could seek judicial review of the Minister’s failure to enforce the condition. No such cases are reported in the source.
The absence of cited litigation may simply reflect the order’s short history and the slow pace of water disputes, or it may indicate that the order was carefully drafted to minimise ambiguity. However, the grey areas , such as the HEC’s supply obligation and the effect of transfers on the Lawrenny Trust cap , are sufficiently vague that litigation is likely in the future. Any court decision would be important for clarifying the rights created, but as of the source date, no authoritative interpretation exists.
Gotchas
The order contains several traps for both rights-holders and the HEC. First, the title is misleading. A practitioner searching for irrigation or water rights law would not naturally look under an “Electricity Supply Industry Restructuring” order. This creates a risk that relevant parties may miss the order entirely, especially if they are not already aware of the connection between electricity restructuring and irrigation. Any due diligence on water rights in the Lake River or River Ouse areas must include this order, but it might not appear in standard water legislation searches.
Second, the “make available from the bed” language in clauses 5(2), 6(2), and 7(3) limits the HEC’s obligation. An entitlement holder expecting the HEC to construct a delivery channel or pressurised pipe may be disappointed. The holder must physically take the water from the river bed at their own cost. The HEC is not required to treat, store, or deliver the water. If the river is dry or the offtake is impractical, the holder has no remedy unless the HEC actively prevents access. The order does not create a guarantee of supply.
Third, the Lawrenny Water Trust’s transfer conditions are asymmetric. The Trust can transfer its irrigation rights to others, but each transfer permanently reduces the maximum volume that may be used for irrigation under the Trust’s licence. This means that selling rights is a one-way decision: the Trust cannot later buy back the same volume and add it to its cap. This may discourage temporary trading, as the Trust might be unwilling to permanently alienate rights. However, the Trust can transfer rights to the HEC, which could be used to temporarily retire water without losing the cap, provided the transfer is worded as a temporary transfer allowed under the Water Management Act. The order does not clarify that.
Fourth, the minimum release of 15,000 megalitres to the Derwent is a massive constraint on the Trust. The total volume of water made available to the Trust is not stated, but if it is less than 19,250 megalitres (15,000 plus 4,250), then the Trust has no water left for irrigation after the release. More likely, the Trust’s allocation exceeds 19,250 megalitres, but the condition still forces a large environmental flow that cannot be used for irrigation or transferred. This imposes a significant opportunity cost on the Trust’s landholders, as they cannot capture the value of the water that must be released. The condition is not subject to adjustment based on need or profitability.
Fifth, the allocations are listed by name in schedules that were amended once already. Any change in ownership of the property does not automatically update the schedule. The new owner will rely on general law of fixtures and appurtenances, but the order’s reference to the original named holder may cause confusion. If a sale occurs, the parties should confirm that the water right is transferred with the land and that the government will update the schedule or at least recognise the successor in interest. The order does not provide a mechanism for amendment outside the statutory rule process.
Sixth, the order does not define what happens if a holder does not use the full volume in a given year. There is no carry-over or forfeiture provision. Unused water presumably remains in the river, available for other users or environmental flows. The holder cannot bank the allocation for future years. This reduces the incentive to invest in efficient irrigation technology, as unused water is lost.
How to comply
Compliance obligations under the order flow from the rights and duties it creates. For entitlement holders listed in Schedules 3 and 4, compliance is straightforward: holders must take water only in accordance with the volume and source specified. They cannot exceed the annual megalitre limit for their property. The water must be taken from the bed of the named river (Lake River or River Ouse), not from other sources or via alternate extraction points. If a holder takes more than the specified volume, they risk committing an offence under the Water Management Act 1999 for unauthorised taking of water. Holders should also ensure that they have any necessary approvals under the Water Management Act for constructing offtake infrastructure, as the order does not grant those approvals. They should keep accurate records of volumes extracted each year to demonstrate compliance if audited.
For the HEC, compliance requires making the specified volumes available annually from the bed of each river. The HEC must not block, divert, or restrict access to the river in a way that prevents entitlement holders from taking their allocation. The HEC also must not allocate the same water to other users in a way that would impair the holders’ rights. The HEC should have systems to monitor river levels and flows to ensure that holders can physically access the water. If the HEC fails to make water available, it may face civil liability or enforcement action under the Irrigation Clauses Act 1973. The HEC should also document its efforts to comply, particularly in dry years, to defend against any claims.
For the Lawrenny Water Trust, compliance is more complex. The Trust must ensure that of the water it takes from the River Ouse under the deemed licence, no more than 4,250 megalitres per year is used for irrigation of the land it services. It must also ensure that at least 15,000 megalitres per year is released into the River Derwent. The Trust must manage its extraction and distribution to meet both constraints. If the Trust transfers any irrigation rights to other parties under Division 4 of Part 6 of the Water Management Act, it must immediately reduce the maximum irrigation cap by the volume transferred. The Trust should maintain separate records of irrigation use versus releases to the Derwent, and of any transfers made, to demonstrate compliance with the conditions. The Trust should also ensure that transfers are done through the proper Water Management Act procedures and that the HEC is notified.
