City of Wanneroo Fencing Local Law 2022
459 ISSN 2204-4264 (online) PERTH, FRIDAY, 4 MARCH 2022 No. 26 PUBLISHED BY AUTHORITY GEOFF O. LAWN, GOVERNMENT PRINTER © STATE OF WESTERN AUSTRALIA CONTENTS PART 1 Nil ——— PART 2 Page Consumer Protection ......................................................................................................................... 461 Environment ...................................................................................................................................... 462 Fire and Emergency Services ............................................................................................................ 463 Fisheries ............................................................................................................................................. 464 Justice ................................................................................................................................................ 468 Local Government .............................................................................................................................. 469 Minerals and Petroleum .................................................................................................................... 476 Planning ............................................................................................................................................. 479 Premier and Cabinet ......................................................................................................................... 486 Public Notices..................................................................................................................................... 487 Transport............................................................................................................................................ 486
IMPORTANT COPYRIGHT NOTICE © State of Western Australia This work is copyright. Apart from any use as permitted under the Copyright Act 1968, no part may be reproduced by any process without written permission from the Attorney General for Western Australia. Inquiries in the first instance should be directed to the Government Printer, Parliamentary Counsel’s Office, publications@pco.wa.gov.au. Note: A Creative Commons Attribution 4.0 International Licence (CC BY 4.0) applies with respect to material on the WA Legislation Website (with certain exceptions), and to copies of Acts, and reprints of Acts and subsidiary legislation, printed by the Government Printer. To view relevant information and for a link to a copy of the licence, visit www.legislation.wa.gov.au. PUBLISHING DETAILS The Western Australian Government Gazette is published by the Government Printer for the State of Western Australia on Tuesday and Friday of each week unless disrupted by Public Holidays or unforeseen circumstances. Special Government Gazettes containing notices of an urgent or particular nature are published periodically. The following guidelines should be followed to ensure publication in the Government Gazette— • Material submitted to the Executive Council prior to gazettal will require a copy of the signed Executive Council Minute Paper. • Copy must be lodged with the Publications Officer, Department of the Premier and Cabinet no later than 12 noon on Wednesday (Friday edition) or 12 noon on Friday (Tuesday edition)— Email address: gazette@dpc.wa.gov.au • Inquiries regarding publication of notices can be directed to the Publications Officer on (08) 6552 6012. • Lengthy or complicated notices should be forwarded early to allow for preparation. Failure to observe this request could result in the notice being held over. After lodging any notices, confirmation is not required by post. If original copy is forwarded later and published, the cost will be borne by the advertiser. ADVERTISING RATES AND PAYMENTS EFFECTIVE FROM 1 JULY 2021 (Prices include GST) Public Notices Section—$78.20 minimum charge (except items of an exceptionally large nature. In these instances arrangements will be made for pricing the notice at time of lodging). All other Notices— Per Column Centimetre—$15.60 Bulk Notices—$285.60 per page Clients who have an account will only be invoiced for charges over $100. For charges under $100, clients will need to supply credit card details at time of lodging notice (i.e. a notice under 7cm would not be invoiced). Clients without an account will need to supply credit card details at the time of lodging the notice.
4 March 2022 GOVERNMENT GAZETTE, WA 461 — PART 2 — CONSUMER PROTECTION CP401 RETAIL TRADING HOURS ACT 1987 RETAIL TRADING HOURS (PERTH METROPOLITAN AREA) Public Holiday Variation Order 2022 Made by the Minister for Commerce under section 12E of the Act.
- Citation This order is the Retail Trading Hours (Perth Metropolitan Area) Public Holiday Variation Order 2022.
- Commencement This order comes into operation as follows— (a) clauses 1 and 2—on the day on which this order is published in the Gazette; (b) the rest of the order—on the day after that day.
- Variation of retail trading hours General retail shops, other than motor vehicle shops, in the Perth metropolitan area, are authorised to be open at times when those shops would otherwise be required to be closed— (a) on each day specified in the Table; and (b) during the hours specified for that day in the Table. Table Day Hours Monday 7 March 2022 from 8:00am until 6:00pm Monday 18 April 2022 from 8:00am until 6:00pm
- Relationship to Retail Trading Hours (Public Holidays) Order 2012. This order has effect despite the Retail Trading Hours (Public Holidays) Order 2012. Hon. ROGER COOK, MLA, Minister for Commerce. ——————————— CP402 RETAIL TRADING HOURS ACT 1987 RETAIL TRADING HOURS (SHIRE OF COLLIE) Public Holiday Variation Order 2022 Made by the Minister for Commerce under section 12E of the Act.
- Citation This order is the Retail Trading Hours (Shire of Collie) Public Holiday Variation Order 2022.
- Commencement This order comes into operation as follows— (a) clauses 1 and 2—on the day on which this order is published in the Gazette; (b) the rest of the order—on the day after that day.
- Variation of retail trading hours General retail shops, other than motor vehicle shops, in the Collie local government district are authorised to be open at times when those shops would otherwise be required to be closed— (a) on each day specified in the Table; and (b) during the hours specified for that day in the Table.
462 GOVERNMENT GAZETTE, WA 4 March 2022 Table Day Hours Monday 7 March 2022 from 8.00am until 5.00pm Monday 18 April 2022 from 8.00am until 5.00pm Monday 6 June 2022 from 8.00am until 5.00pm Monday 26 September 2022 from 8.00am until 5.00pm 4. Relationship to standing order This order has effect despite the Retail Trading Hours (Shire of Collie) Variation Order 2016. Hon. ROGER COOK, MLA, Minister for Commerce. ——————————— CP403 RETAIL TRADING HOURS ACT 1987 RETAIL TRADING HOURS (CITY OF ALBANY) VARIATION ORDER 2022 Made by the Minister for Commerce under section 12E of the Act.
- Citation This order is the Retail Trading Hours (City of Albany) Variation Order 2022.
- Commencement This order comes into operation as follows— (a) clauses 1 and 2—on the day on which this order is published in the Gazette; (b) the rest of the order—on the day after that day.
- Variation of retail trading hours General retail shops, other than motor vehicle shops, in the Albany local government district are authorised to be open at times when those shops would otherwise be required to be closed- (a) on each day specified in the Table; and (b) during the hours specified for that day in the Table. Table Day Hours Sunday 24 April 2022 From 10.00am to 5.00pm Hon. ROGER COOK, MLA, Minister for Commerce. ENVIRONMENT EV401 ENVIRONMENTAL PROTECTION ACT 1986 Section 20 DELEGATION NO. 56 I, Michelle Andrews, Chief Executive Officer of the Department responsible for the administration of the Environmental Protection Act 1986 (“the Act”), acting pursuant to section 20 of the Act, hereby delegate all my powers and duties conferred or imposed by— a. Regulations 4, 5(1), 8, 9, 10, 14 and 19 of the Environmental Protection (Cost Recovery) Regulations 2021 to the holders for the time being of the office of the Executive Director, Environmental Protection Authority Services and Director, Environmental Protection Authority Services, both of the Department of Water and Environmental Regulation; and b. Regulations 11 and 12 of the Environmental Protection (Cost Recovery) Regulations 2021 to the holder for the time being of the office of the Executive Director, Compliance and Enforcement of the Department of Water and Environmental Regulation. Dated the 16th day of February 2022. MICHELLE ANDREWS, Chief Executive Officer, Department of Water and Environmental Regulation. Approved by— Hon. REECE WHITBY, MLA, Minister for Environment.
4 March 2022 GOVERNMENT GAZETTE, WA 463 FIRE AND EMERGENCY SERVICES FE401 EMERGENCY MANAGEMENT ACT 2005 EXTENSION OF STATE OF EMERGENCY DECLARATION I, Stephen Noel Dawson, the Minister for Emergency Services, hereby extend the state of emergency declaration made on 15 March 2020 at 12:45 pm. The state of emergency declaration is extended for a period of fourteen (14) days. The powers that may be exercised during the period by which the state of emergency declaration is extended are limited as follows: Nil limitations. Time when declaration made: 4:44 pm. Date on which declaration made: 23 February 2022. This declaration has effect from 12 am on 25 February 2022 and remains in force until— (a) 12 am on 11 March 2022; or (b) It is revoked under section 59 of the Emergency Management Act 2005. This declaration of an extension of a state of emergency declaration is made under section 58 of the Emergency Management Act 2005. STEPHEN NOEL DAWSON, Minister for Emergency Services. ——————————— FE402 BUSH FIRES ACT 1954 TOTAL FIRE BAN DECLARATION Correspondence No. D18023 Pursuant to powers delegated under the Bush Fires Act 1954, the Assistant Commissioner of the Department of Fire and Emergency Services, declared under Section 22A of the Bush Fires Act 1954, a total fire ban for 28 February 2022 for the local government districts of— Mount Marshall, Mukinbudin, Westonia, Yilgarn. Dated 27 February 2022. GARY GIFFORD, Assistant Commissioner of the Department of Fire and Emergency Services, as a sub-delegate of the Minister under section 16 of the Fire and Emergency Services Act 1998. ——————————— FE403 BUSH FIRES ACT 1954 TOTAL FIRE BAN DECLARATION Correspondence No. D18023 Pursuant to powers delegated under the Bush Fires Act 1954, the Assistant Commissioner of the Department of Fire and Emergency Services, declared under Section 22A of the Bush Fires Act 1954, a total fire ban for 2 March 2022 for the local government districts of— Exmouth. Dated 1 March 2022. GARY GIFFORD, Assistant Commissioner of the Department of Fire and Emergency Services, as a sub-delegate of the Minister under section 16 of the Fire and Emergency Services Act 1998.
