NSWIn ForceRegulation
Design and Building Practitioners Regulation 2021
97AExtension of alternative pathways until 31 December 2023
Start here
Get a plain-English read of 97A
Turn the raw legal text into a practical explanation grounded in Design and Building Practitioners Regulation 2021.
#### 97A Extension of alternative pathways until 31 December 2023
97A Extension of alternative pathways until 31 December 2023
> > (1) Clause 95 extends, for the relevant period, to a person who applies for registration as—
> >
> > > (a) a design practitioner—fire systems (detection and alarm systems), or
> >
> > > (b) a design practitioner—fire systems (fire hydrant and fire hose reel), or
> >
> > > (c) a design practitioner—fire systems (fire sprinkler).
>
> > (2) Clause 97 extends, for the relevant period, to a person who applies for registration as—
> >
> > > (a) a professional engineer, or
> >
> > > (b) a design practitioner—building design (low rise), or
> >
> > > (c) a design practitioner—building design (medium rise).
>
> > (3) In this clause—
> >
> > relevant period means from the commencement of this clause until the end of 31 December 2023.
>
> **cl 97A:** Ins 2023 (65), Sch 1\[16\].