Schedule 4 Dictionary
Schedule 4 Dictionary
clause 3
advocate means the electricity infrastructure jobs advocate.
administer, for Part 7—see clause 39B.
appointed member means a member of the Board appointed by the Minister under the Act, section 7(2)(a) or (c).
appropriate referenced costs process—see clause 47E(7).
audit subject, for Part 13—see clause 68.
auditor, for Part 13—see clause 68.
authorisation has the same meaning as in the Act, section 36.
basis risk, for Part 5—see clause 22.
Board means the board for manufacturing and construction in the NSW renewable energy sector established under the Act, section 7.
competitive assessment process means a process carried out by the infrastructure planner under clause 45 to competitively assess persons who apply to carry out all or part of—
(a) REZ network infrastructure project, or
(b) a priority transmission infrastructure project.
component, of a revenue determination, means a component referred to in the Act, section 38(2) and includes part of a component.
contestable augmentation means a network infrastructure project carried out by a network operator where—
(a) the project is an augmentation to a network infrastructure project (the related project), and
(b) the network operator is subject to a contestable revenue determination in relation to the related project.
contestable component, of a non-contestable revenue determination, means a component where the costs of the component are derived as a result of a competitive assessment process.
contestable revenue determination means a revenue determination made as a result of a competitive assessment process.
cost recovery declaration, for Part 9, Division 3—see clause 54B(1).
declaration, for an access scheme, means the declaration made under the Act, section 24 for the scheme.
development agreement—see clause 42CA(1).
development pathway means the development pathway referred to in the Act, section 45(1)(a).
eligible network operator, for Part 9, Division 3—see clause 54A.
existing contractual arrangements, for a contestable augmentation, means contractual arrangements entered into by the network operator under an authorisation in relation to the related project.
finance and construction criteria means the project commitment criteria named as the finance criteria and the construction criteria on the generator information page being the information resource established, maintained and published by AEMO under the National Electricity Rules, rule 3.7F, from time to time.
Note—
The information page is available at www.aemo.com.au.
fixed shape, fixed volume derivative arrangement, for Part 5—see clause 22.
greenhouse gas—see clause 60.
higher emission firming infrastructure, for Part 12—see clause 60.
infrastructure investment objectives report means a report prepared by the consumer trustee under the Act, section 45(1).
IP planned REZ network has the same meaning as in the National Electricity Rules.
Note—
See the National Electricity Rules, clause 9A.2.1.
joint chairperson means either of the 2 members appointed as the joint chairperson of the Board under the Act, section 7(3).
LTES operator for firming infrastructure, for Part 12—see clause 60.
member means any member of the Board.
National Electricity Rules means the National Electricity Rules as modified by clause 59.
nominated date, in relation to a development agreement—see clause 42CA(1)(a).
non-contestable revenue determination means a revenue determination, made other than as a result of a competitive assessment process, that —
(a) does not include a contestable component, or
(b) includes at least—
(i) 1 contestable component, and
(ii) 1 component that is not a contestable component.
non-financial value criteria, for an LTES agreement, means matters that are not directly related to the financial value of the LTES agreement, including the following—
(a) the use of land,
(b) community engagement activities undertaken by the LTES operator,
(c) how the LTES operator will share with the local community the benefits of the construction and operation of infrastructure under the LTES agreement,
(d) regional economic development in New South Wales,
(e) for firming infrastructure—the extent to which an LTES agreement contributes to a reduction in scope 1 emissions of greenhouse gas in the NSW electricity sector.
NSW carbon credit units, for Part 12—see clause 60.
NSW region means the region identified as the New South Wales region in the Regions Publication, published by AEMO under the National Electricity Rules, clause 2A.1.3.
offset requirement, for Part 12—see clause 62(1).
offset units, for Part 12—see clause 60.
plan has the same meaning as in the Act, Part 2.
recommended contractual arrangements—see clause 43.
regulator’s guidelines means the guidelines prepared by the regulator about revenue determinations under clause 47.
related project, for a contestable augmentation—see the definition of contestable augmentation.
revenue determination means a determination made by the regulator under the Act, section 38 in relation to a network operator subject to an authorisation.
REZ access standard, for an access scheme, means a technical standard of performance for connection to an access rights network under the access scheme—
(a) made under Schedule 1B, clause 1 by the infrastructure planner for the access scheme, and
(b) expressed as a standard of performance or a range of standards of performance.
scope 1 emission, for Part 12—see clause 60.
surrender, for Part 12—see clause 60.
standard development agreement—see clause 42CA(2).
the Act means the Electricity Infrastructure Investment Act 2020.
transmission efficiency test means the transmission efficiency test under the Act, section 38(4).
sch 4: Ins 2024 (96), Sch 1[15]. Am 2024 (405), Sch 1[5]; 2024 (626), Sch 1[13]; 2026 (113), Sch 1[8].