464 GOVERNMENT GAZETTE, WA 4 March 2022 FISHERIES FI401 PEARLING ACT 1990 DECISION TO GRANT AN APPLICATION FOR THE ISSUE OF A PEARL OYSTER FARM LEASE A1823084 I, Nathan Harrison, Director Aquatic Resource Management, as delegate of the Chief Executive Officer (CEO) of the Department of Primary Industries and Regional Development, Western Australia, pursuant to Section 23(1) of the Pearling Act 1990 (“the Pearling Act”) have made the decision to grant an application submitted by Cygnet Bay Pearls Consolidated Pty Ltd to issue pearl oyster farm leases in respect of an area of water located at Cape Villaret B and Cape Villaret C. The coordinates of the Cape Villaret B lease are as follows— Boundary Corner Co-ordinates: Datum GDA94 Point Latitude Longitude A 18° 17. 600’ S 121° 57. 250’ E B 18° 17. 600’ S 121° 58. 250’ E C 18° 19. 500’ S 121° 56. 750’ E D 18° 19. 500’ S 121° 57. 750’ E The coordinates of the Cape Villaret C lease are as follows— Boundary Corner Co-ordinates: Datum GDA94 Point Latitude Longitude A 18° 11. 500’ S 121° 51. 800’ E B 18° 11. 500’ S 121° 52. 000’ E C 18° 11. 700’ S 121° 51. 800’ E D 18° 11. 700’ S 121° 52. 000’ E Under Section 33(1) of the Pearling Act a person aggrieved by my decision may apply to the State Administrative Tribunal (SAT) for a review of the decision. Application forms can be obtained from the SAT located at 5/565 Hay Street, Perth WA or from the SAT’s website www.sat.justice.wa.gov.au. The application together with any supporting documents should be lodged with the SAT within 28 days of publication of this Notice. When an application is accepted by the Chief Executive Officer of the SAT, the applicant is to give a copy of the application to the Chief Executive Officer, Department of Primary Industries and Regional Development, 1 Nash Street, Perth WA 6000. Dated this 24th day of February 2022. NATHAN HARRISON, Director Aquatic Resource Management. As delegate of the CEO. ——————————— FI402 PEARLING ACT 1990 DECISION TO GRANT AN APPLICATION FOR THE ISSUE OF A PEARL OYSTER FARM LEASE A1825310 I, Nathan Harrison, Director Aquatic Resource Management, as delegate of the Chief Executive Officer (CEO) of the Department of Primary Industries and Regional Development, Western Australia, pursuant to Section 23(1) of the Pearling Act 1990 (“the Pearling Act”) have made the decision to grant an application submitted by Maxima Pearling Company Pty Ltd to issue a pearl oyster farm lease in respect of an area of water located at Cape Villaret. The coordinates of the Cape Villaret A lease are as follows— Boundary Corner Co-ordinates: Datum GDA94 Point Latitude Longitude A 18° 13. 700’ S 121° 58. 000’ E B 18° 13. 700’ S 121° 59. 400’ E C 18° 15. 400’ S 121° 59. 400’ E D 18° 15. 400’ S 121° 58. 000’ E
4 March 2022 GOVERNMENT GAZETTE, WA 465 Under Section 33(1) of the Pearling Act a person aggrieved by my decision may apply to the State Administrative Tribunal (SAT) for a review of the decision. Application forms can be obtained from the SAT located at 5/565 Hay Street, Perth WA or from the SAT’s website www.sat.justice.wa.gov.au. The application together with any supporting documents should be lodged with the SAT within 28 days of publication of this Notice. When an application is accepted by the Chief Executive Officer of the SAT, the applicant is to give a copy of the application to the Chief Executive Officer, Department of Primary Industries and Regional Development, 1 Nash Street, Perth WA 6000. Dated this 25th day of February 2022. NATHAN HARRISON, Director Aquatic Resource Management. As delegate of the CEO. ——————————— FI403 FISH RESOURCES MANAGEMENT ACT 1994 SHARK BAY PRAWN MANAGED FISHERY MANAGEMENT PLAN 1993 Areas Closed to Fishing for Prawns in the Shark Bay Prawn Managed Fishery Notice No. 1 of 2022 I, Rick Fletcher, Executive Director Fisheries and Agriculture Resource Management of the Department of Primary Industries and Regional Development, Western Australia, in accordance with clause 10 of the Shark Bay Prawn Managed Fishery Management Plan 1993, consider it in the better interest of the Shark Bay Prawn Managed Fishery (Fishery) to hereby—
- Cancel Notice of Areas Closed to Fishing for Prawns in the Shark Bay Prawn Managed Fishery: Notice No. 3 of 2021 dated 29 June 2021.
- Permit the trialling of gear between 0800 and 1600 hours each day from 3 April 2022 to 24 April 2022 provided no fish are held on board, or landed from, the authorised boat and from 24 April 2022 to 1 October 2022 provided the cod-end is open, in the area described as the Gear Trial Area in the Schedule to this Notice.
- Except as provided for under Clause 2 of this Notice, prohibit fishing for prawns in those parts of the Fishery, between the times and dates provided for in items (a) to (i) below— (a) fishing for prawns is prohibited from the date of the gazettal of Notice No. 1 of 2022 to 0800 hours on 1 October 2022 in the area defined as the Withnell Point Closure in the Schedule to this Notice. (b) fishing for prawns is prohibited from the date of the gazettal of Notice No. 1 of 2022 to 1700 hours on 22 May 2022 and from 0800 hours on 11 June 2022 to 0800 hours on 1 October 2022 in the area defined as the North Carnarvon Peron Line Closure in the Schedule to this Notice. (c) fishing for prawns is prohibited from the date of the gazettal of Notice No. 1 of 2022 to 1700 hours on 22 May 2022 in the area defined as the West Carnarvon Peron Line Closure in the Schedule to this Notice. (d) fishing for prawns is prohibited from the date of the gazettal of Notice No. 1 of 2022 to 1700 hours on 24 June 2022 in the area defined as the Central Carnarvon Peron Line Closure in the Schedule to this Notice. (e) fishing for prawns is prohibited from 0800 hours on 11 June 2022 to 1700 hours on 20 August 2022 in the area defined as the Denham Sound Closure in the Schedule to this Notice. (f) fishing for prawns is prohibited from the date of the gazettal of Notice No. 1 of 2022 to 0800 hours on 11 June 2022 in the area defined as the Snapper/Trawl Closure in the Schedule to this Notice. (g) fishing for prawns is prohibited from 1700 hours on 20 August 2022 to 0800 hours on 1 October 2022 in the area defined as the Extended Snapper/Trawl Closure in the Schedule to this Notice. (h) in parts of the Fishery within the area defined as North of Koks Island in the Schedule to this Notice where fishing for prawns is not otherwise prohibited, fishing for prawns is prohibited between 1000 hours and 1700 hours each day between the date of the gazettal of Notice No. 1 of 2022 and 1 October 2022. (i) in parts of the Fishery within the area defined as South of Koks Island in the Schedule to this Notice where fishing for prawns is not otherwise prohibited, fishing for prawns is prohibited between 0800 hours and 1700 hours each day between the date of the gazettal of Notice No. 1 of 2022 and 1 October 2022.
- Except as provided for under Clause 2 of this Notice, fishing for prawns is prohibited in all parts of the Fishery outside of the fishing season which is from 1700 hours on 24 April 2022 to 0800 hours on 1 October 2022.
466 GOVERNMENT GAZETTE, WA 4 March 2022 Schedule 1 Gear Trial Area The part of the Fishery bounded by a line commencing at a point at 24° 50′ south latitude and 113° 21.50′ east longitude; then extending due south along the meridian to a point at 24° 52.75′ south latitude and 113° 21.50′ east longitude; then due east along the parallel to a point at 24° 52.75′ south latitude and 113° 23.50′ east longitude; then due north along the meridian a point at 24° 50′ south latitude and 113° 23.50′ east longitude; then due west along the parallel to the commencement point. Withnell Point Closure The part of the Fishery bounded by a line commencing at point at 25° 36′ south latitude and 113° 01.63′ east longitude (on Dirk Hartog Island); then extending due east along the parallel to a point at 25° 36′ south latitude and 113° 03.75′ east longitude; then due south along the meridian to a point at 25° 38′ south latitude and 113° 03.75′ east longitude; then due west along the parallel to a point at 25° 38′ south latitude and 113° 02.29′ east longitude (on Dirk Hartog Island); then generally northerly along the high water mark to the commencement point. South Carnarvon Peron Line Closure The part of the Fishery bounded by a line commencing at a point at 25° 26′ south latitude and 113° 45.24′ east longitude; then extending due west along the parallel to a point at 25° 26′ south latitude and 113° 40′ east longitude; then north-westerly along the geodesic to a point at 25° 20.40′ south latitude and 113° 30.60′ east longitude; then due north along the meridian to a point at 25° 15.20′ south latitude and 113° 30.60′ east longitude; then due east along the parallel to a point at 25° 15.20′ south latitude and 113° 40.706′ east longitude; then south-easterly along the geodesic to the commencement point. North of Koks Island The part of the Fishery north of 24° 45.30′ south latitude. South of Koks Island The part of the Fishery south of 24° 45.30′ south latitude. North Carnarvon Peron Line Closure The part of the Fishery bounded by a line commencing at a point at 24° 52.75′ south latitude and 113° 37.60′ east longitude (on Babbage Island); then extending due west along the parallel to a point at 24° 52.75′ south latitude and 113° 21′ east longitude; then due south along the meridian to a point at 24° 58.10′ south latitude and 113° 21′ east longitude; then southerly along the geodesic to a point at 25° 03′ south latitude and 113° 22.46′ east longitude; then due east along the parallel to a point at 25° 03′ south latitude and 113° 33.517′ east longitude; then northerly along the geodesic to a point at 24° 56.06′ south latitude and 113° 31.887′ east longitude; then due east along the parallel to a point at 24° 56.06′ south latitude and 113° 40.90′ east longitude (on the mainland); then generally north-westerly along the high water mark to the commencement point. North Carnarvon Peron Line Closure Extension The part of the Fishery bounded by a line commencing at a point at 24° 50′ south latitude and 113° 37.60′ east longitude (on the mainland); then extending due west along the parallel to a point at 24° 50′ south latitude and 113° 21′ east longitude; then due south along the meridian to a point at 24° 52.75′ south latitude and 113° 21′ east longitude; then due east along the parallel to a point at 24° 52.75′ south latitude and 113° 37.60′ east longitude (on Babbage Island); then generally northerly along the high water mark to the commencement point. Central Carnarvon Peron Line Closure The part of the Fishery bounded by a line commencing at a point at 25° 03′ south latitude and 113° 33.517′ east longitude; then extending due west along the parallel to a point at 25° 03′ south latitude and 113° 22.46′ east longitude; then south-easterly along the geodesic to a point at 25° 30.261 south latitude and 113° 30.60 east longitude (on the mainland at Cape Peron North); then due north along the meridian to a point at 25° 15.20 south latitude and 113° 30.60 east longitude; then due east along the parallel to a point at 25° 15.20 south latitude and 113° 40.706 east longitude; then north-westerly along geodesic to a point at 25° 12.727′ south latitude and 113° 39.668′ east longitude; then north- westerly along the geodesic to a point at 25° 10.008′ south latitude and 113° 37.238′ east longitude; then north-westerly along the geodesic to a point at 25° 04.801′ south latitude and 113° 33.94′ east longitude; then generally northerly to the commencement point. West Carnarvon Peron Line Closure The part of the Fishery bounded by a line commencing at a point at 25° 32 south latitude and 113° 29.74 east longitude (on the mainland at Peron Peninsula); then extending due west along the parallel to a point at 25° 32 south latitude and 113° 25 east longitude; then northerly along the geodesic to a point at 25° 03 south latitude and 113° 22.46 east longitude; then south-easterly along the geodesic to a point at 25° 30.261 south latitude and 113° 30.60 east longitude (on the mainland at Cape Peron North); then generally south-westerly along the high water mark to the commencement point.
4 March 2022 GOVERNMENT GAZETTE, WA 467 Denham Sound Closure The part of the Fishery south of a line commencing at a point at 25° 32 south latitude and 113° 29.74 east longitude (on the mainland at Peron Peninsula); then extending due west along the parallel to a point at 25° 32 south latitude and 113° 25 east longitude; then westerly along the geodesic to a point at 25° 31.25 south latitude and 113° 09.75 east longitude; then westerly along the geodesic to a point at 25° 30′ south latitude and 113° 01.40′ east longitude (on Dirk Hartog Island at Cape Levillain); and in that part of the Fishery east of a line commencing at a point at 26° 07.30′ south latitude and 113° 10.90′ east longitude (on Dirk Hartog Island at Surf Point); then south-westerly along the geodesic to a point at 26° 08.62′ south latitude and 113° 09.60′ east longitude (on the mainland at Steep Point). Snapper/Trawl Closure The part of the Fishery south of a line commencing at a point at 25° 40.59′ south latitude and 113° 02.87′ east longitude (on Dirk Hartog Island); then extending due east along the parallel to a point at 25° 40.59′ south latitude and 113° 04.80′ east longitude; then south-easterly along the geodesic to a point at 25° 41′ south latitude and 113° 05.63′ east longitude; then due east along the parallel to a point at 25° 41′ south latitude and 113° 08′ east longitude; then south-easterly along the geodesic to a point at 25° 46′ south latitude and 113° 13′ east longitude; then due east along the parallel to a point at 25° 46′ south latitude and 113° 19′ east longitude; then due north along the meridian to a point at 25° 38′ south latitude and 113° 19′ east longitude; then north-easterly along the geodesic to a point at 25° 32′ south latitude and 113° 25′ east longitude; then due east along the parallel to a point at 25° 32′ south latitude and 113° 29.74′ east longitude (on the mainland at Peron Peninsula); and in that part of the Fishery east of a line commencing at a point at 26° 07.30′ south latitude and 113° 10.90′ east longitude (on Dirk Hartog Island at Surf Point); then south-westerly along the geodesic to a point at 26° 08.62′ south latitude and 113° 09.60′ east longitude (on the mainland at Steep Point). Extended Snapper/Trawl Closure The part of the Fishery south of a line commencing at a point at 25° 40.59′ south latitude and 113° 02.87′ east longitude (on Dirk Hartog Island); then extending due east along the parallel to a point at 25° 40.59′ south latitude and 113° 04.80′ east longitude; then south-easterly along the geodesic to a point at 25° 41′ south latitude and 113° 05.63′ east longitude; then due east along the parallel to a point at 25° 41′ south latitude and 113° 08′ east longitude; then south-easterly along the geodesic to a point at 25° 42.40′ south latitude and 113° 09.40′ east longitude; then south along the meridian to a point at 25° 46.31′ south latitude and 113° 09.40′ east longitude; then south-easterly along the geodesic to a point at 25° 48.65′ south latitude and 113° 12.17′ east longitude; then due east along the parallel to a point at 25° 48.65′ south latitude and 113° 20.20′ east longitude; then due north along the meridian to a point at 25° 40′ south latitude and 113° 20.20′ east longitude; then due west along the parallel to a point at 25° 40′ south latitude and 113° 19′ east longitude; then north along the meridian to a point at 25° 38′ south latitude and 113° 19′ east longitude; then north-easterly along the geodesic to a point at 25° 32′ south latitude and 113° 25′ east longitude; then due east along the parallel to a point at 25° 32′ south latitude and 113° 29.74′ east longitude (on the mainland at Peron Peninsula). Dated 28th of February 2022. RICK FLETCHER, Executive Director, Fisheries and Agriculture Resource Management as delegate for Chief Executive Officer. ——————————— FI404 FISH RESOURCES MANAGEMENT ACT 1994 STATEMENT OF DETERMINATION Abalone Management Plan 1992 I, Heather Brayford, Deputy Director General Sustainability and Biosecurity as delegate for the Chief Executive Officer of the Department of Primary Industries and Regional Development Western Australia, pursuant to clause 11(3) of the Abalone Management Plan 1992, hereby make a determination in regard to the maximum quantity of abalone that may be taken from the relevant areas of the Abalone Managed Fishery during the licensing period commencing on 1 April 2022, as set out below— Area 1— 5,000 kilograms of Roe’s abalone (whole weight) 1,200 kilograms of Greenlip abalone (meat weight) 60 kilograms of Brownlip abalone (meat weight) Area 2— 16,200 kilograms of Roe’s abalone (whole weight) 6,000 kilograms of Greenlip abalone (meat weight) 1,500 kilograms of Brownlip abalone (meat weight) Area 3— 4,000 kilograms of Greenlip abalone (meat weight) 4,500 kilograms of Brownlip abalone (meat weight)
468 GOVERNMENT GAZETTE, WA 4 March 2022 Area 4— 0 kilograms of Greenlip abalone (meat weight) 0 kilograms of Brownlip abalone (meat weight) Area 5— 18,000 kilograms of Roe’s abalone (whole weight) Area 6— 7,500 kilograms of Roe’s abalone (whole weight) Area 7— 29,100 kilograms of Roe’s abalone (whole weight) Area 8— 0 kilograms of Roe’s abalone (whole weight) Dated this 24th day of February 2022. HEATHER BRAYFORD, Deputy Director General Sustainability and Biosecurity as delegate for the Chief Executive Officer. ——————————— FI405 FISH RESOURCES MANAGEMENT ACT 1994 ABALONE MANAGEMENT PLAN 1992 Closure Within the Fishery I, Heather Brayford, Deputy Director General Sustainability and Biosecurity as delegate for the Chief Executive Officer of the Department of Primary Industries and Regional Development Western Australia, and pursuant to clause 16(1) of the Abalone Management Plan 1992, am of the opinion that a prohibition on fishing is required in the better interests of the Fishery, and I prohibit fishing for Greenlip Abalone in the Augusta sub-area within Area 3 of the Fishery until 31 March 2023. Augusta sub-area— All waters bounded by a line commencing at a point at 33° 38.676′ south latitude and 115° 20.675′ east longitude (on the mainland near Busselton Jetty); then extending due north along the meridian to a point at 33° 29′ south latitude and 115° 20.675′ east longitude; then extending due east along the parallel to a point at 33° 29′ south latitude and 114° 30′ east longitude; then extending due south along the meridian to a point at 35° 00′ south latitude and 114° 30′ east longitude; then extending due west along the parallel to a point at 35° 00′ south latitude and 115° 24′ east longitude; then extending due north along the meridian to a point at 34° 20.048′ south latitude and 115° 24′ east longitude (on the mainland); then generally westerly, northerly and easterly along the high water mark to the commencement point. Dated this 24th day of February 2022. HEATHER BRAYFORD, Deputy Director General Sustainability and Biosecurity as delegate for the Chief Executive Officer. JUSTICE JU401 COURT SECURITY AND CUSTODIAL SERVICES ACT 1999 PERMIT DETAILS Pursuant to the provisions of section 56(1) of the Court Security and Custodial Services Act 1999, the Commissioner of Corrective Services has revoked the following Permits to do High-Level Security Work— Surname First Name(s) Permit Number Date Permit Revoked Shepherd Candice WLG-18020-1 21/02/2022 Hurley Andrew WLG-19029 21/02/2022 O’Neill Monique WLG-19058 21/02/2022 This notice is published under section 57(1) of the Court Security and Custodial Services Act 1999. TRACY MUIR, A/Director Strategic Business Development. ———————————
4 March 2022 GOVERNMENT GAZETTE, WA 469 JU402 JUSTICES OF THE PEACE ACT 2004 RESIGNATIONS It is hereby notified for public information that the Minister has accepted the resignation of— Patricia Ruth Floan of Oldbury Michael Thomas Howieson of Gwelup Joan Claire Jacobs of Hamilton Hill John Alexander MacMillan of Victoria Park Ian Charles Leslie McIntosh of Mosman Park from the Office of Justice of the Peace for the State of Western Australia. JOANNE STAMPALIA, Executive Director, Court and Tribunal Services. ——————————— JU403 JUSTICES OF THE PEACE ACT 2004 APPOINTMENTS It is hereby notified for public information that the Governor in Executive Council has approved of the following to the Office of Justice of the Peace for the State of Western Australia— Edward William Francis Clouter of Riverton Ian James Rawlings of Mount Lawley JOANNE STAMPALIA, Executive Director, Court and Tribunal Services. ——————————— JU404 COURT SECURITY AND CUSTODIAL SERVICES ACT 1999 PERMIT DETAILS Pursuant to the provisions of section 51(1) of the Court Security and Custodial Services Act 1999, the Commissioner of Corrective Services has issued the following Permits to do High-Level Security Work— Surname First Name(s) Permit Number Permit Issue Date Waycott Kevin Sidney BRS-200004 23/02/2022 Nangle Mark Stephen BRS-210084 23/02/2022 Platt Nikkita Simone BRS-210070 23/02/2022 Italiano Daniel BRS-210063 23/02/2022 This notice is published under section 57(1) of the Court Security and Custodial Services Act 1999. SUE HOLT, Assistant Director, Prisoner Transport and Custodial Services Contract Management. LOCAL GOVERNMENT LG401 LOCAL GOVERNMENT ACT 1995 Shire of Augusta Margaret River BASIS OF RATES I, Tim Fraser, being delegated by the Minister of the Crown to whom the administration of the Local Government Act 1995 is committed by the Governor, and acting pursuant to section 6.28 (1) of that Act, hereby, and with effect from 22 February 2022, determined that the method of valuation to be used by the Shire of Augusta Margaret River as the basis for a rate in respect of the land referred to in the Schedule is to be the gross rental value of the land; Schedule Designated Land UV to GRV All those portions of land being Lot 102, Lot 235 and Lots 237 to 261 inclusive as shown on Deposited Plan 421379. TIM FRASER, Executive Director Local Government, Department of Local Government, Sport and Cultural Industries. ———————————
470 GOVERNMENT GAZETTE, WA 4 March 2022 LG402 LOCAL GOVERNMENT ACT 1995 CITY OF WANNEROO FENCING LOCAL LAW 2021 Under the powers conferred by the Local Government Act 1995 and under all other enabling powers, the Council of the City of Wanneroo resolved on 15 February 2022 to make the following local law. PRELIMINARY 1.1 Citation and application This local law may be cited as the City of Wanneroo Fencing Local Law and shall apply throughout the district. 1.2 Commencement This local law will come into operation 14 days after the date of its publication in the Government Gazette. 1.3 Repeal and transitional provisions The City of Wanneroo Fencing Local Law 2016, published in the Government Gazette, Number 137 dated 28 July 2016, is repealed. A permit or other authorisation under a repealed local law that is in force before the commencement day is to be regarded on and after that day as a permit under this local law and may be dealt with accordingly. 1.4 Definitions and interpretation In this local law unless the context requires otherwise— Act means the Local Government Act 1995; AS/NZS means an Australian or Australian/New Zealand Standard (as applicable) published by Standards Australia, as amended from time to time; authorised person means a person authorised by the local government under section 9.10 of the Act to carry out any of the functions of an authorised person under this local law; Building Code has the meaning given to it in regulation 3 of the Building Regulations 2012; building permit has the meaning given to it in the Building Act 2011; commercial lot means a lot zoned commercial, mixed use or business or an equivalent commercial zone under the local planning scheme and/or structure plan, but does not include a lot occupied by a residential building; dangerous, in relation to any fence, means— (a) an electrified fence, or one containing barbed or razor wire, other than a fence that is constructed and maintained in accordance with this local law; (b) a fence containing exposed broken glass, asbestos fibre or any other potentially harmful projection or material; or (c) a fence which is likely to collapse or fall, or part of which is likely to collapse or fall, from any cause; district means the district of the City of Wanneroo and includes any area placed under the jurisdiction of the City pursuant to any Act or Regulation; dividing fence has the meaning given to it in the Dividing Fences Act 1961 (as amended from time to time); electrified fence means a fence carrying or designed to carry an electric charge; fence means any structure, not including a retaining wall, that is used or functions as a barrier, irrespective of where it is located, and includes any gate; front boundary means the boundary that separates a thoroughfare and the front of a lot; front fence means a fence in the front setback area of a lot; front setback means the horizontal distance between the front boundary and a wall of a building, measured at a right angle to the front boundary; height, in relation to a fence, means the vertical distance between— (a) the top of the fence at any point; and (b) the ground level or, where the ground levels on each side of the fence are not the same, the higher ground level immediately below that point; industrial lot means a lot situated within a general industrial or service industrial zone or an equivalent industrial zone under the local planning scheme and/or structure plan; land means land in the district and includes a house, building, work or structure, in or on the land; local government means the City of Wanneroo;
4 March 2022 GOVERNMENT GAZETTE, WA 471 local planning scheme means a local planning scheme made by the local government under the Planning and Development Act 2005; lot has the meaning given to it in the Planning and Development Act 2005; occupier where used in relation to land means the person by whom or on whose behalf the land is actually occupied or, if there is no occupier, the person entitled to possession of the land; open fence means a fence— (a) that has continuous vertical or horizontal gaps of 50 mm or greater width comprising not less than one third of the total surface area; or (b) that has continuous vertical or horizontal gaps less than 50 mm in width, comprising at least one half of the total surface area in aggregate; or (c) that has a surface offering equal or lesser obstruction to view; and (d) the lower portion of which may be closed up to a height of 1.2 m above the natural ground level measured from the primary street side of the fence; owner, for the purposes of the definition of ‘dividing fence’, has the meaning given to it in the Dividing Fences Act 1961; owner, for all other purposes, has the meaning given to it in the Act; penalty unit has the meaning given to it in the City of Wanneroo Penalty Units Local Law 2015; person means any natural person, company, public body, association or body of persons, corporate or unincorporated and includes an owner, occupier, licensee and permit holder (as applicable), but does not include the local government; public place means a place to which the public has access; reserve means land (including a parkland or foreshore) in or adjoining the district that is— (a) set apart for the use and enjoyment of the public; or (b) acquired for public purposes and vested in or under the care, control and management of the local government; residential lot means any lot— (a) situated within a residential, special residential or smart growth community zone as classified by the local planning scheme and/or structure plan; or (b) which is or will be predominantly used for residential purposes; but does not include a rural lot; retaining wall means any structure which prevents the movement of soil in order to allow ground levels of different elevations to exist adjacent to one another; rural lot means any lot situated within a general rural, special rural, rural resource, rural community, landscape enhancement or an equivalent rural zone as classified by the local planning scheme; structure plan has the meaning given to it in the local planning scheme; sufficient fence means a fence described in section 2.2; thoroughfare has the meaning given to it in the Act, but does not include a private thoroughfare which is not under the management or control of the local government; and uniform fence means a fence erected by a developer or subdivider in accordance with a subdivision approval which divides a residential lot from a public place such as a pedestrian access way, public open space or road reserve. Any other expression used in this local law and not defined herein shall have the meaning given to it in the Act or the Dividing Fences Act 1961 (as applicable). 1.5 Relationship with other laws In the event of any inconsistency between the provisions of a local planning scheme and the provisions of this local law, the provisions of the local planning scheme will prevail. Except as described below, nothing in this local law affects the need for compliance, in respect of a fence, with any relevant provisions— (a) of a local planning scheme; and (b) that apply if a building permit is required for a fence under the Building Act 2011 or Building Regulations 2012. A dividing fence constructed and maintained as a sufficient fence under this local law does not require a building permit.
472 GOVERNMENT GAZETTE, WA 4 March 2022 FENCING GENERAL 2.1 Dividing fences Unless by agreement between the owners of adjoining lots, a person must— (a) not construct or alter a dividing fence on a lot so that it does not satisfy the requirements for a sufficient fence as set out in this local law; (b) not attach anything to a dividing fence; (c) maintain a dividing fence in a condition which satisfies the requirements of a sufficient fence; or (d) not alter the level of the ground adjoining the boundary so as to change the height of a dividing fence unless the dividing fence is altered, reconstructed or relocated so as to satisfy the requirements of a sufficient fence. An agreement in respect of a dangerous fence is taken not to be an agreement between owners of adjoining lots for the purposes of section 2.1(1) of this local law. Without limiting section 1.5, an agreement between the owners of adjoining lots does not negate the need to obtain approval under any other written law. 2.2 Sufficient fence Subject to subsections (2) and (3), a sufficient fence— (a) on a residential lot is a dividing fence constructed and maintained in accordance with the requirements of Schedule 1. (b) on a commercial lot or an industrial lot is a dividing fence constructed and maintained in accordance with the requirements of Schedule 2; and (c) on a rural lot is a dividing fence constructed and maintained in accordance with the requirements of Schedule 3. Where a fence is constructed on or near the boundary between a residential lot and any of the following— (a) an industrial lot; (b) a commercial lot; or (c) a rural lot, a sufficient fence is a dividing fence constructed and maintained in accordance with the requirements of Schedule 1. Where— (a) the zoning of a lot is changed from ‘Rural’ to ‘Residential’ under a local planning scheme; and (b) immediately before that zoning change a dividing fence on that lot is a sufficient fence, the requirements of Schedule 1 will not apply to that dividing fence until a residential use becomes the predominant use for that lot. A dividing fence or any fence lawfully erected prior to this local law coming into operation constitutes a sufficient fence. 2.3 Fencing within the front setback area On a residential lot, a front fence shall be constructed of face finished brick, concrete, stone or timber palings, or a combination of the aforementioned materials or similar (but excluding fibre cement sheeting or sheet metal), that complement the dwelling and do not detract from the streetscape. On an industrial lot, a fence erected within the front setback area shall be constructed and maintained as an open fence and not exceed a height of 2.4m. On a rural lot, a front fence shall be— (a) not greater than 1.2m in height; or (b) if greater than 1.2m in height, constructed and maintained as an open fence and must not exceed 1.8m in height. 2.4 Sightlines at vehicle access point A fence adjacent to any vehicle access point, or where two streets intersect, must be truncated with the minimum dimension of the truncation being 1.5m or the fence reduced in height to no more than 0.75m. 2.5 Maintenance of fences This section applies to a fence that is— (a) a front fence; or (b) a fence that separates a lot and a thoroughfare. An owner or occupier of a lot on which a fence is constructed must maintain the fence in good condition so as to prevent it from becoming dangerous, dilapidated, unsightly, or prejudicial to the amenity of the locality.
4 March 2022 GOVERNMENT GAZETTE, WA 473 An owner or occupier of a lot adjacent to a uniform fence must, where that fence is damaged, dilapidated or in need of repair, ensure that— (a) it is repaired or replaced with the same or similar materials with which it was first constructed; and (b) so as far as practicable the repaired or replaced section is the same, including of same height, as the original fence. 2.6 Prohibited fencing materials In constructing or maintaining a fence a person must not use— (a) except where specifically allowed by this local law, broken glass or any other potentially harmful projection or material; (b) asbestos fibre; (c) any material that is likely to collapse or fall, or part of which is likely to collapse or fall, from any cause; or (d) pre-used materials, unless they are painted or treated to the satisfaction of the local government. 2.7 Gates in fences A person must not construct or maintain on a lot a gate in a fence, unless the gate opens— (a) into the subject lot; or (b) by sliding parallel on the inside of the fence, which it forms part of, when closed. BARBED AND RAZOR WIRE FENCES 3.1 Barbed and razor wire fences On a residential lot or any other lot abutting such a lot, a person shall not erect or affix to any fence any barbed wire, razor wire or other material with spiked or jagged projections. On an industrial lot or a commercial lot, a person shall not erect or affix to any fence bounding that lot any barbed wire, razor wire or other materials with spiked or jagged projections unless the wire or materials are not less than 2.0m from ground level. If the posts which carry the barbed wire, razor wire or other materials referred to in subsection (2) are angled towards the outside of the lot bounded by the fence, the face of the fence must be set back from the lot boundary a sufficient distance to ensure that the angled posts, barbed wire or other material do not encroach on adjoining land. On a rural lot, a person shall not place or affix barbed wire upon a fence on that lot where the fence is adjacent to a thoroughfare or other public place unless the barbed wire is fixed to the side of the fence posts furthest from the thoroughfare or other public place. ELECTRIFIED FENCES 4.1 Electrified fences On a residential lot or commercial lot or any other lot abutting such a lot, a person shall not erect or affix an electrified fence. On a rural lot or industrial lot, an electrified fence shall— (a) comply with any applicable AS/NZS; (b) comply with any requirements of Western Power; and (c) be inoperable during the hours of business, if any. ENFORCEMENT 5.1 Offences and general penalty A person who fails to do anything required or directed to be done under this local law, or who does anything which under this local law that person is prohibited from doing, commits an offence. A person who commits an offence under this local law is liable, on conviction, to a penalty not less than $500 and not exceeding $5,000 and, if the offence is of a continuing nature, to an additional daily penalty not exceeding $500 for each day or part of a day during which the offence has continued. 5.2 Prescribed offences An offence against a section of this local law specified in Schedule 4 is a prescribed offence for the purposes of section 9.16 of the Act. The number of modified penalty units for a prescribed offence is that specified in the fourth column of Schedule 4. If this local law expresses a modified penalty as a number of penalty units, the monetary value of the modified penalty is the number of dollars obtained by multiplying the value of the penalty unit by the number of penalty units. 5.3 Form of infringement notices For the purposes of this local law—
474 GOVERNMENT GAZETTE, WA 4 March 2022 the form of the infringement notice referred to in section 9.16 of the Act is Form 2 in Schedule 1 of the Local Government (Functions and General) Regulations 1996; and the form of the infringement withdrawal notice referred to in section 9.20 of the Act is Form 3 in Schedule 1 of the Local Government (Functions and General) Regulations 1996. ———— Schedule 1 (section 2.2(1)(a)) A SUFFICIENT FENCE ON A RESIDENTIAL LOT BEHIND THE FRONT SETBACK
- This Schedule does not apply to a uniform fence or a front fence.
- Refer to section 2.3 of this local law for fences within the front setback area.
- On a residential lot, a sufficient fence is a dividing fence that— (a) is constructed of— (i) corrugated fibre-reinforced pressed cement sheeting; (ii) timber palings; (iii) masonry (including brick, stone or concrete); (iv) factory coloured sheet metal post and panelled fence; (v) PVC panel (eg. Duralock); or (vi) any combination of the materials described in paragraphs (i)-(v); and (b) is between 1.75m and 1.85m in height; and (c) where constructed of masonry, is in accordance with AS/NZS for masonry construction that has been adopted by the Building Code at the time of construction. ———— Schedule 2 (section 2.2(1)(b)) A SUFFICIENT FENCE ON A COMMERCIAL LOT OR INDUSTRIAL LOT
- This Schedule does not apply to a uniform fence or a front fence.
- Refer to section 2.3 of this local law for fences within the front setback area.
- On a commercial lot or industrial lot, a sufficient fence is a dividing fence that— (a) is constructed of— (i) link mesh, chain mesh or steel mesh and is no higher than 2.0m, unless it is topped with up to three strands of barbed wire to a total height of no more than 2.4m;. (ii) fibre reinforced cement sheets; (iii) painted or galvanized steel or aluminium sheeting; or (iv) timber or masonry (including brick, stone or concrete); and (b) is no more than 2.4m in height; and (c) where constructed of masonry, is in accordance with AS/NZS for masonry construction that has been adopted by the Building Code at the time of construction. ———— Schedule 3 (section 2.2(1)(c)) A SUFFICIENT FENCE ON A RURAL LOT
- This Schedule does not apply to a uniform fence or a front fence.
- On a rural lot, a sufficient fence is a dividing fence that— (a) is at least 1.2m in height; and (b) is constructed of posts and wire. ————
4 March 2022 GOVERNMENT GAZETTE, WA 475 Schedule 4 (section 5.2) PRESCRIBED OFFENCES AND MODIFIED PENALTIES Item No Clause No Nature of Offence Penalty Unit Part 2—Fencing—general 1 2.1(1)(a) Constructing or altering a dividing fence which is not a sufficient fence 25 2 2.1(1)(b) Attaching anything to a dividing fence 25 3 2.1(1)(c) Failing to maintain a fence in a condition to satisfy requirements of a sufficient fence 25 4 2.1(1)(d) Altering ground level of a fence without satisfying the requirements of a sufficient fence 25 5 2.3(1) Constructing a front fence of a material that does not complement the dwelling or detracts from the streetscape 25 6 2.3(2) Constructing a fence on an industrial lot that is not an open fence or is in excess of 2.4m 25 7 2.3(3) Constructing a fence on a rural lot that is greater than 1.2m in height or, if greater than 1.2m in height, that is not an open fence or is in excess of 1.8m 25 8 2.4 Constructing a fence adjacent to a vehicle access point without a truncation 25 9 2.5(2) Failure to maintain a fence in good condition to prevent fence becoming dangerous, dilapidated, unsightly 25 10 2.6 Using a prohibited material in the construction or maintenance of a fence 25 11 2.7 Constructing or maintaining a gate in a fence not opening into the lot or by sliding parallel and on the inside of the fence 25 Part 3—Barbed and razor wire fences 12 3.1(1) Using barbed or razor wire, spiked or jagged projections in a fence on a residential lot, special residential lot or any other lot abutting such a lot. 25 13 3.1(2) Having and using a barbed or razor wire fence on a commercial or industrial lot at a height lower than 2m 25 14 3.1(3) Constructing a fence with barbed wire that encroaches into adjoining land 25 15 3.1(4) Placing or affixing barbed wire on the side of a fence on a rural lot that faces a thoroughfare or other public place 25 Part 4—Electrified fences 16 4.1 Having and using an electrified fence on a residential lot, commercial lot or any other lot abutting such a lot 25 17 4.1(2)(a) Having and using an electric fence on a rural lot or industrial lot that is non-compliant with any applicable AS/NZS 25 18 4.1(2)(b) Having or using an electric fence on a rural lot or industrial lot that does not comply with the requirements of Western Power 25 19 4.1(2)(c) Operating an electric fence on a rural lot or industrial lot during business hours 25 20 5.1 Other offences not specified 25 ———— Dated 22 February 2022. The Common Seal of the City of Wanneroo was affixed by authority of a resolution of the Council in the presence of— TRACEY GARDNER ROBERTS, Mayor. DANIEL JOHN SIMMS, Chief Executive Officer. ———————————
476 GOVERNMENT GAZETTE, WA 4 March 2022 LG403 CITY OF KALGOORLIE-BOULDER APPOINTMENTS The City of Kalgoorlie-Boulder wishes to advise for public information the appointment of Susie Beamish and Christie Butterworth as authorised officers to operate within the City of Kalgoorlie- Boulder to enforce the following Acts, Regulations and Local Laws effective immediately– • Local Government Act 1995 • Local Government (Miscellaneous Provisions) Act 1960 • Dog Act 1976 and Regulations • Cat Act 2011 and Regulations • Litter Act 1979 and Regulations • Bush Fires Act 1954 and Regulations— (Bush Fire Control Officer) • Bush Fires (Infringements) Regulations 1978 • Control of Vehicles (Off-road Areas) Act 1978 and Regulations • Caravan Parks and Camping Grounds Act 1995 and Regulations 1997 • City of Kalgoorlie-Boulder Local Laws In addition, Kodi Sticklen, Peter Curran and Tim Hanson have been appointed as authorised officers to operate within the City of Kalgoorlie-Boulder to enforce the following Acts, Regulations and Local Laws effective immediately– • Local Government Act 1995 • Local Government (Miscellaneous Provisions) Act 1960 • Litter Act 1979 and Regulations • City of Kalgoorlie-Boulder Local Laws ALEX WIESE, Acting Chief Executive Officer. MINERALS AND PETROLEUM MP401 MINING ACT 1978 APPLICATION FOR AN ORDER FOR FORFEITURE Department of Mines, Industry Regulation and Safety, Meekatharra WA 6642. In accordance with Regulation 49(2)(c) of the Mining Regulations 1981, notice is hereby given that the following licences are liable to forfeiture under the provision of Section 96(1)(a) of the Mining Act 1978 for breach of covenant, being failure to comply with the prescribed expenditure conditions and/or non- compliance with the reporting provisions. WARDEN WHITE. ———— To be heard by the Warden at Meekatharra on 20 April 2022. PEAK HILL MINERAL FIELD Prospecting Licences P 52/1610 Morning Star Mining Pty Ltd ———————————
4 March 2022 GOVERNMENT GAZETTE, WA 477 MP402 MINING ACT 1978 APPLICATION FOR AN ORDER FOR FORFEITURE Department of Mines, Industry Regulation and Safety, Marble Bar WA 6760. In accordance with Regulation 49(2)(c) of the Mining Regulations 1981, notice is hereby given that the following licences are liable to forfeiture under the provision of Section 96(1)(a) of the Mining Act 1978 for breach of covenant, being failure to comply with the prescribed expenditure conditions and/or non- compliance with the reporting provisions. WARDEN MacLEAN. ———— To be heard by the Warden at Marble Bar on 21 April 2022. PILBARA MINERAL FIELD Prospecting Licences P 45/3100-S West, Robert Brettner, Keelan Wally, Bevon Dann, Robert P 46/1939 Young, John William P 46/1954 Parsonage, Darrol Terence ——————————— MP403 MINING ACT 1978 APPLICATION FOR AN ORDER FOR FORFEITURE Department of Mines, Industry Regulation and Safety, Mt. Magnet WA 6638. In accordance with Regulation 49(2)(c) of the Mining Regulations 1981, notice is hereby given that the following licences are liable to forfeiture under the provision of Section 96(1)(a) of the Mining Act 1978 for breach of covenant, being failure to comply with the prescribed expenditure conditions and/or non- compliance with the reporting provisions. WARDEN WHITE. ———— To be heard by the Warden at Mt. Magnet on 21 April 2022. MURCHISON MINERAL FIELD Prospecting Licences P 20/2230 Rise Success International Development Pty Ltd P 58/1863 Goodrick, Scott Anthony YALGOO MINERAL FIELD Prospecting Licences P 59/2220-S Noble, James Ian P 59/2238-S Blair, Steven Glenn P 59/2240 D’Agostino, Carmello Tony ———————————
478 GOVERNMENT GAZETTE, WA 4 March 2022 MP404 MINING ACT 1978 APPLICATION FOR AN ORDER FOR FORFEITURE Department of Mines, Industry Regulation and Safety, Marble Bar WA 6760. In accordance with Regulation 49(2)(c) of the Mining Regulations 1981, notice is hereby given that the following licences are liable to forfeiture under the provision of Section 96(1)(a) of the Mining Act 1978 for breach of covenant, being failure to comply with the prescribed expenditure conditions and/or non- compliance with the reporting provisions. WARDEN MacLEAN. ———— To be heard by the Warden at Marble Bar on 21 April 2022. PILBARA MINERAL FIELD Prospecting Licences P 45/2897 Hanson Construction Materials Pty Ltd ——————————— MP405 MINING ACT 1978 INSTRUMENT OF VARIATION OF EXEMPTION OF LAND I, Kristian Hartley Dawson, Executive Director, Resource Tenure, pursuant to section 19 of the Mining Act 1978 hereby vary the exemption originally declared on 23 May 1989 and published in the Government Gazette dated 16 June 1989 by varying the description to that as described hereunder (not being private land or land that is the subject of a mining tenement or an application for a mining tenement) from Divisions 1 to 5 of Part IV of the Mining Act 1978. Locality Carnarvon Description of Land Land designated S19/83 in the TENGRAPH electronic plan of the Department of Mines, Industry Regulation and Safety. A geospatial description is filed in the Department of Mines, Industry Regulation and Safety electronic file number A2671/201901, document ID 8991215. Area of Land 776.96 hectares Dated at Perth this 28th day of February 2022. KRISTIAN HARTLEY DAWSON, Executive Director, Resource Tenure. ——————————— MP406 MINING ACT 1978 INSTRUMENT OF VARIATION OF EXEMPTION OF LAND I, Kristian Hartley Dawson, Executive Director, Resource Tenure, pursuant to section 19 of the Mining Act 1978 hereby vary the exemption originally declared on 4 September 2019 and published in the Government Gazette dated 20 September 2019 by varying the description to that as described hereunder (not being private land or land that is the subject of a mining tenement or an application for a mining tenement) from Divisions 1 to 5 of Part IV of the Mining Act 1978. Locality Kennedy Range National Park Description of Land Land designated S19/385 in the TENGRAPH electronic plan of the Department of Mines, Industry Regulation and Safety. A geospatial description is filed in the Department of Mines, Industry Regulation and Safety electronic file number A1185/201901, document ID 8995163. Area of Land 505,998.81 hectares Dated at Perth this 18th day of February 2022. KRISTIAN HARTLEY DAWSON, Executive Director, Resource Tenure.
4 March 2022 GOVERNMENT GAZETTE, WA 479 PLANNING PL401 PLANNING AND DEVELOPMENT ACT 2005 APPROVED LOCAL PLANNING SCHEME AMENDMENT City of Swan Local Planning Scheme No. 17—Amendment No. 182 Ref: TPS/2557 It is hereby notified for public information, in accordance with section 87 of the Planning and Development Act 2005 that the Minister for Planning approved the City of Swan Local Planning Scheme amendment on 10 February 2022 for the purpose of— (a) Insert the following exempted development into Schedule 5 of the scheme text and locate this new entry between the existing ‘Shade Structure’ and ‘Swimming Pool/Spa’ entries— Exempted Development Applicable Zones/Reserves Conditions applying to the exempted development Solar Collectors incidential to buildings All zones Where the development meets all of the following criteria— • is installed on the roof or other part of buildings; • a maximum projection no greater than 1.5 metres from the highest point of the building to which it is attached to; • is incidental to an approved land use; • satisfies the deemed-to-comply requirements of the R-Codes, if the R-Codes apply to the development; • is not located in a place— • entered in the Register of Heritage Places under the Heritage Act 2018; • the subject of an order under the Heritage Act 2018; • the subject of a heritage agreement entered into under the Heritage Act 2018; • is not located within a Heritage Area designated by this Scheme and is not on a lot that contains a place on the Heritage List prepared in accordance with this Scheme, Or; Where the development is located within a Heritage Area designated by this Scheme or a lot that contains a place on the Heritage Lost prepared in accordance with this Scheme and meets all of the following criteria— • is installed flush-mounted on the roof or other part of buildings that does not face any adjoining street or public land; • satisfies the deemed-to-compl requirements of the R-Codes, if the R-Codes apply to the development; • is not located in a place— • entered in the Register of Heritage Places under the Heritage Act 2018; • the subject of an order under the Heritage Act 2018, and; • the subject of a heritage agreement entered into under the Heritage Act 2018. D LUCAS, Mayor. M J FOLEY, Chief Executive Officer. ———————————
480 GOVERNMENT GAZETTE, WA 4 March 2022 PL402 PLANNING AND DEVELOPMENT ACT 2005 APPROVED LOCAL PLANNING SCHEME AMENDMENT City of Swan Local Planning Scheme No. 17—Amendment No. 194 Ref: TPS/2754 It is hereby notified for public information, in accordance with section 87 of the Planning and Development Act 2005 that the Minister for Planning approved the City of Swan Local Planning Scheme amendment on 10 February 2022 for the purpose of— (a) Modify the wording of Condition No.2 of Special Use Zone No.24 in Schedule 4—Special Use Zones as follows— No. Description of Land Special Use Conditions 24 Lot 57 on P28643 West Parade; Lot 9000 on DP30961 West Parade; Lot 200 on DP30961 West Parade; Lot 1 on P7052 West Parade, South Guildford. Precinct 1—Lot 57 on P28643, portion of Lot 9000 on DP30961 and portion Lot 1 on P7052 West Parade, South Guildford, as depicted in the Precinct Map. Precinct 2—Lot 200 on P30961 (including whole of existing Lodge), portion of Lot 9000 on DP30961 and portion Lot 1 on P7052 West Parade, South Guildford, as depicted in the Precinct Map.
- Subdivision and development shall be in accordance with a Structure Plan prepared in accordance with the provisions of Part 4 of the Planning and Development (Local Planning Scheme) Regulations 2015.
- Residential development shall be at a maximum density of R20, except where land is below the 20 ANEF exposure level, in which case the applicable density shall be in accordance with the Rosehill Waters Structure Plan.
- Notwithstanding the provisions of State Planning Policy 5.1 Land Use Planning in the Vicinity of Perth Airport, noise insulation in accordance with AS2021-2015: Acoustics— Aircraft Noise Intrusion—Building Siting and Construction is required as a minimum for residential development within the 20-25 ANEF contour.
- A notification is to be included on all titles and within sale contracts, to be signed and acknowledged by all purchasers, which states as follows— This land is subjected to aircraft noise at any time by the 24 hour a day, 7 day a week passenger and freight aircraft flight operations arriving and departing Perth Airport. The frequency of aircraft movements and the size of aircraft are forecast to increase indefinitely into the future. It is the responsibility of landowners to noise alteruate their property to ensure their amenity, as Perth Airport will remain curfew free.
- Signage indicating ‘Aircraft Noise Area’ is to be erected and maintained to the east and west of the development on West Parade. Such signage is to be erected prior to the sale of any lot or the advertising of the lots for sale and is to be maintained permanently thereafter. (and subsequent provisions as stated thereafter) D LUCAS, Mayor. J EDWARDS, Chief Executive Officer. ———————————
4 March 2022 GOVERNMENT GAZETTE, WA 481 PL403 PLANNING AND DEVELOPMENT ACT 2005 APPROVED LOCAL PLANNING SCHEME AMENDMENT City of Greater Geraldton Local Planning Scheme No. 1—Amendment No. 17 Ref: TPS/2805 It is hereby notified for public information, in accordance with section 87 of the Planning and Development Act 2005 that the Minister for Planning approved the City of Greater Geraldton Local Planning Scheme amendment on 30 November 2021 for the purpose of—
- Rezoning Lot 156 (No. 331) Place Road, Strathalbyn from ‘Residential R5’ to ‘Commercial’; and
- Modifying the Scheme Map accordingly. S G VAN STYN, Mayor. R MCKIM, Chief Executive Officer. ——————————— PL404 PLANNING AND DEVELOPMENT ACT 2005 APPROVED LOCAL PLANNING SCHEME AMENDMENT City of Armadale Ref: TPS/2695 It is hereby notified for public information, in accordance with section 87 of the Planning and Development Act 2005 that the Minister for Planning approved the City of Armadale Local Planning Scheme amendment on 22 February 2022 for the purpose of— (a) Amending Special Control Map 3 as shown on the attached Proposed Zoning—Special Control Area Map 3 Plan and include the area as Development Contribution Area No. 8 and insert Development Contribution Plan No. 8 into Schedule 9B of Town Planning Scheme No. 4 as follows— No. Description of Land Contribution Arrangements 8 Development Contribution Area (DCA) 8— West of Rail Redevelopment Area as identified on Scheme Special Control Area Map 3. 4.1 Relationship to other plans and other parts of the Scheme The development contribution plan generally conforms to the Approved Structure Plans for Development Contribution Area 8 and the Local Planning Strategy, Armadale Activity Centre Structure Plan, Corporate Business Plan and Strategic Community Plan. Where the provisions of Development Contribution Plan 8 are inconsistent with the provisions of Part 5A of the Scheme, then the provisions of Development Contribution Plan 8 in S the extent of any inconsistency. 4.2 Definitions Assessed Value means a land value obtained in accordance with the procedures described in clauses 4.4.5 to 4.4.6 of Development Contribution Plan 8. Developable Area is defined as a total area of land minus land area deductions as detailed in the Development Contribution Plan 8 Infrastructure Cost Schedule. Development Contribution Plan Report means a report appurtenant to the Scheme and Development Contribution Plan 8, and containing information and instructions on the operation of Development Contribution Plan 8, as periodically reviewed in accordance with Development Contribution Plan 8. Infrastructure Cost Schedule means a schedule appurtenant to the Scheme and Development Contribution Plan 8, and containing the estimated cost of Infrastructure and Administration of Development Contribution Plan 8, contribution cost, land area deductions and land area summary, as periodically reviewed in accordance with Development Contribution Plan 8. 4.3 Infrastructure and Administrative Items to be funded 4.3.1 Infrastructure Item 1a—Movement Network and Urban Plaza Full cost to construct Cornish Street, including laneway connection to Fifth Avenue, urban plaza and land acquisition as detailed in the Development Contribution Plan Report and Infrastructure Cost Schedule.
482 GOVERNMENT GAZETTE, WA 4 March 2022 4.3.2 Infrastructure Item 2a—Public Utilities Contribution towards the Sewer Upgrade from Cornish Street to Fifth Avenue as detailed in the Development Contribution Plan Report and Infrastructure Cost Schedule. 4.3.3 Administration Costs— Full costs associated with preparing and administering Development Contribution Plan 8 4.4 Method for Calculating Contributions and Assessed Values 4.4.1 Approach Contributions for infrastructure items will be calculated on a Developable Area basis. 4.4.2 Cost Contribution Calculation The contribution to be made by each Owner to the implementation of the Infrastructure and Administration Costs shall be a Cost Contribution, based on a per square metre basis calculated by the Local Government as follows— 4.4.2.1 Infrastructure Items per Square Metre Rate calculation (a) Calculation for entire Development Contribution Area Infrastructure Items per Square Metre Rate (E) calculated as follows at each review of the Infrastructure Cost Schedule and to remain applicable from the approval of one review to approval of the next— Cost of infrastructure items where the costs are to be shared across the entire Development Contribution Area 8 as detailed in the Infrastructure Cost Schedule (A) + (plus) Administrative Costs (B) minus contributions collected (C) / (divide) total Developable Area remaining (m2) for Development Contribution Area 8 (D). A + B—C / D = E 4.4.2.2 Cost Contribution Due The Cost Contribution due by owners shall be based on the Developable Area of an owners land parcel and calculated as follows— i. Cost Contribution due by owners that is applicable to all Developable Area within Development Contribution Area 8— ii. Developable Area (m2) of an owners land parcel x (multiply) Infrastructure items per Square Metre Rate. 4.4.3 Valuations The provisions of Clauses 5A.9.2 to 5A.9.6 of the scheme do not apply to Development Contribution Plan 8. The following variations apply to the acquisition of land for Infrastructure Works, calculation of costs and valuation of land within Development Contribution Area 8. 4.4.4 Compulsory Acquisition Where land has been compulsorily acquired and a lawful claim for compensation has been served on the Council, the Council may claim compensation for betterment under Section 184 of the Planning and Development Act 2005 and the value attributed to the betterment of the land the subject of the claim shall be set off against any compensation otherwise payable to the claimant under the Land Administration Act 1997 or any re-enactment of its provisions related to compulsory acquisition and compensation. 4.4.5 Assessed Value (a) The Council may at any time ascertain the value of any land in Development Contribution Plan 8 for the purpose of estimating Infrastructure costs, payments and cost contributions. (b) If it is necessary, for any purpose to ascertain the value of any land, such value should be determined by two licensed valuers appointed from time to time by the local
4 March 2022 GOVERNMENT GAZETTE, WA 483 government herein referred to as “the Valuation Panel”. The members of the Valuation Panel may confer as to value, and if they are unable to arrive at a consensus value, they shall confer with the Chief Executive Officer of the local government (“CEO”) or the officer to whom the CEO delegates that function from time to time. If the valuers with the officer cannot arrive at a consensus value then the officer shall select a value which represents the median value between the two values nominated by the valuers on the Valuation Panel and will be advertised under the next following paragraph (c) (“the Assessed Value”). The Valuation Panel may determine more than one Assessed Value in the Development Contribution Plan area, where the local government or the Panel identifies that there are significant differences in land values within Development Contribution Area 8. (c) As soon as possible after the Assessed Value or Assessed Values have been ascertained it should be advertised for a period of not less than 28 days to allow for submissions to be made in regard to the proposed Assessed Value or Assessed Values. Assessed Values may be advertised concurrently as part of a Development Contribution Plan 8 review carried out in accordance with Clause 4.8.1 of Development Contribution Plan 8. An owner who lodges an objection under this clause shall submit with the objection supporting evidence from a suitably qualified person in the specific field being objected to. (d) The local government shall as soon as possible consider all submissions made on an Assessed Value and may refer any submission to the Valuation Panel for comment, but where a submission is accompanied by expert valuation advice based on the valuation principles contained in Development Contribution Plan 8. It should be referred by the local government to the Valuation Panel for comment. Having considered the submissions and any comment from the Valuation Panel, the local government shall fix upon the Assessed Value or Assessed Values to be applied under Development Contribution Plan 8 and Infrastructure Cost Schedule until the next Assessed Value or Assessed Values has been determined. (e) It is intended that any Assessed Value or Assessed Values should apply for no more than 13 months but while an Assessed Value remains current it shall stand as the value of land within Development Contribution Plan 8 and Infrastructure Cost Schedule for all purposes under Development Contribution Plan 8 and Part 5A of the scheme and the Infrastructure Cost Schedule. (f) Where land is ceded or acquired for a Infrastructure Work, otherwise than by compulsory taking, for the purpose of determining the amount to be paid to the owner from whom the land is acquired, the value of the land shall be calculated according to the same Assessed Value as was applied to the Cost Contribution paid or payable by that owner on the clearance by the local government of the subdivision of land in the same deposited plan as contains the land acquired. 4.4.6 Valuation Principles In ascertaining the Assessed Value or Assessed Values under Development Contribution Plan 8, all land shall be valued in its broad acre form as depicted on 1 January 2020 or other date selected by the Local Government, ignoring any services or infrastructure provided in-accordance with the provisions of the relevant Local Structure Plan and applying the following principles— i. regard is to be had to the land classifications and zonings existing at the date of valuation; ii. the date of valuation is to be the date on which the local government nominates;
484 GOVERNMENT GAZETTE, WA 4 March 2022 iii. ignoring any improvements or works on the land; iv. the land should be valued without regard to the Infrastructure work and the purpose for which the land is acquired shall not be taken into consideration; v. in selecting relevant sales evidence, regard should be had first to values derived from land in the same area, and if there is not adequate evidence, from nearby or similar land in the area, in priority to any other sales evidence; and vi. the method of valuation shall otherwise be in accordance with normal fair market valuation principles. 4.4.7 Variance and Solatium (a) When calculating or reviewing Contribution Costs and the Infrastructure Cost Schedule, the local government will have regard to the value of the land required for Infrastructure and include an amount of 10% over and above the Assessed Value of such land, to ensure that the local government has or will receive sufficient funds in Development Contribution Plan 8 account to acquire land for Infrastructure to meet its obligations for appropriate payment to such owners, and ensure the Infrastructure can be completed in a manner that minimises the need for external borrowing. The local government may also apply a further amount above the Assessed Value to recognize any compulsory taking of land, compensations and/or acquisition of structures. (b) Where land is acquired in the circumstances contemplated in subclause 4.4.5 (f) of Development Contribution Plan 8, the Council shall pay to the owner an additional amount not more than 10% of the amount calculated under that Clause. 4.4.8 Acquisition Prior to Gazettal Where land required for Infrastructure is ceded to the Crown or acquired by the local government prior to the Minister granting final approval and publication of the Development Contribution Plan 8. Amendment in the Government Gazette, the appointment of the Valuation Panel by the local government under of Development Contribution Plan·8 or adoption of the Infrastructure Cost Schedule by the Council. the land shall be value in accordance with the clauses 4.4.3 to 4.4.7 of Development Contribution Plan 8 by the Valusation Panel and the date of valuation shall be the date land for the Infrastructure Work is acquired by the local government or the local government issues its clearance to the deposited plan that contains the Infrastructure land, whichever is the earlier. 4.4.9 Provision of Land for Infrastructure Works Where the Infrastructure Cost Schedule includes a land component for a Infrastructure on the relevant lot for which a Cost Contribution is due, an Owner shall cede to the Crown or transfer to the local government the required Infrastructure land at the first stage of subdivision and/or development for that particular landholding or by prior agreement at an alternative date agreed by the local government. The value of the land will be determined in accordance with Development Contribution Plan 8 and Owners will be paid once the land is ceded to the Crown or transferred to the local government and is already included in Development Contribution Plan 8 and sufficient funds have been collected in the Development Contribution Plan 8 account and / or having regard to the timing and priority of infrastructure works. 4.5 Period of Operation 4.5.1 Development Contribution Plan 8 is proposed to operatefor a period of l2 years from the date of gazettal of the town planning scheme amendment that introduces Development Contribution Plan 8 into the Scheme, by which time development within Development Contribution Area is expected to be largely complete. The proposed timeframe
4 March 2022 GOVERNMENT GAZETTE, WA 485 aims to account for uncertainty regarding the staging and completion of development across the entire area. The City may in the future consider extending the period of operation , through an amendment to the Scheme, in the event that growth does not occur as rapidly as expected, or if new growth areas occur. The City may also terminate the Development Contribution Plan 8 earlier, through an amendment to the Scheme, if growth occurs quicker than expected and all contributions have been settled. All land within the Development Contribution Area is subject to the requirements of the Development Contribution Plan 8 until the plan expires or revoked. 4.6 Excess in Contributions 4.6.1 Clause 5A.8.2 of the scheme does not apply to Development Contribution Plan 8. If there is an excess in the total of Cost Contributions when all Cost Contributions have been made or accounted for in the Development Contribution Area, the local government is to refund the excess funds to the contributing owners or use all or some of the excess funds for improvements to infrastructure included in Development Contribution Plan 8 and subject to agreement from the majority of the contributing Owners. If, however, it is not reasonably practicable to identify Owners and their entitled amount of refund and consult with Owners, any excess in funds shall be applied to the provision of additional improvements to Infrastructure included in Development Contribution Plan 8. The local government should make information publically available regarding any spend of excess funds. 4.7 Timing and priority 4.7.1 The Local Government will use its best endeavours to provide Infrastructure, including the acquistion of land for infrastructure, as soon as possible taking into considering the Local Government’s Corporate Business Plan, the rate of development in Development Contribution Area 8 and funds collected in Development Contribution Plan 8. 4.8 Review 4.8.1 Review Development Contribution Plan 8 will be reviewed at least every 5 years from the date of gazettal or when considered appropriate having regard to the rate of development in the area since the last review and the degree of development potential still existing. The estimated Infrastructure Costs, Assessed Values and Infrastructure Cost Schedule will be reviewed and updated at least annually. The Review will reflect changes in material prices, design costs, design requirements, specifications, labour requirements, Assessed Values and other expenditure associated with Development Contribution Plan 8 and actual and forecast future development patterns in the area. In some instances the costs will be indexed based on the Local Government Cost Index (LGCI) or another appropriate index and they may be reviewed and certified by a suitably qualified person. The local government’s priority and timing for infrastructure will also be reviewed at least annually. Reviews of Development Contribution Plan 8 or Infrastructure Cost Schedule, including Assessed Values shall be undertaken in accordance with the provisions contained within the Development Contribution Plan 8 Report and applicable Local Government Local Planning Policy. In the absence of an applicable Local Government Local Planning Policy the provisions contained in the Development Contributions Plan 8 Report shall solely apply. R BUTTERFIELD, Mayor. J ABBISS, Chief Executive Officer.
486 GOVERNMENT GAZETTE, WA 4 March 2022 PREMIER AND CABINET PR401 INTERPRETATION ACT 1984 MINISTERIAL ACTING ARRANGEMENTS It is hereby notified for public information that the Governor in accordance with section 12(c) of the Interpretation Act 1984, has approved the following temporary appointment— Hon R H Cook MLA to act temporarily in the office of Premier; Treasurer; Minister for Public Sector Management; Federal-State Relations in the absence of the Hon M McGowan MLA for the period 4 March 2022. E. ROPER, Director General, Department of the Premier and Cabinet. TRANSPORT TN401 ROAD TRAFFIC (AUTHORISATION TO DRIVE) REGULATIONS 2014 EXEMPTION FROM FEE FOR TAKING OR RESITTING THEORY TEST (RTADR–2022–204977) Pursuant to regulation 76(2) of the Road Traffic (Authorisation to Drive) Regulations 2014 (the Regulations), I, Peter Woronzow, Chief Executive Officer of the Department of Transport, hereby specify that the persons and bodies listed below are persons and bodies for the purpose of subregulation (1) of that regulation. Regulation 76 provides that a person is not required to pay the fee set out in Schedule 9 items 1 and 2 of the Regulations, to take or resit a theory test if the person or body administering the test is specified in a notice published under subregulation (2). Organisation Name Address Marra Worra Worra Aboriginal Corporation (ABN: 97272775547) Lot 158 Great Northern Highway, Fitzroy Crossing, WA 6765 Bloodwood Tree Association Inc (ABN: 93975267470) 19 Hamilton Road, South Hedland, WA 6722 Fortescue Metals Group Ltd (ABN: 57002594872) Level 2, 87 Adelaide Terrace, East Perth, WA 6004 Mowanjum Aboriginal Corporation (ABN: 38721336893) 1/Lot 85 Gibb River Road, Derby WA 6728 Ngarliyarndu Bindirri Aboriginal Corporation (ABN: 67026946941) 46 Roe Street, Roebourne, WA 6718 Wunan Foundation (ABN: 61577218799) 76 Coolibah Drive, Kununurra, WA 6743 This Notice revokes and replaces the notice identified as RTADR-2021-204455, published in the Government Gazette on 1 June 2021. Dated 25 February 2022. PETER WORONZOW, Director General, Department of Transport.
4 March 2022 GOVERNMENT GAZETTE, WA 487 PUBLIC NOTICES ZZ401 TRUSTEES ACT 1962 DECEASED ESTATES Notice to Creditors and Claimants James William Black late of Lot 3 Railway Road, Boyanup, Western Australia, deceased. Creditors and other persons having claims (to which Section 63 of the Trustees Act 1962 relates) in respect of the estate of the deceased, who died on 20 November 2018, are required by the Administrator, Kathleen Shannon Black, care of P. A. Martino, PO Box 564, West Perth, WA, 6872 (Tel: (08) 9481 2777) to send particulars of their claim by Monday 4 April 2022, after which date the Administrator may convey or distribute the assets, having regard only to the claims of which she then has notice. ——————————— ZZ402 TRUSTEES ACT 1962 DECEASED ESTATES Notice to Creditors and Claimants Derek Charles Bunn late of 394 Redmond-Hay River Road, Redmond, Western Australia, deceased. Creditors and other persons having claims (to which Section 63 of the Trustees Act 1962 relates) in respect of the estate of the deceased, who died on 14 November 2021, are required by the trustee of the late Derek Charles Bunn of care of Philip Wyatt Lawyers, PO Box 1026, Albany, Western Australia 6331 to send particulars of their claims to them within one (1) month from the date of publication of this notice, after which date the trustee may convey or distribute the assets, having regard only to the claims of which it then has notice. Dated this 28th day of February 2022. PHILIP WYATT LAWYERS. ——————————— ZZ403 TRUSTEES ACT 1962 DECEASED ESTATES Notice to Creditors and Claimants Leslie Herman Wright, late of Unit 1/ 502 Bussell Highway, Broadwater 6280 in the State of Western Australia, deceased. Creditors and other persons having claims (to which Section 63 of the Trustees Act 1962 relates) in respect of the estate of the deceased, who died on October 21 2021, in Sir Charles Gairdner Hospital, Nedlands, Western Australia, are required by the trustee Ms Kirstine Forestier care of Sou’ West Legal Services, of PO Box 1744, Busselton, Western Australia, to send particulars of their claims to her by April 22nd 2022, after which date the trustee may convey or distribute the assets, having regard only to the claims of which she then has notice. ——————————— ZZ404 TRUSTEES ACT 1962 DECEASED ESTATES Notice to Creditors and Claimants In the matter of the Estate of Sylvia Yvonne Vandenberg late of Unit 25 MyVista Village, 11 Nugent Street, Balcatta in Western Australia, Control Operator, deceased. Creditors and other persons having claims (to which Section 63 of the Trustees Act 1962 relates) in respect of the estate of the deceased, who died on 21 December 2021, are required by the Executors of care of Fort Knox Legal, P.O. Box 390, West Perth, WA 6872, to send the particulars of their claims to Fort Knox Legal by one month from the publication of this notice after which date the Personal Representatives may convey or distribute the assets, having regard only to the claims of which they then have notice. ———————————
488 GOVERNMENT GAZETTE, WA 4 March 2022 ZZ405 TRUSTEES ACT 1962 DECEASED ESTATES Notice to Creditors and Claimants In the matter of the Estate of Freda Elizabeth Beardall, Widow, late of U19/301 Morrison Road, Swan View, Western Australia 6056, deceased. Creditors and other persons having claims (to which Section 63 of the Trustees Act 1962 relates) in respect to the deceased who died August 18th 2021 are required by the Administrator Sharon Gamble to forward details of their claim to ‘Administrator’, 510 McKnoe Drive Morangup WA 6083 within 1(one) month of publication of this notice after which date the Administrator may convey or distribute the assets having regard only to those claim of which they have notice. ——————————— ZZ406 TRUSTEES ACT 1962 DECEASED ESTATES Notice to Creditors and Claimants Alison Jane Eve Jackson (in the will Alison Jane Eve Jackson-Leist), late of 412/2 Tiger Way, Claremont WA 6010, deceased. Creditors and other persons having claims (to which Section 63 of the Trustees Act 1962 (WA) relates) in respect of the estate of the deceased, who died on 25 May 2021, are required by the personal representative, Judith Louise Joukador of care of Ilberys Lawyers, GPO Box B51, Perth WA 6838 to send particulars of their claims to her by no later than 5 April 2022, after which date the personal representative may convey or distribute the assets, having regard only to the claims of which she then has notice. ——————————— ZZ407 TRUSTEES ACT 1962 DECEASED ESTATES Notice to Creditors and Claimants Hilda James (also commonly known as Terri James) late of Howard Solomon Aged Care Facility, Hybanthus Road, Ferndale in the State of Western Australia, deceased. Creditors and other persons having claims (to which Section 63 of the Trustees Act 1962 relates) in respect of the Estate of the Deceased who died on 7 February 2020, are required by the Trustee, Nicholas Mark James of 16 Bursaria Crescent, Ferndale in the State of Western Australia, to send particulars of their claims to him within one (1) month of the date of this notice, after which date the Trustee may convey or distribute the assets, having regard only to the claims which he then has notice. ——————————— ZZ408 TRUSTEES ACT 1962 DECEASED ESTATES Notice to Creditors and Claimants Dorothy Isabel Millar, late of Joseph Cooke House, 2 Houtmans Street, Shelley in the State of Western Australia, deceased. Creditors and other persons having claims (to which Section 63 of the Trustees Act 1962 relates) in respect of the Estate of the Deceased who died on 2 November 2021, are required by the Trustee, David Morgan Lewis of Lewis Kitson Lawyers, Level 1, 43 Kishorn Road, Applecross in the State of Western Australia, to send particulars of their claims to him within one (1) month of the date of this notice, after which date the Trustee may convey or distribute the assets, having regard only to the claims which he then has notice. ———————————
4 March 2022 GOVERNMENT GAZETTE, WA 489 ZZ409 TRUSTEES ACT 1962 DECEASED ESTATES Notice to Creditors and Claimants Jane Blair Marshall Cattan, late of 31 Barnes Avenue, Australind, Western Australia, 6233, deceased. Creditors and other persons having claims (to which Section 63 of the Trustees Act 1962 relates) in respect of the estate of the deceased, who died 29th August 2021, are required by the Administrator Vivian W McAvaney, of 40C Leeds Street, Dianella, Western Australia, 6059 to send particulars of their claims by the date one month from the publication date after which date the administrator may convey or distribute the assets having regard only to the claims of which she then has notice. ——————————— ZZ410 TRUSTEES ACT 1962 DECEASED ESTATES Notice to Creditors and Claimants Creditors and other persons having claims (to which Section 63 of the Trustees Act 1962 relates) in respect of the Estates of the undermentioned deceased persons are required to send particulars of their claims to me on or before 4 April 2022 after which date I may convey or distribute the assets, having regard only to the claims of which I then have notice. Blackley, Mary Jane, late of 17 Crestview Crescent, Kalamunda, who died on 15 August 2021 (DE19963136 EM38). Brandis, Eruthia Mary, late of Hale House, