4 March 2022 GOVERNMENT GAZETTE, WA 461
— PART 2 —
CONSUMER PROTECTION
CP401
RETAIL TRADING HOURS ACT 1987
RETAIL TRADING HOURS (PERTH METROPOLITAN AREA)
Public Holiday Variation Order 2022
Made by the Minister for Commerce under section 12E of the Act.
Citation
This order is the Retail Trading Hours (Perth Metropolitan Area) Public Holiday Variation Order 2022.
Commencement
This order comes into operation as follows—
(a) clauses 1 and 2—on the day on which this order is published in the Gazette;
(b) the rest of the order—on the day after that day.
Variation of retail trading hours
General retail shops, other than motor vehicle shops, in the Perth metropolitan area, are authorised to
be open at times when those shops would otherwise be required to be closed—
(a) on each day specified in the Table; and
(b) during the hours specified for that day in the Table.
Table
Day Hours
Monday 7 March 2022 from 8:00am until 6:00pm
Monday 18 April 2022 from 8:00am until 6:00pm
Relationship to Retail Trading Hours (Public Holidays) Order 2012.
This order has effect despite the Retail Trading Hours (Public Holidays) Order 2012.
Hon. ROGER COOK, MLA, Minister for Commerce.
———————————
CP402
RETAIL TRADING HOURS ACT 1987
RETAIL TRADING HOURS (SHIRE OF COLLIE)
Public Holiday Variation Order 2022
Made by the Minister for Commerce under section 12E of the Act.
Citation
This order is the Retail Trading Hours (Shire of Collie) Public Holiday Variation Order 2022.
Commencement
This order comes into operation as follows—
(a) clauses 1 and 2—on the day on which this order is published in the Gazette;
(b) the rest of the order—on the day after that day.
Variation of retail trading hours
General retail shops, other than motor vehicle shops, in the Collie local government district are
authorised to be open at times when those shops would otherwise be required to be closed—
(a) on each day specified in the Table; and
(b) during the hours specified for that day in the Table.
462 GOVERNMENT GAZETTE, WA 4 March 2022
Table
Day Hours
Monday 7 March 2022 from 8.00am until 5.00pm
Monday 18 April 2022 from 8.00am until 5.00pm
Monday 6 June 2022 from 8.00am until 5.00pm
Monday 26 September 2022 from 8.00am until 5.00pm
4. Relationship to standing order
This order has effect despite the Retail Trading Hours (Shire of Collie) Variation Order 2016.
Hon. ROGER COOK, MLA, Minister for Commerce.
———————————
CP403
RETAIL TRADING HOURS ACT 1987
RETAIL TRADING HOURS (CITY OF ALBANY) VARIATION ORDER 2022
Made by the Minister for Commerce under section 12E of the Act.
Citation
This order is the Retail Trading Hours (City of Albany) Variation Order 2022.
Commencement
This order comes into operation as follows—
(a) clauses 1 and 2—on the day on which this order is published in the Gazette;
(b) the rest of the order—on the day after that day.
Variation of retail trading hours
General retail shops, other than motor vehicle shops, in the Albany local government district are
authorised to be open at times when those shops would otherwise be required to be closed-
(a) on each day specified in the Table; and
(b) during the hours specified for that day in the Table.
Table
Day Hours
Sunday 24 April 2022 From 10.00am to 5.00pm
Hon. ROGER COOK, MLA, Minister for Commerce.
ENVIRONMENT
EV401
ENVIRONMENTAL PROTECTION ACT 1986
Section 20
DELEGATION NO. 56
I, Michelle Andrews, Chief Executive Officer of the Department responsible for the administration of
the Environmental Protection Act 1986 (“the Act”), acting pursuant to section 20 of the Act, hereby
delegate all my powers and duties conferred or imposed by—
a. Regulations 4, 5(1), 8, 9, 10, 14 and 19 of the Environmental Protection (Cost Recovery)
Regulations 2021 to the holders for the time being of the office of the Executive Director,
Environmental Protection Authority Services and Director, Environmental Protection
Authority Services, both of the Department of Water and Environmental Regulation; and
b. Regulations 11 and 12 of the Environmental Protection (Cost Recovery) Regulations 2021 to the
holder for the time being of the office of the Executive Director, Compliance and Enforcement
of the Department of Water and Environmental Regulation.
Dated the 16th day of February 2022.
MICHELLE ANDREWS, Chief Executive Officer,
Department of Water and Environmental Regulation.
Approved by—
Hon. REECE WHITBY, MLA, Minister for Environment.
4 March 2022 GOVERNMENT GAZETTE, WA 463
FIRE AND EMERGENCY SERVICES
FE401
EMERGENCY MANAGEMENT ACT 2005
EXTENSION OF STATE OF EMERGENCY DECLARATION
I, Stephen Noel Dawson, the Minister for Emergency Services, hereby extend the state of emergency
declaration made on 15 March 2020 at 12:45 pm.
The state of emergency declaration is extended for a period of fourteen (14) days.
The powers that may be exercised during the period by which the state of emergency declaration is
extended are limited as follows: Nil limitations.
Time when declaration made: 4:44 pm.
Date on which declaration made: 23 February 2022.
This declaration has effect from 12 am on 25 February 2022 and remains in force until—
(a) 12 am on 11 March 2022; or
(b) It is revoked under section 59 of the Emergency Management Act 2005.
This declaration of an extension of a state of emergency declaration is made under section 58 of the
Emergency Management Act 2005.
STEPHEN NOEL DAWSON, Minister for Emergency Services.
———————————
FE402
BUSH FIRES ACT 1954
TOTAL FIRE BAN DECLARATION
Correspondence No. D18023
Pursuant to powers delegated under the Bush Fires Act 1954, the Assistant Commissioner of the
Department of Fire and Emergency Services, declared under Section 22A of the Bush Fires Act 1954, a
total fire ban for 28 February 2022 for the local government districts of—
Mount Marshall, Mukinbudin, Westonia, Yilgarn.
Dated 27 February 2022.
GARY GIFFORD, Assistant Commissioner of the Department of
Fire and Emergency Services, as a sub-delegate of the Minister
under section 16 of the Fire and Emergency Services Act 1998.
———————————
FE403
BUSH FIRES ACT 1954
TOTAL FIRE BAN DECLARATION
Correspondence No. D18023
Pursuant to powers delegated under the Bush Fires Act 1954, the Assistant Commissioner of the
Department of Fire and Emergency Services, declared under Section 22A of the Bush Fires Act 1954, a
total fire ban for 2 March 2022 for the local government districts of—
Exmouth.
Dated 1 March 2022.
GARY GIFFORD, Assistant Commissioner of the Department of
Fire and Emergency Services, as a sub-delegate of the Minister
under section 16 of the Fire and Emergency Services Act 1998.
464 GOVERNMENT GAZETTE, WA 4 March 2022
FISHERIES
FI401
PEARLING ACT 1990
DECISION TO GRANT AN APPLICATION FOR THE ISSUE OF A PEARL OYSTER FARM LEASE
A1823084
I, Nathan Harrison, Director Aquatic Resource Management, as delegate of the Chief Executive Officer
(CEO) of the Department of Primary Industries and Regional Development, Western Australia,
pursuant to Section 23(1) of the Pearling Act 1990 (“the Pearling Act”) have made the decision to grant
an application submitted by Cygnet Bay Pearls Consolidated Pty Ltd to issue pearl oyster farm leases
in respect of an area of water located at Cape Villaret B and Cape Villaret C.
The coordinates of the Cape Villaret B lease are as follows—
Boundary Corner Co-ordinates: Datum GDA94
Point Latitude Longitude
A 18° 17. 600’ S 121° 57. 250’ E
B 18° 17. 600’ S 121° 58. 250’ E
C 18° 19. 500’ S 121° 56. 750’ E
D 18° 19. 500’ S 121° 57. 750’ E
The coordinates of the Cape Villaret C lease are as follows—
Boundary Corner Co-ordinates: Datum GDA94
Point Latitude Longitude
A 18° 11. 500’ S 121° 51. 800’ E
B 18° 11. 500’ S 121° 52. 000’ E
C 18° 11. 700’ S 121° 51. 800’ E
D 18° 11. 700’ S 121° 52. 000’ E
Under Section 33(1) of the Pearling Act a person aggrieved by my decision may apply to the State
Administrative Tribunal (SAT) for a review of the decision. Application forms can be obtained from the
SAT located at 5/565 Hay Street, Perth WA or from the SAT’s website www.sat.justice.wa.gov.au. The
application together with any supporting documents should be lodged with the SAT within 28 days of
publication of this Notice. When an application is accepted by the Chief Executive Officer of the SAT,
the applicant is to give a copy of the application to the Chief Executive Officer, Department of Primary
Industries and Regional Development, 1 Nash Street, Perth WA 6000.
Dated this 24th day of February 2022.
NATHAN HARRISON, Director Aquatic Resource Management.
As delegate of the CEO.
———————————
FI402
PEARLING ACT 1990
DECISION TO GRANT AN APPLICATION FOR THE ISSUE OF A PEARL OYSTER FARM LEASE
A1825310
I, Nathan Harrison, Director Aquatic Resource Management, as delegate of the Chief Executive Officer
(CEO) of the Department of Primary Industries and Regional Development, Western Australia,
pursuant to Section 23(1) of the Pearling Act 1990 (“the Pearling Act”) have made the decision to grant
an application submitted by Maxima Pearling Company Pty Ltd to issue a pearl oyster farm lease in
respect of an area of water located at Cape Villaret.
The coordinates of the Cape Villaret A lease are as follows—
Boundary Corner Co-ordinates: Datum GDA94
Point Latitude Longitude
A 18° 13. 700’ S 121° 58. 000’ E
B 18° 13. 700’ S 121° 59. 400’ E
C 18° 15. 400’ S 121° 59. 400’ E
D 18° 15. 400’ S 121° 58. 000’ E
4 March 2022 GOVERNMENT GAZETTE, WA 465
Under Section 33(1) of the Pearling Act a person aggrieved by my decision may apply to the State
Administrative Tribunal (SAT) for a review of the decision. Application forms can be obtained from the
SAT located at 5/565 Hay Street, Perth WA or from the SAT’s website www.sat.justice.wa.gov.au. The
application together with any supporting documents should be lodged with the SAT within 28 days of
publication of this Notice. When an application is accepted by the Chief Executive Officer of the SAT,
the applicant is to give a copy of the application to the Chief Executive Officer, Department of Primary
Industries and Regional Development, 1 Nash Street, Perth WA 6000.
Dated this 25th day of February 2022.
NATHAN HARRISON, Director Aquatic Resource Management.
As delegate of the CEO.
———————————
FI403
FISH RESOURCES MANAGEMENT ACT 1994
SHARK BAY PRAWN MANAGED FISHERY MANAGEMENT PLAN 1993
Areas Closed to Fishing for Prawns in the Shark Bay Prawn Managed Fishery
Notice No. 1 of 2022
I, Rick Fletcher, Executive Director Fisheries and Agriculture Resource Management of the
Department of Primary Industries and Regional Development, Western Australia, in accordance with
clause 10 of the Shark Bay Prawn Managed Fishery Management Plan 1993, consider it in the better
interest of the Shark Bay Prawn Managed Fishery (Fishery) to hereby—
Cancel Notice of Areas Closed to Fishing for Prawns in the Shark Bay Prawn Managed Fishery:
Notice No. 3 of 2021 dated 29 June 2021.
Permit the trialling of gear between 0800 and 1600 hours each day from 3 April 2022 to 24 April
2022 provided no fish are held on board, or landed from, the authorised boat and from 24 April
2022 to 1 October 2022 provided the cod-end is open, in the area described as the Gear Trial
Area in the Schedule to this Notice.
Except as provided for under Clause 2 of this Notice, prohibit fishing for prawns in those parts
of the Fishery, between the times and dates provided for in items (a) to (i) below—
(a) fishing for prawns is prohibited from the date of the gazettal of Notice No. 1 of 2022 to
0800 hours on 1 October 2022 in the area defined as the Withnell Point Closure in the
Schedule to this Notice.
(b) fishing for prawns is prohibited from the date of the gazettal of Notice No. 1 of 2022 to
1700 hours on 22 May 2022 and from 0800 hours on 11 June 2022 to 0800 hours on
1 October 2022 in the area defined as the North Carnarvon Peron Line Closure in
the Schedule to this Notice.
(c) fishing for prawns is prohibited from the date of the gazettal of Notice No. 1 of 2022 to
1700 hours on 22 May 2022 in the area defined as the West Carnarvon Peron Line
Closure in the Schedule to this Notice.
(d) fishing for prawns is prohibited from the date of the gazettal of Notice No. 1 of 2022 to
1700 hours on 24 June 2022 in the area defined as the Central Carnarvon Peron Line
Closure in the Schedule to this Notice.
(e) fishing for prawns is prohibited from 0800 hours on 11 June 2022 to 1700 hours on
20 August 2022 in the area defined as the Denham Sound Closure in the Schedule to
this Notice.
(f) fishing for prawns is prohibited from the date of the gazettal of Notice No. 1 of 2022 to
0800 hours on 11 June 2022 in the area defined as the Snapper/Trawl Closure in the
Schedule to this Notice.
(g) fishing for prawns is prohibited from 1700 hours on 20 August 2022 to 0800 hours on
1 October 2022 in the area defined as the Extended Snapper/Trawl Closure in the
Schedule to this Notice.
(h) in parts of the Fishery within the area defined as North of Koks Island in the Schedule
to this Notice where fishing for prawns is not otherwise prohibited, fishing for prawns is
prohibited between 1000 hours and 1700 hours each day between the date of the gazettal
of Notice No. 1 of 2022 and 1 October 2022.
(i) in parts of the Fishery within the area defined as South of Koks Island in the Schedule
to this Notice where fishing for prawns is not otherwise prohibited, fishing for prawns is
prohibited between 0800 hours and 1700 hours each day between the date of the gazettal
of Notice No. 1 of 2022 and 1 October 2022.
Except as provided for under Clause 2 of this Notice, fishing for prawns is prohibited in all
parts of the Fishery outside of the fishing season which is from 1700 hours on 24 April 2022 to
0800 hours on 1 October 2022.
466 GOVERNMENT GAZETTE, WA 4 March 2022
Schedule 1
Gear Trial Area
The part of the Fishery bounded by a line commencing at a point at 24° 50′ south latitude and 113°
21.50′ east longitude; then extending due south along the meridian to a point at 24° 52.75′ south latitude
and 113° 21.50′ east longitude; then due east along the parallel to a point at 24° 52.75′ south latitude
and 113° 23.50′ east longitude; then due north along the meridian a point at 24° 50′ south latitude and
113° 23.50′ east longitude; then due west along the parallel to the commencement point.
Withnell Point Closure
The part of the Fishery bounded by a line commencing at point at 25° 36′ south latitude and 113° 01.63′
east longitude (on Dirk Hartog Island); then extending due east along the parallel to a point at 25° 36′
south latitude and 113° 03.75′ east longitude; then due south along the meridian to a point at 25° 38′
south latitude and 113° 03.75′ east longitude; then due west along the parallel to a point at 25° 38′
south latitude and 113° 02.29′ east longitude (on Dirk Hartog Island); then generally northerly along
the high water mark to the commencement point.
South Carnarvon Peron Line Closure
The part of the Fishery bounded by a line commencing at a point at 25° 26′ south latitude and 113°
45.24′ east longitude; then extending due west along the parallel to a point at 25° 26′ south latitude and
113° 40′ east longitude; then north-westerly along the geodesic to a point at 25° 20.40′ south latitude
and 113° 30.60′ east longitude; then due north along the meridian to a point at 25° 15.20′ south latitude
and 113° 30.60′ east longitude; then due east along the parallel to a point at 25° 15.20′ south latitude
and 113° 40.706′ east longitude; then south-easterly along the geodesic to the commencement point.
North of Koks Island
The part of the Fishery north of 24° 45.30′ south latitude.
South of Koks Island
The part of the Fishery south of 24° 45.30′ south latitude.
North Carnarvon Peron Line Closure
The part of the Fishery bounded by a line commencing at a point at 24° 52.75′ south latitude and 113°
37.60′ east longitude (on Babbage Island); then extending due west along the parallel to a point at 24°
52.75′ south latitude and 113° 21′ east longitude; then due south along the meridian to a point at 24°
58.10′ south latitude and 113° 21′ east longitude; then southerly along the geodesic to a point at 25° 03′
south latitude and 113° 22.46′ east longitude; then due east along the parallel to a point at 25° 03′ south
latitude and 113° 33.517′ east longitude; then northerly along the geodesic to a point at 24° 56.06′ south
latitude and 113° 31.887′ east longitude; then due east along the parallel to a point at 24° 56.06′ south
latitude and 113° 40.90′ east longitude (on the mainland); then generally north-westerly along the high
water mark to the commencement point.
North Carnarvon Peron Line Closure Extension
The part of the Fishery bounded by a line commencing at a point at 24° 50′ south latitude and 113°
37.60′ east longitude (on the mainland); then extending due west along the parallel to a point at 24° 50′
south latitude and 113° 21′ east longitude; then due south along the meridian to a point at 24° 52.75′
south latitude and 113° 21′ east longitude; then due east along the parallel to a point at 24° 52.75′ south
latitude and 113° 37.60′ east longitude (on Babbage Island); then generally northerly along the high
water mark to the commencement point.
Central Carnarvon Peron Line Closure
The part of the Fishery bounded by a line commencing at a point at 25° 03′ south latitude and 113°
33.517′ east longitude; then extending due west along the parallel to a point at 25° 03′ south latitude
and 113° 22.46′ east longitude; then south-easterly along the geodesic to a point at 25° 30.261 south
latitude and 113° 30.60 east longitude (on the mainland at Cape Peron North); then due north along
the meridian to a point at 25° 15.20 south latitude and 113° 30.60 east longitude; then due east along
the parallel to a point at 25° 15.20 south latitude and 113° 40.706 east longitude; then north-westerly
along geodesic to a point at 25° 12.727′ south latitude and 113° 39.668′ east longitude; then north-
westerly along the geodesic to a point at 25° 10.008′ south latitude and 113° 37.238′ east longitude; then
north-westerly along the geodesic to a point at 25° 04.801′ south latitude and 113° 33.94′ east longitude;
then generally northerly to the commencement point.
West Carnarvon Peron Line Closure
The part of the Fishery bounded by a line commencing at a point at 25° 32 south latitude and 113°
29.74 east longitude (on the mainland at Peron Peninsula); then extending due west along the parallel
to a point at 25° 32 south latitude and 113° 25 east longitude; then northerly along the geodesic to a
point at 25° 03 south latitude and 113° 22.46 east longitude; then south-easterly along the geodesic to
a point at 25° 30.261 south latitude and 113° 30.60 east longitude (on the mainland at Cape Peron
North); then generally south-westerly along the high water mark to the commencement point.
4 March 2022 GOVERNMENT GAZETTE, WA 467
Denham Sound Closure
The part of the Fishery south of a line commencing at a point at 25° 32 south latitude and 113° 29.74
east longitude (on the mainland at Peron Peninsula); then extending due west along the parallel to a
point at 25° 32 south latitude and 113° 25 east longitude; then westerly along the geodesic to a point
at 25° 31.25 south latitude and 113° 09.75 east longitude; then westerly along the geodesic to a point
at 25° 30′ south latitude and 113° 01.40′ east longitude (on Dirk Hartog Island at Cape Levillain); and
in that part of the Fishery east of a line commencing at a point at 26° 07.30′ south latitude and 113°
10.90′ east longitude (on Dirk Hartog Island at Surf Point); then south-westerly along the geodesic to a
point at 26° 08.62′ south latitude and 113° 09.60′ east longitude (on the mainland at Steep Point).
Snapper/Trawl Closure
The part of the Fishery south of a line commencing at a point at 25° 40.59′ south latitude and 113°
02.87′ east longitude (on Dirk Hartog Island); then extending due east along the parallel to a point at
25° 40.59′ south latitude and 113° 04.80′ east longitude; then south-easterly along the geodesic to a
point at 25° 41′ south latitude and 113° 05.63′ east longitude; then due east along the parallel to a point
at 25° 41′ south latitude and 113° 08′ east longitude; then south-easterly along the geodesic to a point
at 25° 46′ south latitude and 113° 13′ east longitude; then due east along the parallel to a point at 25°
46′ south latitude and 113° 19′ east longitude; then due north along the meridian to a point at 25° 38′
south latitude and 113° 19′ east longitude; then north-easterly along the geodesic to a point at 25° 32′
south latitude and 113° 25′ east longitude; then due east along the parallel to a point at 25° 32′ south
latitude and 113° 29.74′ east longitude (on the mainland at Peron Peninsula); and in that part of the
Fishery east of a line commencing at a point at 26° 07.30′ south latitude and 113° 10.90′ east longitude
(on Dirk Hartog Island at Surf Point); then south-westerly along the geodesic to a point at 26° 08.62′
south latitude and 113° 09.60′ east longitude (on the mainland at Steep Point).
Extended Snapper/Trawl Closure
The part of the Fishery south of a line commencing at a point at 25° 40.59′ south latitude and 113°
02.87′ east longitude (on Dirk Hartog Island); then extending due east along the parallel to a point at
25° 40.59′ south latitude and 113° 04.80′ east longitude; then south-easterly along the geodesic to a
point at 25° 41′ south latitude and 113° 05.63′ east longitude; then due east along the parallel to a point
at 25° 41′ south latitude and 113° 08′ east longitude; then south-easterly along the geodesic to a point
at 25° 42.40′ south latitude and 113° 09.40′ east longitude; then south along the meridian to a point at
25° 46.31′ south latitude and 113° 09.40′ east longitude; then south-easterly along the geodesic to a
point at 25° 48.65′ south latitude and 113° 12.17′ east longitude; then due east along the parallel to a
point at 25° 48.65′ south latitude and 113° 20.20′ east longitude; then due north along the meridian to
a point at 25° 40′ south latitude and 113° 20.20′ east longitude; then due west along the parallel to a
point at 25° 40′ south latitude and 113° 19′ east longitude; then north along the meridian to a point at
25° 38′ south latitude and 113° 19′ east longitude; then north-easterly along the geodesic to a point at
25° 32′ south latitude and 113° 25′ east longitude; then due east along the parallel to a point at 25° 32′
south latitude and 113° 29.74′ east longitude (on the mainland at Peron Peninsula).
Dated 28th of February 2022.
RICK FLETCHER, Executive Director, Fisheries and Agriculture
Resource Management as delegate for Chief Executive Officer.
———————————
FI404
FISH RESOURCES MANAGEMENT ACT 1994
STATEMENT OF DETERMINATION
Abalone Management Plan 1992
I, Heather Brayford, Deputy Director General Sustainability and Biosecurity as delegate for the Chief
Executive Officer of the Department of Primary Industries and Regional Development Western
Australia, pursuant to clause 11(3) of the Abalone Management Plan 1992, hereby make a
determination in regard to the maximum quantity of abalone that may be taken from the relevant areas
of the Abalone Managed Fishery during the licensing period commencing on 1 April 2022, as set out
below—
Area 1—
5,000 kilograms of Roe’s abalone (whole weight)
1,200 kilograms of Greenlip abalone (meat weight)
60 kilograms of Brownlip abalone (meat weight)
Area 2—
16,200 kilograms of Roe’s abalone (whole weight)
6,000 kilograms of Greenlip abalone (meat weight)
1,500 kilograms of Brownlip abalone (meat weight)
Area 3—
4,000 kilograms of Greenlip abalone (meat weight)
4,500 kilograms of Brownlip abalone (meat weight)
468 GOVERNMENT GAZETTE, WA 4 March 2022
Area 4—
0 kilograms of Greenlip abalone (meat weight)
0 kilograms of Brownlip abalone (meat weight)
Area 5—
18,000 kilograms of Roe’s abalone (whole weight)
Area 6—
7,500 kilograms of Roe’s abalone (whole weight)
Area 7—
29,100 kilograms of Roe’s abalone (whole weight)
Area 8—
0 kilograms of Roe’s abalone (whole weight)
Dated this 24th day of February 2022.
HEATHER BRAYFORD, Deputy Director General Sustainability and
Biosecurity as delegate for the Chief Executive Officer.
———————————
FI405
FISH RESOURCES MANAGEMENT ACT 1994
ABALONE MANAGEMENT PLAN 1992
Closure Within the Fishery
I, Heather Brayford, Deputy Director General Sustainability and Biosecurity as delegate for the Chief
Executive Officer of the Department of Primary Industries and Regional Development Western
Australia, and pursuant to clause 16(1) of the Abalone Management Plan 1992, am of the opinion that
a prohibition on fishing is required in the better interests of the Fishery, and I prohibit fishing for
Greenlip Abalone in the Augusta sub-area within Area 3 of the Fishery until 31 March 2023.
Augusta sub-area—
All waters bounded by a line commencing at a point at 33° 38.676′ south latitude and 115° 20.675′
east longitude (on the mainland near Busselton Jetty); then extending due north along the
meridian to a point at 33° 29′ south latitude and 115° 20.675′ east longitude; then extending due
east along the parallel to a point at 33° 29′ south latitude and 114° 30′ east longitude; then
extending due south along the meridian to a point at 35° 00′ south latitude and 114° 30′ east
longitude; then extending due west along the parallel to a point at 35° 00′ south latitude and 115°
24′ east longitude; then extending due north along the meridian to a point at 34° 20.048′ south
latitude and 115° 24′ east longitude (on the mainland); then generally westerly, northerly and
easterly along the high water mark to the commencement point.
Dated this 24th day of February 2022.
HEATHER BRAYFORD, Deputy Director General Sustainability and
Biosecurity as delegate for the Chief Executive Officer.
JUSTICE
JU401
COURT SECURITY AND CUSTODIAL SERVICES ACT 1999
PERMIT DETAILS
Pursuant to the provisions of section 56(1) of the Court Security and Custodial Services Act 1999, the
Commissioner of Corrective Services has revoked the following Permits to do High-Level Security
Work—
Surname First Name(s) Permit Number Date Permit Revoked
Shepherd Candice WLG-18020-1 21/02/2022
Hurley Andrew WLG-19029 21/02/2022
O’Neill Monique WLG-19058 21/02/2022
This notice is published under section 57(1) of the Court Security and Custodial Services Act 1999.
TRACY MUIR, A/Director Strategic Business Development.
———————————
4 March 2022 GOVERNMENT GAZETTE, WA 469
JU402
JUSTICES OF THE PEACE ACT 2004
RESIGNATIONS
It is hereby notified for public information that the Minister has accepted the resignation of—
Patricia Ruth Floan of Oldbury
Michael Thomas Howieson of Gwelup
Joan Claire Jacobs of Hamilton Hill
John Alexander MacMillan of Victoria Park
Ian Charles Leslie McIntosh of Mosman Park
from the Office of Justice of the Peace for the State of Western Australia.
JOANNE STAMPALIA, Executive Director, Court and Tribunal Services.
———————————
JU403
JUSTICES OF THE PEACE ACT 2004
APPOINTMENTS
It is hereby notified for public information that the Governor in Executive Council has approved of the
following to the Office of Justice of the Peace for the State of Western Australia—
Edward William Francis Clouter of Riverton
Ian James Rawlings of Mount Lawley
JOANNE STAMPALIA, Executive Director, Court and Tribunal Services.
———————————
JU404
COURT SECURITY AND CUSTODIAL SERVICES ACT 1999
PERMIT DETAILS
Pursuant to the provisions of section 51(1) of the Court Security and Custodial Services Act 1999, the
Commissioner of Corrective Services has issued the following Permits to do High-Level Security Work—
Surname First Name(s) Permit Number Permit Issue Date
Waycott Kevin Sidney BRS-200004 23/02/2022
Nangle Mark Stephen BRS-210084 23/02/2022
Platt Nikkita Simone BRS-210070 23/02/2022
Italiano Daniel BRS-210063 23/02/2022
This notice is published under section 57(1) of the Court Security and Custodial Services Act 1999.
SUE HOLT, Assistant Director, Prisoner Transport and
Custodial Services Contract Management.
LOCAL GOVERNMENT
LG401
LOCAL GOVERNMENT ACT 1995
Shire of Augusta Margaret River
BASIS OF RATES
I, Tim Fraser, being delegated by the Minister of the Crown to whom the administration of the Local
Government Act 1995 is committed by the Governor, and acting pursuant to section 6.28 (1) of that Act,
hereby, and with effect from 22 February 2022, determined that the method of valuation to be used by
the Shire of Augusta Margaret River as the basis for a rate in respect of the land referred to in the
Schedule is to be the gross rental value of the land;
Schedule
Designated Land
UV to GRV
All those portions of land being Lot 102, Lot 235 and Lots 237 to
261 inclusive as shown on Deposited Plan 421379.
TIM FRASER, Executive Director Local Government,
Department of Local Government, Sport and Cultural Industries.
———————————
470 GOVERNMENT GAZETTE, WA 4 March 2022
LG402
LOCAL GOVERNMENT ACT 1995
CITY OF WANNEROO
FENCING LOCAL LAW 2021
Under the powers conferred by the Local Government Act 1995 and under all other enabling powers,
the Council of the City of Wanneroo resolved on 15 February 2022 to make the following local law.
PRELIMINARY
1.1 Citation and application
This local law may be cited as the City of Wanneroo Fencing Local Law and shall apply throughout the
district.
1.2 Commencement
This local law will come into operation 14 days after the date of its publication in the Government
Gazette.
1.3 Repeal and transitional provisions
The City of Wanneroo Fencing Local Law 2016, published in the Government Gazette, Number 137
dated 28 July 2016, is repealed.
A permit or other authorisation under a repealed local law that is in force before the commencement
day is to be regarded on and after that day as a permit under this local law and may be dealt with
accordingly.
1.4 Definitions and interpretation
In this local law unless the context requires otherwise—
Act means the Local Government Act 1995;
AS/NZS means an Australian or Australian/New Zealand Standard (as applicable) published by
Standards Australia, as amended from time to time;
authorised person means a person authorised by the local government under section 9.10 of the
Act to carry out any of the functions of an authorised person under this local law;
Building Code has the meaning given to it in regulation 3 of the Building Regulations 2012;
building permit has the meaning given to it in the Building Act 2011;
commercial lot means a lot zoned commercial, mixed use or business or an equivalent commercial
zone under the local planning scheme and/or structure plan, but does not include a lot occupied
by a residential building;
dangerous, in relation to any fence, means—
(a) an electrified fence, or one containing barbed or razor wire, other than a fence that is
constructed and maintained in accordance with this local law;
(b) a fence containing exposed broken glass, asbestos fibre or any other potentially harmful
projection or material; or
(c) a fence which is likely to collapse or fall, or part of which is likely to collapse or fall, from
any cause;
district means the district of the City of Wanneroo and includes any area placed under the
jurisdiction of the City pursuant to any Act or Regulation;
dividing fence has the meaning given to it in the Dividing Fences Act 1961 (as amended from time
to time);
electrified fence means a fence carrying or designed to carry an electric charge;
fence means any structure, not including a retaining wall, that is used or functions as a barrier,
irrespective of where it is located, and includes any gate;
front boundary means the boundary that separates a thoroughfare and the front of a lot;
front fence means a fence in the front setback area of a lot;
front setback means the horizontal distance between the front boundary and a wall of a building,
measured at a right angle to the front boundary;
height, in relation to a fence, means the vertical distance between—
(a) the top of the fence at any point; and
(b) the ground level or, where the ground levels on each side of the fence are not the same, the
higher ground level immediately below that point;
industrial lot means a lot situated within a general industrial or service industrial zone or an
equivalent industrial zone under the local planning scheme and/or structure plan;
land means land in the district and includes a house, building, work or structure, in or on the land;
local government means the City of Wanneroo;
4 March 2022 GOVERNMENT GAZETTE, WA 471
local planning scheme means a local planning scheme made by the local government under the
Planning and Development Act 2005;
lot has the meaning given to it in the Planning and Development Act 2005;
occupier where used in relation to land means the person by whom or on whose behalf the land is
actually occupied or, if there is no occupier, the person entitled to possession of the land;
open fence means a fence—
(a) that has continuous vertical or horizontal gaps of 50 mm or greater width comprising not
less than one third of the total surface area; or
(b) that has continuous vertical or horizontal gaps less than 50 mm in width, comprising at
least one half of the total surface area in aggregate; or
(c) that has a surface offering equal or lesser obstruction to view; and
(d) the lower portion of which may be closed up to a height of 1.2 m above the natural ground
level measured from the primary street side of the fence;
owner, for the purposes of the definition of ‘dividing fence’, has the meaning given to it in the
Dividing Fences Act 1961;
owner, for all other purposes, has the meaning given to it in the Act;
penalty unit has the meaning given to it in the City of Wanneroo Penalty Units Local Law 2015;
person means any natural person, company, public body, association or body of persons, corporate
or unincorporated and includes an owner, occupier, licensee and permit holder (as applicable),
but does not include the local government;
public place means a place to which the public has access;
reserve means land (including a parkland or foreshore) in or adjoining the district that is—
(a) set apart for the use and enjoyment of the public; or
(b) acquired for public purposes and vested in or under the care, control and management of
the local government;
residential lot means any lot—
(a) situated within a residential, special residential or smart growth
community zone as classified by the local planning scheme and/or structure plan; or
(b) which is or will be predominantly used for residential purposes; but does
not include a rural lot;
retaining wall means any structure which prevents the movement of soil in order to allow ground
levels of different elevations to exist adjacent to one another;
rural lot means any lot situated within a general rural, special rural, rural resource, rural
community, landscape enhancement or an equivalent rural zone as classified by the local
planning scheme;
structure plan has the meaning given to it in the local planning scheme;
sufficient fence means a fence described in section 2.2;
thoroughfare has the meaning given to it in the Act, but does not include a private thoroughfare
which is not under the management or control of the local government; and
uniform fence means a fence erected by a developer or subdivider in accordance with a subdivision
approval which divides a residential lot from a public place such as a pedestrian access way,
public open space or road reserve.
Any other expression used in this local law and not defined herein shall have the meaning given to
it in the Act or the Dividing Fences Act 1961 (as applicable).
1.5 Relationship with other laws
In the event of any inconsistency between the provisions of a local planning scheme and the
provisions of this local law, the provisions of the local planning scheme will prevail.
Except as described below, nothing in this local law affects the need for compliance, in respect of a
fence, with any relevant provisions—
(a) of a local planning scheme; and
(b) that apply if a building permit is required for a fence under the Building Act 2011 or Building
Regulations 2012.
A dividing fence constructed and maintained as a sufficient fence under this local law does not
require a building permit.
472 GOVERNMENT GAZETTE, WA 4 March 2022
FENCING GENERAL
2.1 Dividing fences
Unless by agreement between the owners of adjoining lots, a person must—
(a) not construct or alter a dividing fence on a lot so that it does not satisfy the requirements for a
sufficient fence as set out in this local law;
(b) not attach anything to a dividing fence;
(c) maintain a dividing fence in a condition which satisfies the requirements of a sufficient fence;
or
(d) not alter the level of the ground adjoining the boundary so as to change the height of a dividing
fence unless the dividing fence is altered, reconstructed or relocated so as to satisfy the
requirements of a sufficient fence.
An agreement in respect of a dangerous fence is taken not to be an agreement between owners of
adjoining lots for the purposes of section 2.1(1) of this local law.
Without limiting section 1.5, an agreement between the owners of adjoining lots does not negate the
need to obtain approval under any other written law.
2.2 Sufficient fence
Subject to subsections (2) and (3), a sufficient fence—
(a) on a residential lot is a dividing fence constructed and maintained in accordance with the
requirements of Schedule 1.
(b) on a commercial lot or an industrial lot is a dividing fence constructed and maintained in
accordance with the requirements of Schedule 2; and
(c) on a rural lot is a dividing fence constructed and maintained in accordance with the
requirements of Schedule 3.
Where a fence is constructed on or near the boundary between a residential lot and any of the
following—
(a) an industrial lot;
(b) a commercial lot; or
(c) a rural lot,
a sufficient fence is a dividing fence constructed and maintained in accordance with the requirements
of Schedule 1.
Where—
(a) the zoning of a lot is changed from ‘Rural’ to ‘Residential’ under a local planning scheme; and
(b) immediately before that zoning change a dividing fence on that lot is a sufficient fence,
the requirements of Schedule 1 will not apply to that dividing fence until a residential use becomes the
predominant use for that lot.
A dividing fence or any fence lawfully erected prior to this local law coming into operation constitutes
a sufficient fence.
2.3 Fencing within the front setback area
On a residential lot, a front fence shall be constructed of face finished brick, concrete, stone or timber
palings, or a combination of the aforementioned materials or similar (but excluding fibre cement
sheeting or sheet metal), that complement the dwelling and do not detract from the streetscape.
On an industrial lot, a fence erected within the front setback area shall be constructed and
maintained as an open fence and not exceed a height of 2.4m.
On a rural lot, a front fence shall be—
(a) not greater than 1.2m in height; or
(b) if greater than 1.2m in height, constructed and maintained as an open fence and must not
exceed 1.8m in height.
2.4 Sightlines at vehicle access point
A fence adjacent to any vehicle access point, or where two streets intersect, must be truncated with the
minimum dimension of the truncation being 1.5m or the fence reduced in height to no more than 0.75m.
2.5 Maintenance of fences
This section applies to a fence that is—
(a) a front fence; or
(b) a fence that separates a lot and a thoroughfare.
An owner or occupier of a lot on which a fence is constructed must maintain the fence in good
condition so as to prevent it from becoming dangerous, dilapidated, unsightly, or prejudicial to the
amenity of the locality.
4 March 2022 GOVERNMENT GAZETTE, WA 473
An owner or occupier of a lot adjacent to a uniform fence must, where that fence is damaged,
dilapidated or in need of repair, ensure that—
(a) it is repaired or replaced with the same or similar materials with which it was first constructed;
and
(b) so as far as practicable the repaired or replaced section is the same, including of same height,
as the original fence.
2.6 Prohibited fencing materials
In constructing or maintaining a fence a person must not use—
(a) except where specifically allowed by this local law, broken glass or any other potentially
harmful projection or material;
(b) asbestos fibre;
(c) any material that is likely to collapse or fall, or part of which is likely to collapse or fall, from
any cause; or
(d) pre-used materials, unless they are painted or treated to the satisfaction of the local
government.
2.7 Gates in fences
A person must not construct or maintain on a lot a gate in a fence, unless the gate opens—
(a) into the subject lot; or
(b) by sliding parallel on the inside of the fence, which it forms part of, when closed.
BARBED AND RAZOR WIRE FENCES
3.1 Barbed and razor wire fences
On a residential lot or any other lot abutting such a lot, a person shall not erect or affix to any fence
any barbed wire, razor wire or other material with spiked or jagged projections.
On an industrial lot or a commercial lot, a person shall not erect or affix to any fence bounding that
lot any barbed wire, razor wire or other materials with spiked or jagged projections unless the wire or
materials are not less than 2.0m from ground level.
If the posts which carry the barbed wire, razor wire or other materials referred to in subsection (2)
are angled towards the outside of the lot bounded by the fence, the face of the fence must be set back
from the lot boundary a sufficient distance to ensure that the angled posts, barbed wire or other
material do not encroach on adjoining land.
On a rural lot, a person shall not place or affix barbed wire upon a fence on that lot where the fence
is adjacent to a thoroughfare or other public place unless the barbed wire is fixed to the side of the fence
posts furthest from the thoroughfare or other public place.
ELECTRIFIED FENCES
4.1 Electrified fences
On a residential lot or commercial lot or any other lot abutting such a lot, a person shall not erect
or affix an electrified fence.
On a rural lot or industrial lot, an electrified fence shall—
(a) comply with any applicable AS/NZS;
(b) comply with any requirements of Western Power; and
(c) be inoperable during the hours of business, if any.
ENFORCEMENT
5.1 Offences and general penalty
A person who fails to do anything required or directed to be done under this local law, or who does
anything which under this local law that person is prohibited from doing, commits an offence.
A person who commits an offence under this local law is liable, on conviction, to a penalty not less
than $500 and not exceeding $5,000 and, if the offence is of a continuing nature, to an additional daily
penalty not exceeding $500 for each day or part of a day during which the offence has continued.
5.2 Prescribed offences
An offence against a section of this local law specified in Schedule 4 is a prescribed offence for the
purposes of section 9.16 of the Act.
The number of modified penalty units for a prescribed offence is that specified in the fourth column
of Schedule 4.
If this local law expresses a modified penalty as a number of penalty units, the monetary value of
the modified penalty is the number of dollars obtained by multiplying the value of the penalty unit by
the number of penalty units.
5.3 Form of infringement notices
For the purposes of this local law—
474 GOVERNMENT GAZETTE, WA 4 March 2022
the form of the infringement notice referred to in section 9.16 of the Act is Form 2 in Schedule 1 of
the Local Government (Functions and General) Regulations 1996; and
the form of the infringement withdrawal notice referred to in section 9.20 of the Act is Form 3 in
Schedule 1 of the Local Government (Functions and General) Regulations 1996.
————
Schedule 1
(section 2.2(1)(a))
A SUFFICIENT FENCE ON A RESIDENTIAL LOT BEHIND THE FRONT SETBACK
This Schedule does not apply to a uniform fence or a front fence.
Refer to section 2.3 of this local law for fences within the front setback area.
On a residential lot, a sufficient fence is a dividing fence that—
(a) is constructed of—
(i) corrugated fibre-reinforced pressed cement sheeting;
(ii) timber palings;
(iii) masonry (including brick, stone or concrete);
(iv) factory coloured sheet metal post and panelled fence;
(v) PVC panel (eg. Duralock); or
(vi) any combination of the materials described in paragraphs (i)-(v); and
(b) is between 1.75m and 1.85m in height; and
(c) where constructed of masonry, is in accordance with AS/NZS for masonry construction that has
been adopted by the Building Code at the time of construction.
————
Schedule 2
(section 2.2(1)(b))
A SUFFICIENT FENCE ON A COMMERCIAL LOT OR INDUSTRIAL LOT
This Schedule does not apply to a uniform fence or a front fence.
Refer to section 2.3 of this local law for fences within the front setback area.
On a commercial lot or industrial lot, a sufficient fence is a dividing fence that—
(a) is constructed of—
(i) link mesh, chain mesh or steel mesh and is no higher than 2.0m, unless it is topped with
up to three strands of barbed wire to a total height of no more than 2.4m;.
(ii) fibre reinforced cement sheets;
(iii) painted or galvanized steel or aluminium sheeting; or
(iv) timber or masonry (including brick, stone or concrete); and
(b) is no more than 2.4m in height; and
(c) where constructed of masonry, is in accordance with AS/NZS for masonry construction that has
been adopted by the Building Code at the time of construction.
————
Schedule 3
(section 2.2(1)(c))
A SUFFICIENT FENCE ON A RURAL LOT
This Schedule does not apply to a uniform fence or a front fence.
On a rural lot, a sufficient fence is a dividing fence that—
(a) is at least 1.2m in height; and
(b) is constructed of posts and wire.
————
4 March 2022 GOVERNMENT GAZETTE, WA 475
Schedule 4
(section 5.2)
PRESCRIBED OFFENCES AND MODIFIED PENALTIES
Item
No Clause No Nature of Offence Penalty
Unit
Part 2—Fencing—general
1 2.1(1)(a) Constructing or altering a dividing fence which is not a
sufficient fence
25
2 2.1(1)(b) Attaching anything to a dividing fence 25
3 2.1(1)(c) Failing to maintain a fence in a condition to satisfy
requirements of a sufficient fence
25
4 2.1(1)(d) Altering ground level of a fence without satisfying the
requirements of a sufficient fence
25
5 2.3(1) Constructing a front fence of a material that does not
complement the dwelling or detracts from the streetscape
25
6 2.3(2) Constructing a fence on an industrial lot that is not an open
fence or is in excess of 2.4m
25
7 2.3(3) Constructing a fence on a rural lot that is greater than 1.2m
in height or, if greater than 1.2m in height, that is not an
open fence or is in excess of 1.8m
25
8 2.4 Constructing a fence adjacent to a vehicle access point
without a truncation
25
9 2.5(2) Failure to maintain a fence in good condition to prevent fence
becoming dangerous, dilapidated, unsightly
25
10 2.6 Using a prohibited material in the construction or
maintenance of a fence
25
11 2.7 Constructing or maintaining a gate in a fence not opening
into the lot or by sliding parallel and on the inside of the
fence
25
Part 3—Barbed and razor wire fences
12 3.1(1) Using barbed or razor wire, spiked or jagged projections in a
fence on a residential lot, special residential lot or any other
lot abutting such a lot.
25
13 3.1(2) Having and using a barbed or razor wire fence on a
commercial or industrial lot at a height lower than 2m
25
14 3.1(3) Constructing a fence with barbed wire that encroaches into
adjoining land
25
15 3.1(4) Placing or affixing barbed wire on the side of a fence on a
rural lot that faces a thoroughfare or other public place
25
Part 4—Electrified fences
16 4.1 Having and using an electrified fence on a residential lot,
commercial lot or any other lot abutting such a lot
25
17 4.1(2)(a) Having and using an electric fence on a rural lot or industrial
lot that is non-compliant with any applicable AS/NZS
25
18 4.1(2)(b) Having or using an electric fence on a rural lot or industrial
lot that does not comply with the requirements of Western
Power
25
19 4.1(2)(c) Operating an electric fence on a rural lot or industrial lot
during business hours
25
20 5.1 Other offences not specified 25
————
Dated 22 February 2022.
The Common Seal of the City of Wanneroo was affixed by authority of a resolution of the Council in the
presence of—
TRACEY GARDNER ROBERTS, Mayor.
DANIEL JOHN SIMMS, Chief Executive Officer.
———————————
476 GOVERNMENT GAZETTE, WA 4 March 2022
LG403
CITY OF KALGOORLIE-BOULDER
APPOINTMENTS
The City of Kalgoorlie-Boulder wishes to advise for public information the appointment of Susie
Beamish and Christie Butterworth as authorised officers to operate within the City of Kalgoorlie-
Boulder to enforce the following Acts, Regulations and Local Laws effective immediately–
• Local Government Act 1995
• Local Government (Miscellaneous Provisions) Act 1960
• Dog Act 1976 and Regulations
• Cat Act 2011 and Regulations
• Litter Act 1979 and Regulations
• Bush Fires Act 1954 and Regulations— (Bush Fire Control Officer)
• Bush Fires (Infringements) Regulations 1978
• Control of Vehicles (Off-road Areas) Act 1978 and Regulations
• Caravan Parks and Camping Grounds Act 1995 and Regulations 1997
• City of Kalgoorlie-Boulder Local Laws
In addition, Kodi Sticklen, Peter Curran and Tim Hanson have been appointed as authorised officers
to operate within the City of Kalgoorlie-Boulder to enforce the following Acts, Regulations and Local
Laws effective immediately–
• Local Government Act 1995
• Local Government (Miscellaneous Provisions) Act 1960
• Litter Act 1979 and Regulations
• City of Kalgoorlie-Boulder Local Laws
ALEX WIESE, Acting Chief Executive Officer.
MINERALS AND PETROLEUM
MP401
MINING ACT 1978
APPLICATION FOR AN ORDER FOR FORFEITURE
Department of Mines, Industry Regulation and Safety,
Meekatharra WA 6642.
In accordance with Regulation 49(2)(c) of the Mining Regulations 1981, notice is hereby given that the
following licences are liable to forfeiture under the provision of Section 96(1)(a) of the Mining Act 1978
for breach of covenant, being failure to comply with the prescribed expenditure conditions and/or non-
compliance with the reporting provisions.
WARDEN WHITE.
————
To be heard by the Warden at Meekatharra on 20 April 2022.
PEAK HILL MINERAL FIELD
Prospecting Licences
P 52/1610 Morning Star Mining Pty Ltd
———————————
4 March 2022 GOVERNMENT GAZETTE, WA 477
MP402
MINING ACT 1978
APPLICATION FOR AN ORDER FOR FORFEITURE
Department of Mines, Industry Regulation and Safety,
Marble Bar WA 6760.
In accordance with Regulation 49(2)(c) of the Mining Regulations 1981, notice is hereby given that the
following licences are liable to forfeiture under the provision of Section 96(1)(a) of the Mining Act 1978
for breach of covenant, being failure to comply with the prescribed expenditure conditions and/or non-
compliance with the reporting provisions.
WARDEN MacLEAN.
————
To be heard by the Warden at Marble Bar on 21 April 2022.
PILBARA MINERAL FIELD
Prospecting Licences
P 45/3100-S West, Robert
Brettner, Keelan
Wally, Bevon
Dann, Robert
P 46/1939 Young, John William
P 46/1954 Parsonage, Darrol Terence
———————————
MP403
MINING ACT 1978
APPLICATION FOR AN ORDER FOR FORFEITURE
Department of Mines, Industry Regulation and Safety,
Mt. Magnet WA 6638.
In accordance with Regulation 49(2)(c) of the Mining Regulations 1981, notice is hereby given that the
following licences are liable to forfeiture under the provision of Section 96(1)(a) of the Mining Act 1978
for breach of covenant, being failure to comply with the prescribed expenditure conditions and/or non-
compliance with the reporting provisions.
WARDEN WHITE.
————
To be heard by the Warden at Mt. Magnet on 21 April 2022.
MURCHISON MINERAL FIELD
Prospecting Licences
P 20/2230 Rise Success International Development Pty Ltd
P 58/1863 Goodrick, Scott Anthony
YALGOO MINERAL FIELD
Prospecting Licences
P 59/2220-S Noble, James Ian
P 59/2238-S Blair, Steven Glenn
P 59/2240 D’Agostino, Carmello Tony
———————————
478 GOVERNMENT GAZETTE, WA 4 March 2022
MP404
MINING ACT 1978
APPLICATION FOR AN ORDER FOR FORFEITURE
Department of Mines, Industry Regulation and Safety,
Marble Bar WA 6760.
In accordance with Regulation 49(2)(c) of the Mining Regulations 1981, notice is hereby given that the
following licences are liable to forfeiture under the provision of Section 96(1)(a) of the Mining Act 1978
for breach of covenant, being failure to comply with the prescribed expenditure conditions and/or non-
compliance with the reporting provisions.
WARDEN MacLEAN.
————
To be heard by the Warden at Marble Bar on 21 April 2022.
PILBARA MINERAL FIELD
Prospecting Licences
P 45/2897 Hanson Construction Materials Pty Ltd
———————————
MP405
MINING ACT 1978
INSTRUMENT OF VARIATION OF EXEMPTION OF LAND
I, Kristian Hartley Dawson, Executive Director, Resource Tenure, pursuant to section 19 of the Mining
Act 1978 hereby vary the exemption originally declared on 23 May 1989 and published in the
Government Gazette dated 16 June 1989 by varying the description to that as described hereunder (not
being private land or land that is the subject of a mining tenement or an application for a mining
tenement) from Divisions 1 to 5 of Part IV of the Mining Act 1978.
Locality
Carnarvon
Description of Land
Land designated S19/83 in the TENGRAPH electronic plan of the Department of Mines, Industry
Regulation and Safety. A geospatial description is filed in the Department of Mines, Industry
Regulation and Safety electronic file number A2671/201901, document ID 8991215.
Area of Land
776.96 hectares
Dated at Perth this 28th day of February 2022.
KRISTIAN HARTLEY DAWSON, Executive Director, Resource Tenure.
———————————
MP406
MINING ACT 1978
INSTRUMENT OF VARIATION OF EXEMPTION OF LAND
I, Kristian Hartley Dawson, Executive Director, Resource Tenure, pursuant to section 19 of the Mining
Act 1978 hereby vary the exemption originally declared on 4 September 2019 and published in the
Government Gazette dated 20 September 2019 by varying the description to that as described hereunder
(not being private land or land that is the subject of a mining tenement or an application for a mining
tenement) from Divisions 1 to 5 of Part IV of the Mining Act 1978.
Locality
Kennedy Range National Park
Description of Land
Land designated S19/385 in the TENGRAPH electronic plan of the Department of Mines, Industry
Regulation and Safety. A geospatial description is filed in the Department of Mines, Industry
Regulation and Safety electronic file number A1185/201901, document ID 8995163.
Area of Land
505,998.81 hectares
Dated at Perth this 18th day of February 2022.
KRISTIAN HARTLEY DAWSON, Executive Director, Resource Tenure.
4 March 2022 GOVERNMENT GAZETTE, WA 479
PLANNING
PL401
PLANNING AND DEVELOPMENT ACT 2005
APPROVED LOCAL PLANNING SCHEME AMENDMENT
City of Swan
Local Planning Scheme No. 17—Amendment No. 182
Ref: TPS/2557
It is hereby notified for public information, in accordance with section 87 of the Planning and
Development Act 2005 that the Minister for Planning approved the City of Swan Local Planning Scheme
amendment on 10 February 2022 for the purpose of—
(a) Insert the following exempted development into Schedule 5 of the scheme text and locate this
new entry between the existing ‘Shade Structure’ and ‘Swimming Pool/Spa’ entries—
Exempted
Development
Applicable
Zones/Reserves
Conditions applying to the exempted development
Solar Collectors
incidential to
buildings
All zones Where the development meets all of the following
criteria—
• is installed on the roof or other part of buildings;
• a maximum projection no greater than 1.5 metres
from the highest point of the building to which it
is attached to;
• is incidental to an approved land use;
• satisfies the deemed-to-comply requirements of
the R-Codes, if the R-Codes apply to the
development;
• is not located in a place—
• entered in the Register of Heritage Places
under the Heritage Act 2018;
• the subject of an order under the Heritage
Act 2018;
• the subject of a heritage agreement entered
into under the Heritage Act 2018;
• is not located within a Heritage Area designated
by this Scheme and is not on a lot that contains a
place on the Heritage List prepared in accordance
with this Scheme,
Or;
Where the development is located within a Heritage
Area designated by this Scheme or a lot that contains a
place on the Heritage Lost prepared in accordance with
this Scheme and meets all of the following criteria—
• is installed flush-mounted on the roof or other
part of buildings that does not face any adjoining
street or public land;
• satisfies the deemed-to-compl requirements of the
R-Codes, if the R-Codes apply to the development;
• is not located in a place—
• entered in the Register of Heritage Places
under the Heritage Act 2018;
• the subject of an order under the Heritage
Act 2018, and;
• the subject of a heritage agreement entered
into under the Heritage Act 2018.
D LUCAS, Mayor.
M J FOLEY, Chief Executive Officer.
———————————
480 GOVERNMENT GAZETTE, WA 4 March 2022
PL402
PLANNING AND DEVELOPMENT ACT 2005
APPROVED LOCAL PLANNING SCHEME AMENDMENT
City of Swan
Local Planning Scheme No. 17—Amendment No. 194
Ref: TPS/2754
It is hereby notified for public information, in accordance with section 87 of the Planning and
Development Act 2005 that the Minister for Planning approved the City of Swan Local Planning Scheme
amendment on 10 February 2022 for the purpose of—
(a) Modify the wording of Condition No.2 of Special Use Zone No.24 in Schedule 4—Special Use
Zones as follows—
No. Description of Land Special Use Conditions
24 Lot 57 on P28643 West
Parade; Lot 9000 on
DP30961 West Parade;
Lot 200 on DP30961
West Parade; Lot 1 on
P7052 West Parade,
South Guildford.
Precinct 1—Lot 57 on
P28643, portion of Lot
9000 on DP30961 and
portion Lot 1 on P7052
West Parade, South
Guildford, as depicted
in the Precinct Map.
Precinct 2—Lot 200 on
P30961 (including
whole of existing
Lodge), portion of Lot
9000 on DP30961 and
portion Lot 1 on P7052
West Parade, South
Guildford, as depicted
in the Precinct Map.
Subdivision and development shall be in
accordance with a Structure Plan prepared in
accordance with the provisions of Part 4 of the
Planning and Development (Local Planning
Scheme) Regulations 2015.
Residential development shall be at a
maximum density of R20, except where land is
below the 20 ANEF exposure level, in which case
the applicable density shall be in accordance with
the Rosehill Waters Structure Plan.
Notwithstanding the provisions of State
Planning Policy 5.1 Land Use Planning in the
Vicinity of Perth Airport, noise insulation in
accordance with AS2021-2015: Acoustics—
Aircraft Noise Intrusion—Building Siting and
Construction is required as a minimum for
residential development within the 20-25 ANEF
contour.
A notification is to be included on all titles and
within sale contracts, to be signed and
acknowledged by all purchasers, which states as
follows—
This land is subjected to aircraft noise at any
time by the 24 hour a day, 7 day a week
passenger and freight aircraft flight operations
arriving and departing Perth Airport.
The frequency of aircraft movements and the size
of aircraft are forecast to increase indefinitely
into the future.
It is the responsibility of landowners to noise
alteruate their property to ensure their amenity,
as Perth Airport will remain curfew free.
Signage indicating ‘Aircraft Noise Area’ is to be
erected and maintained to the east and west of
the development on West Parade. Such signage is
to be erected prior to the sale of any lot or the
advertising of the lots for sale and is to be
maintained permanently thereafter.
(and subsequent provisions as stated thereafter)
D LUCAS, Mayor.
J EDWARDS, Chief Executive Officer.
———————————
4 March 2022 GOVERNMENT GAZETTE, WA 481
PL403
PLANNING AND DEVELOPMENT ACT 2005
APPROVED LOCAL PLANNING SCHEME AMENDMENT
City of Greater Geraldton
Local Planning Scheme No. 1—Amendment No. 17
Ref: TPS/2805
It is hereby notified for public information, in accordance with section 87 of the Planning and
Development Act 2005 that the Minister for Planning approved the City of Greater Geraldton Local
Planning Scheme amendment on 30 November 2021 for the purpose of—
Rezoning Lot 156 (No. 331) Place Road, Strathalbyn from ‘Residential R5’ to ‘Commercial’; and
Modifying the Scheme Map accordingly.
S G VAN STYN, Mayor.
R MCKIM, Chief Executive Officer.
———————————
PL404
PLANNING AND DEVELOPMENT ACT 2005
APPROVED LOCAL PLANNING SCHEME AMENDMENT
City of Armadale
Ref: TPS/2695
It is hereby notified for public information, in accordance with section 87 of the Planning and
Development Act 2005 that the Minister for Planning approved the City of Armadale Local Planning
Scheme amendment on 22 February 2022 for the purpose of—
(a) Amending Special Control Map 3 as shown on the attached Proposed Zoning—Special Control
Area Map 3 Plan and include the area as Development Contribution Area No. 8 and insert
Development Contribution Plan No. 8 into Schedule 9B of Town Planning Scheme No. 4 as
follows—
No. Description of
Land
Contribution Arrangements
8 Development
Contribution
Area (DCA) 8—
West of Rail
Redevelopment
Area as identified
on Scheme
Special Control
Area Map 3.
4.1 Relationship to other plans and other parts of the Scheme
The development contribution plan generally conforms to the
Approved Structure Plans for Development Contribution Area 8 and
the Local Planning Strategy, Armadale Activity Centre Structure
Plan, Corporate Business Plan and Strategic Community Plan.
Where the provisions of Development Contribution Plan 8 are
inconsistent with the provisions of Part 5A of the Scheme, then the
provisions of Development Contribution Plan 8 in S the extent of any
inconsistency.
4.2 Definitions
Assessed Value means a land value obtained in accordance with the
procedures described in clauses 4.4.5 to 4.4.6 of Development
Contribution Plan 8.
Developable Area is defined as a total area of land minus land area
deductions as detailed in the Development Contribution Plan 8
Infrastructure Cost Schedule.
Development Contribution Plan Report means a report appurtenant
to the Scheme and Development Contribution Plan 8, and containing
information and instructions on the operation of Development
Contribution Plan 8, as periodically reviewed in accordance with
Development Contribution Plan 8.
Infrastructure Cost Schedule means a schedule appurtenant to the
Scheme and Development Contribution Plan 8, and containing the
estimated cost of Infrastructure and Administration of Development
Contribution Plan 8, contribution cost, land area deductions and land
area summary, as periodically reviewed in accordance with
Development Contribution Plan 8.
4.3 Infrastructure and Administrative Items to be funded
4.3.1 Infrastructure Item 1a—Movement Network and Urban
Plaza
Full cost to construct Cornish Street, including laneway
connection to Fifth Avenue, urban plaza and land acquisition
as detailed in the Development Contribution Plan Report and
Infrastructure Cost Schedule.
482 GOVERNMENT GAZETTE, WA 4 March 2022
4.3.2 Infrastructure Item 2a—Public Utilities
Contribution towards the Sewer Upgrade from Cornish
Street to Fifth Avenue as detailed in the Development
Contribution Plan Report and Infrastructure Cost Schedule.
4.3.3 Administration Costs—
Full costs associated with preparing and administering
Development Contribution Plan 8
4.4 Method for Calculating Contributions and Assessed Values
4.4.1 Approach
Contributions for infrastructure items will be calculated on a
Developable Area basis.
4.4.2 Cost Contribution Calculation
The contribution to be made by each Owner to the
implementation of the Infrastructure and Administration
Costs shall be a Cost Contribution, based on a per square
metre basis calculated by the Local Government as follows—
4.4.2.1 Infrastructure Items per Square Metre Rate
calculation
(a) Calculation for entire Development
Contribution Area Infrastructure Items per
Square Metre Rate (E) calculated as follows at
each review of the Infrastructure Cost
Schedule and to remain applicable from the
approval of one review to approval of the
next—
Cost of infrastructure items where the costs
are to be shared across the entire Development
Contribution Area 8 as detailed in the
Infrastructure Cost Schedule (A) + (plus)
Administrative Costs (B) minus contributions
collected (C) / (divide) total Developable Area
remaining (m2) for Development Contribution
Area 8 (D).
A + B—C / D = E
4.4.2.2 Cost Contribution Due
The Cost Contribution due by owners shall be based
on the Developable Area of an owners land parcel
and calculated as follows—
i. Cost Contribution due by owners that is
applicable to all Developable Area within
Development Contribution Area 8—
ii. Developable Area (m2) of an owners land
parcel x (multiply) Infrastructure items per
Square Metre Rate.
4.4.3 Valuations
The provisions of Clauses 5A.9.2 to 5A.9.6 of the scheme do
not apply to Development Contribution Plan 8. The following
variations apply to the acquisition of land for Infrastructure
Works, calculation of costs and valuation of land within
Development Contribution Area 8.
4.4.4 Compulsory Acquisition
Where land has been compulsorily acquired and a lawful
claim for compensation has been served on the Council, the
Council may claim compensation for betterment under
Section 184 of the Planning and Development Act 2005 and
the value attributed to the betterment of the land the subject
of the claim shall be set off against any compensation
otherwise payable to the claimant under the Land
Administration Act 1997 or any re-enactment of its
provisions related to compulsory acquisition and
compensation.
4.4.5 Assessed Value
(a) The Council may at any time ascertain the value of any
land in Development Contribution Plan 8 for the purpose
of estimating Infrastructure costs, payments and cost
contributions.
(b) If it is necessary, for any purpose to ascertain the value
of any land, such value should be determined by two
licensed valuers appointed from time to time by the local
4 March 2022 GOVERNMENT GAZETTE, WA 483
government herein referred to as “the Valuation Panel”.
The members of the Valuation Panel may confer as to
value, and if they are unable to arrive at a consensus
value, they shall confer with the Chief Executive Officer
of the local government (“CEO”) or the officer to whom
the CEO delegates that function from time to time. If the
valuers with the officer cannot arrive at a consensus
value then the officer shall select a value which
represents the median value between the two values
nominated by the valuers on the Valuation Panel and
will be advertised under the next following paragraph (c)
(“the Assessed Value”).
The Valuation Panel may determine more than one
Assessed Value in the Development Contribution Plan
area, where the local government or the Panel identifies
that there are significant differences in land values
within Development Contribution Area 8.
(c) As soon as possible after the Assessed Value or Assessed
Values have been ascertained it should be advertised for
a period of not less than 28 days to allow for submissions
to be made in regard to the proposed Assessed Value or
Assessed Values. Assessed Values may be advertised
concurrently as part of a Development Contribution Plan
8 review carried out in accordance with Clause 4.8.1 of
Development Contribution Plan 8.
An owner who lodges an objection under this clause shall
submit with the objection supporting evidence from a
suitably qualified person in the specific field being
objected to.
(d) The local government shall as soon as possible consider
all submissions made on an Assessed Value and may
refer any submission to the Valuation Panel for
comment, but where a submission is accompanied by
expert valuation advice based on the valuation principles
contained in Development Contribution Plan 8. It should
be referred by the local government to the Valuation
Panel for comment.
Having considered the submissions and any comment
from the Valuation Panel, the local government shall fix
upon the Assessed Value or Assessed Values to be
applied under Development Contribution Plan 8 and
Infrastructure Cost Schedule until the next Assessed
Value or Assessed Values has been determined.
(e) It is intended that any Assessed Value or Assessed
Values should apply for no more than 13 months but
while an Assessed Value remains current it shall stand
as the value of land within Development Contribution
Plan 8 and Infrastructure Cost Schedule for all purposes
under Development Contribution Plan 8 and Part 5A of
the scheme and the Infrastructure Cost Schedule.
(f) Where land is ceded or acquired for a Infrastructure
Work, otherwise than by compulsory taking, for the
purpose of determining the amount to be paid to the
owner from whom the land is acquired, the value of the
land shall be calculated according to the same Assessed
Value as was applied to the Cost Contribution paid or
payable by that owner on the clearance by the local
government of the subdivision of land in the same
deposited plan as contains the land acquired.
4.4.6 Valuation Principles
In ascertaining the Assessed Value or Assessed Values under
Development Contribution Plan 8, all land shall be valued in
its broad acre form as depicted on 1 January 2020 or other
date selected by the Local Government, ignoring any services
or infrastructure provided in-accordance with the provisions
of the relevant Local Structure Plan and applying the
following principles—
i. regard is to be had to the land classifications and zonings
existing at the date of valuation;
ii. the date of valuation is to be the date on which the local
government nominates;
484 GOVERNMENT GAZETTE, WA 4 March 2022
iii. ignoring any improvements or works on the land;
iv. the land should be valued without regard to the
Infrastructure work and the purpose for which the land
is acquired shall not be taken into consideration;
v. in selecting relevant sales evidence, regard should be had
first to values derived from land in the same area, and if
there is not adequate evidence, from nearby or similar
land in the area, in priority to any other sales evidence;
and
vi. the method of valuation shall otherwise be in accordance
with normal fair market valuation principles.
4.4.7 Variance and Solatium
(a) When calculating or reviewing Contribution Costs and
the Infrastructure Cost Schedule, the local government
will have regard to the value of the land required for
Infrastructure and include an amount of 10% over and
above the Assessed Value of such land, to ensure that the
local government has or will receive sufficient funds in
Development Contribution Plan 8 account to acquire
land for Infrastructure to meet its obligations for
appropriate payment to such owners, and ensure the
Infrastructure can be completed in a manner that
minimises the need for external borrowing. The local
government may also apply a further amount above the
Assessed Value to recognize any compulsory taking of
land, compensations and/or acquisition of structures.
(b) Where land is acquired in the circumstances
contemplated in subclause 4.4.5 (f) of Development
Contribution Plan 8, the Council shall pay to the owner
an additional amount not more than 10% of the amount
calculated under that Clause.
4.4.8 Acquisition Prior to Gazettal
Where land required for Infrastructure is ceded to the Crown
or acquired by the local government prior to the Minister
granting final approval and publication of the Development
Contribution Plan 8. Amendment in the Government Gazette,
the appointment of the Valuation Panel by the local
government under of Development Contribution Plan·8 or
adoption of the Infrastructure Cost Schedule by the Council.
the land shall be value in accordance with the clauses 4.4.3
to 4.4.7 of Development Contribution Plan 8 by the
Valusation Panel and the date of valuation shall be the date
land for the Infrastructure Work is acquired by the local
government or the local government issues its clearance to
the deposited plan that contains the Infrastructure land,
whichever is the earlier.
4.4.9 Provision of Land for Infrastructure Works
Where the Infrastructure Cost Schedule includes a land
component for a Infrastructure on the relevant lot for which
a Cost Contribution is due, an Owner shall cede to the Crown
or transfer to the local government the required
Infrastructure land at the first stage of subdivision and/or
development for that particular landholding or by prior
agreement at an alternative date agreed by the local
government. The value of the land will be determined in
accordance with Development Contribution Plan 8 and
Owners will be paid once the land is ceded to the Crown or
transferred to the local government and is already included
in Development Contribution Plan 8 and sufficient funds
have been collected in the Development Contribution Plan 8
account and / or having regard to the timing and priority of
infrastructure works.
4.5 Period of Operation
4.5.1
Development Contribution Plan 8 is proposed to operatefor a
period of l2 years from the date of gazettal of the town
planning scheme amendment that introduces Development
Contribution Plan 8 into the Scheme, by which time
development within Development Contribution Area is
expected to be largely complete. The proposed timeframe
4 March 2022 GOVERNMENT GAZETTE, WA 485
aims to account for uncertainty regarding the staging and
completion of development across the entire area.
The City may in the future consider extending the period of
operation , through an amendment to the Scheme, in the
event that growth does not occur as rapidly as expected, or if
new growth areas occur. The City may also terminate the
Development Contribution Plan 8 earlier, through an
amendment to the Scheme, if growth occurs quicker than
expected and all contributions have been settled.
All land within the Development Contribution Area is subject
to the requirements of the Development Contribution Plan 8
until the plan expires or revoked.
4.6 Excess in Contributions
4.6.1
Clause 5A.8.2 of the scheme does not apply to Development
Contribution Plan 8. If there is an excess in the total of Cost
Contributions when all Cost Contributions have been made
or accounted for in the Development Contribution Area, the
local government is to refund the excess funds to the
contributing owners or use all or some of the excess funds for
improvements to infrastructure included in Development
Contribution Plan 8 and subject to agreement from the
majority of the contributing Owners.
If, however, it is not reasonably practicable to identify
Owners and their entitled amount of refund and consult with
Owners, any excess in funds shall be applied to the provision
of additional improvements to Infrastructure included in
Development Contribution Plan 8.
The local government should make information publically
available regarding any spend of excess funds.
4.7 Timing and priority
4.7.1
The Local Government will use its best endeavours to provide
Infrastructure, including the acquistion of land for
infrastructure, as soon as possible taking into considering
the Local Government’s Corporate Business Plan, the rate of
development in Development Contribution Area 8 and funds
collected in Development Contribution Plan 8.
4.8 Review
4.8.1 Review
Development Contribution Plan 8 will be reviewed at least
every 5 years from the date of gazettal or when considered
appropriate having regard to the rate of development in the
area since the last review and the degree of development
potential still existing.
The estimated Infrastructure Costs, Assessed Values and
Infrastructure Cost Schedule will be reviewed and updated
at least annually. The Review will reflect changes in material
prices, design costs, design requirements, specifications,
labour requirements, Assessed Values and other expenditure
associated with Development Contribution Plan 8 and actual
and forecast future development patterns in the area. In
some instances the costs will be indexed based on the Local
Government Cost Index (LGCI) or another appropriate index
and they may be reviewed and certified by a suitably
qualified person. The local government’s priority and timing
for infrastructure will also be reviewed at least annually.
Reviews of Development Contribution Plan 8 or
Infrastructure Cost Schedule, including Assessed Values
shall be undertaken in accordance with the provisions
contained within the Development Contribution Plan 8
Report and applicable Local Government Local Planning
Policy. In the absence of an applicable Local Government
Local Planning Policy the provisions contained in the
Development Contributions Plan 8 Report shall solely apply.
R BUTTERFIELD, Mayor.
J ABBISS, Chief Executive Officer.
486 GOVERNMENT GAZETTE, WA 4 March 2022
PREMIER AND CABINET
PR401
INTERPRETATION ACT 1984
MINISTERIAL ACTING ARRANGEMENTS
It is hereby notified for public information that the Governor in accordance with section 12(c) of the
Interpretation Act 1984, has approved the following temporary appointment—
Hon R H Cook MLA to act temporarily in the office of Premier; Treasurer; Minister for Public Sector
Management; Federal-State Relations in the absence of the Hon M McGowan MLA for the period
4 March 2022.
E. ROPER, Director General, Department of the Premier and Cabinet.
TRANSPORT
TN401
ROAD TRAFFIC (AUTHORISATION TO DRIVE) REGULATIONS 2014
EXEMPTION FROM FEE FOR TAKING OR RESITTING THEORY TEST
(RTADR–2022–204977)
Pursuant to regulation 76(2) of the Road Traffic (Authorisation to Drive) Regulations 2014 (the
Regulations), I, Peter Woronzow, Chief Executive Officer of the Department of Transport, hereby
specify that the persons and bodies listed below are persons and bodies for the purpose of subregulation
(1) of that regulation.
Regulation 76 provides that a person is not required to pay the fee set out in Schedule 9 items 1 and 2
of the Regulations, to take or resit a theory test if the person or body administering the test is specified
in a notice published under subregulation (2).
Organisation Name Address
Marra Worra Worra Aboriginal Corporation
(ABN: 97272775547)
Lot 158 Great Northern Highway, Fitzroy
Crossing, WA 6765
Bloodwood Tree Association Inc
(ABN: 93975267470)
19 Hamilton Road, South Hedland, WA 6722
Fortescue Metals Group Ltd
(ABN: 57002594872)
Level 2, 87 Adelaide Terrace, East Perth, WA
6004
Mowanjum Aboriginal Corporation
(ABN: 38721336893)
1/Lot 85 Gibb River Road, Derby WA 6728
Ngarliyarndu Bindirri Aboriginal Corporation
(ABN: 67026946941)
46 Roe Street, Roebourne, WA 6718
Wunan Foundation
(ABN: 61577218799)
76 Coolibah Drive, Kununurra, WA 6743
This Notice revokes and replaces the notice identified as RTADR-2021-204455, published in the
Government Gazette on 1 June 2021.
Dated 25 February 2022.
PETER WORONZOW, Director General, Department of Transport.
4 March 2022 GOVERNMENT GAZETTE, WA 487
PUBLIC NOTICES
ZZ401
TRUSTEES ACT 1962
DECEASED ESTATES
Notice to Creditors and Claimants
James William Black late of Lot 3 Railway Road, Boyanup, Western Australia, deceased.
Creditors and other persons having claims (to which Section 63 of the Trustees Act 1962 relates) in
respect of the estate of the deceased, who died on 20 November 2018, are required by the Administrator,
Kathleen Shannon Black, care of P. A. Martino, PO Box 564, West Perth, WA, 6872 (Tel: (08) 9481
2777) to send particulars of their claim by Monday 4 April 2022, after which date the Administrator
may convey or distribute the assets, having regard only to the claims of which she then has notice.
———————————
ZZ402
TRUSTEES ACT 1962
DECEASED ESTATES
Notice to Creditors and Claimants
Derek Charles Bunn late of 394 Redmond-Hay River Road, Redmond, Western Australia, deceased.
Creditors and other persons having claims (to which Section 63 of the Trustees Act 1962 relates) in
respect of the estate of the deceased, who died on 14 November 2021, are required by the trustee of the
late Derek Charles Bunn of care of Philip Wyatt Lawyers, PO Box 1026, Albany, Western Australia
6331 to send particulars of their claims to them within one (1) month from the date of publication of
this notice, after which date the trustee may convey or distribute the assets, having regard only to the
claims of which it then has notice.
Dated this 28th day of February 2022.
PHILIP WYATT LAWYERS.
———————————
ZZ403
TRUSTEES ACT 1962
DECEASED ESTATES
Notice to Creditors and Claimants
Leslie Herman Wright, late of Unit 1/ 502 Bussell Highway, Broadwater 6280 in the State of Western
Australia, deceased.
Creditors and other persons having claims (to which Section 63 of the Trustees Act 1962 relates) in
respect of the estate of the deceased, who died on October 21 2021, in Sir Charles Gairdner Hospital,
Nedlands, Western Australia, are required by the trustee Ms Kirstine Forestier care of Sou’ West Legal
Services, of PO Box 1744, Busselton, Western Australia, to send particulars of their claims to her by
April 22nd 2022, after which date the trustee may convey or distribute the assets, having regard only
to the claims of which she then has notice.
———————————
ZZ404
TRUSTEES ACT 1962
DECEASED ESTATES
Notice to Creditors and Claimants
In the matter of the Estate of Sylvia Yvonne Vandenberg late of Unit 25 MyVista Village, 11 Nugent
Street, Balcatta in Western Australia, Control Operator, deceased.
Creditors and other persons having claims (to which Section 63 of the Trustees Act 1962 relates) in
respect of the estate of the deceased, who died on 21 December 2021, are required by the Executors of
care of Fort Knox Legal, P.O. Box 390, West Perth, WA 6872, to send the particulars of their claims to
Fort Knox Legal by one month from the publication of this notice after which date the Personal
Representatives may convey or distribute the assets, having regard only to the claims of which they
then have notice.
———————————
488 GOVERNMENT GAZETTE, WA 4 March 2022
ZZ405
TRUSTEES ACT 1962
DECEASED ESTATES
Notice to Creditors and Claimants
In the matter of the Estate of Freda Elizabeth Beardall, Widow, late of U19/301 Morrison Road, Swan
View, Western Australia 6056, deceased.
Creditors and other persons having claims (to which Section 63 of the Trustees Act 1962 relates) in
respect to the deceased who died August 18th 2021 are required by the Administrator Sharon Gamble
to forward details of their claim to ‘Administrator’, 510 McKnoe Drive Morangup WA 6083 within 1(one)
month of publication of this notice after which date the Administrator may convey or distribute the
assets having regard only to those claim of which they have notice.
———————————
ZZ406
TRUSTEES ACT 1962
DECEASED ESTATES
Notice to Creditors and Claimants
Alison Jane Eve Jackson (in the will Alison Jane Eve Jackson-Leist), late of 412/2 Tiger Way, Claremont
WA 6010, deceased.
Creditors and other persons having claims (to which Section 63 of the Trustees Act 1962 (WA) relates)
in respect of the estate of the deceased, who died on 25 May 2021, are required by the personal
representative, Judith Louise Joukador of care of Ilberys Lawyers, GPO Box B51, Perth WA 6838 to
send particulars of their claims to her by no later than 5 April 2022, after which date the personal
representative may convey or distribute the assets, having regard only to the claims of which she then
has notice.
———————————
ZZ407
TRUSTEES ACT 1962
DECEASED ESTATES
Notice to Creditors and Claimants
Hilda James (also commonly known as Terri James) late of Howard Solomon Aged Care Facility,
Hybanthus Road, Ferndale in the State of Western Australia, deceased.
Creditors and other persons having claims (to which Section 63 of the Trustees Act 1962 relates) in
respect of the Estate of the Deceased who died on 7 February 2020, are required by the Trustee,
Nicholas Mark James of 16 Bursaria Crescent, Ferndale in the State of Western Australia, to send
particulars of their claims to him within one (1) month of the date of this notice, after which date the
Trustee may convey or distribute the assets, having regard only to the claims which he then has notice.
———————————
ZZ408
TRUSTEES ACT 1962
DECEASED ESTATES
Notice to Creditors and Claimants
Dorothy Isabel Millar, late of Joseph Cooke House, 2 Houtmans Street, Shelley in the State of Western
Australia, deceased.
Creditors and other persons having claims (to which Section 63 of the Trustees Act 1962 relates) in
respect of the Estate of the Deceased who died on 2 November 2021, are required by the Trustee, David
Morgan Lewis of Lewis Kitson Lawyers, Level 1, 43 Kishorn Road, Applecross in the State of Western
Australia, to send particulars of their claims to him within one (1) month of the date of this notice, after
which date the Trustee may convey or distribute the assets, having regard only to the claims which he
then has notice.
———————————
4 March 2022 GOVERNMENT GAZETTE, WA 489
ZZ409
TRUSTEES ACT 1962
DECEASED ESTATES
Notice to Creditors and Claimants
Jane Blair Marshall Cattan, late of 31 Barnes Avenue, Australind, Western Australia, 6233, deceased.
Creditors and other persons having claims (to which Section 63 of the Trustees Act 1962 relates) in
respect of the estate of the deceased, who died 29th August 2021, are required by the Administrator
Vivian W McAvaney, of 40C Leeds Street, Dianella, Western Australia, 6059 to send particulars of their
claims by the date one month from the publication date after which date the administrator may convey
or distribute the assets having regard only to the claims of which she then has notice.
———————————
ZZ410
TRUSTEES ACT 1962
DECEASED ESTATES
Notice to Creditors and Claimants
Creditors and other persons having claims (to which Section 63 of the Trustees Act 1962 relates) in
respect of the Estates of the undermentioned deceased persons are required to send particulars of their
claims to me on or before 4 April 2022 after which date I may convey or distribute the assets, having
regard only to the claims of which I then have notice.
Blackley, Mary Jane, late of 17 Crestview Crescent, Kalamunda, who died on 15 August 2021
(DE19963136 EM38).
Brandis, Eruthia Mary, late of Hale House, Unit 103, 31 Waverley Road, Coolbellup, who died on
12 January 2022 (DE19991795 EM18).
Evans, Norma Caroline, late of Acacia Menora Gardens, 51 Alexander Drive, Menora, who died on
7 February 2022 (DE33031363 EM13).
Fitzpatrick, Nancy, late of Brightwater South Lake Aged Care, 62 Bloodwood Circle, South Lake, who
died on 1 October 2015 (PM19741136 EM214).
Goldsmith, Tracey Anne (also known as Tracey Anne Prout), late of Unit 1, 1 Mornington Boulevard,
Waikiki, who died on 4 October 2020 (DE19932255 EM18).
Johansen, Betty, late of 26 Grigg Place, Hilton, who died on 19 January 2022 (PM33162726 EM27).
Lynch, Peter, late of 16 Pola Street, Dianella, who died on 15 August 2021 (DE19611551 EM18).
Properjohn, Glenn Maxwell, formerly of 1/81 Thelma Street, Como, late of Agmaroy Nursing Home, 115
Leach Highway, Wilson, who died on 15 November 2021 (DE33149020 EM23).
Rasmussen, Else, formerly of 84 Eddystone Avenue, Craigie, late of MercyCare Joondalup, 21 Aldwych
Way, Joondalup, who died on 10 January 2022 (DE19954317 EM17).
Steenson, Laota Coralie, formerly of 55A Hillsborough Drive, Nollamara, late of Brightwater Redcliffe,
23 Johnson Road, Redcliffe, who died on 6 July 2021 (DE33035168 EM36).
Wilson, Barry Francis, late of Bethanie Peel Aged Care Home, 2 Maclaggan Turn, Coodanup, who died
on 8 January 2022 (DE19892239 EM18).
Young, Margaret, formerly of 1/15 Torbay Mews, Warnbro, late of Aegis Shoalwater, 72 Fourth Avenue,
Shoalwater, who died on 24 January 2022 (DE19851482 EM16).
BRIAN ROCHE, Public Trustee,
553 Hay Street, Perth WA 6000.
Telephone: 1300 746 212.