All parties should be aware that the order does not grant exemptions from other laws. For example, the Environment Protection and Biodiversity Conservation Act 1999 (Commonwealth) may apply if the taking of water impacts listed species. The Tasmanian Water Management Act 1999 contains its own penalty provisions for non-compliance with licence conditions. Anyone taking water under this order should obtain legal advice on the full scope of applicable regulatory obligations. The order is also administered by the Department of Primary Industries, Parks, Water and Environment, which can provide guidance on record-keeping and interpretation of the schedules.
Finally, because the order is subordinate legislation, it is subject to change. Any proposed amendment to the schedules or conditions should be tracked through the Tasmanian Government Gazettes. The 2021 amendment to Schedule 3 shows that the government can alter entitlements without notice to or consent from holders, so holders should remain engaged with policy developments.
(1) For the purposes of the Irrigation Clauses Act 1973 –
(a) an irrigation right is conferred on an entitlement holder, specified in column 1 of the table in Schedule 3 to this order, in respect of the property identified by the property identification number specified in respect of the entitlement holder in column 2 of that table; and
(b) the irrigation right so conferred on such an entitlement holder is for the entitlement holder to be supplied annually, from the Lake River, with the volume of water specified, in respect of the entitlement holder, in column 3 of the table in Schedule 3 to this order; and
(c) the HEC is to make available to an entitlement holder annually, from the Lake River, the volume of water specified, in respect of the entitlement holder, in column 3 of the table in Schedule 3 to this order.
(2) In making water available to an entitlement holder in accordance with this clause, the HEC is only obliged to do so from the bed of the Lake River.
6 River Ouse Irrigation District
6 River Ouse Irrigation District
(1) For the purposes of the Irrigation Clauses Act 1973 –
(a) an irrigation right is conferred on an entitlement holder, specified in column 1 of the table in Schedule 4 to this order, in respect of the property identified by the property identification number specified in respect of the entitlement holder in column 2 of that table; and
(b) the irrigation right so conferred on such an entitlement holder is for the entitlement holder to be supplied annually, from the River Ouse, with the volume of water specified, in respect of the entitlement holder, in column 3 of the table in Schedule 4 to this order; and
(c) the HEC is to make available to an entitlement holder annually, from the River Ouse, the volume of water specified, in respect of the entitlement holder, in column 3 of the table in Schedule 4 to this order.
(2) In making water available to an entitlement holder in accordance with this clause, the HEC is only obliged to do so from the bed of the River Ouse.
7 Lawrenny Water Trust
7 Lawrenny Water Trust
(1) A licence under the Water Management Act 1999 is taken to have been conferred on the Lawrenny Water Trust authorising the Lawrenny Water Trust to take a volume of water from the River Ouse in accordance with Schedule 5 to this order.
(2) In any year, the HEC is to make available to the Lawrenny Water Trust, under the licence taken to have been conferred under subclause (1) , the volume of water from the River Ouse specified in Schedule 5 to this order.
(3) In making water available to the Lawrenny Water Trust in accordance with this clause, the HEC is obliged to do so only from the bed of the River Ouse.
(4) The following conditions apply to the licence taken to have been conferred on the Lawrenny Water Trust under subclause (1) :
(a) that a maximum annual volume of 4 250 megalitres, of the water made available to the Lawrenny Water Trust under the licence, is to be used for irrigation of the land serviced by the Trust;
(b) that the rights to a maximum annual volume of 4 250 megalitres, of the water made available to the Lawrenny Water Trust under the licence, may be transferred from the Trust to other parties in accordance with Division 4 of Part 6 of the Water Management Act 1999 ;
(c) if the Lawrenny Water Trust transfers a right under paragraph (b) to another party, that the maximum amount of water that may be used for irrigation, under paragraph (a) , is reduced by the aggregate amount of water in respect of which rights have been transferred under paragraph (b) ;
(d) that a minimum annual volume of 15 000 megalitres, of the water made available to the Lawrenny Water Trust under the licence, is to be released into the River Derwent.
(5) For the avoidance of doubt, nothing in subclause (4) prevents the Lawrenny Water Trust from transferring, to the HEC in accordance with Division 4 of Part 6 of the Water Management Act 1999 , the rights to all, or part, of the total volume of the water made available to the Trust under the licence taken to have been conferred on the Trust under subclause (1) .
SCHEDULE 1 - Areas of land SCHEDULE 1 - Areas of land
SCHEDULE 1 - Areas of land SCHEDULE 1 - Areas of land
Clause 4
Part 1 Lake River Irrigation District
Part 1 Lake River Irrigation District
(a) about 21 356 hectares, shown as Lot 1; and
(b) about 3 782 hectares, shown as Lot 2 –
Part 1Schedule 2
Part 2 River Ouse Irrigation District
Part 2 River Ouse Irrigation District
(a) about 7 117 hectares, shown as Lot 1; and
(b) about 1 762 hectares, shown as Lot 2 –
Part 2Schedule 2
SCHEDULE 2 - Plans SCHEDULE 2 - Plans
SCHEDULE 2 - Plans SCHEDULE 2 - Plans
Part 1 Lake River Irrigation District
Part 1 Lake River Irrigation District
Part 2 River Ouse Irrigation District
Part 2 River Ouse Irrigation District
SCHEDULE 3 - Lake River Irriga SCHEDULE 3 - Lake River Irrigation District entitlements
SCHEDULE 3 - Lake River Irriga SCHEDULE 3 - Lake River Irrigation District entitlements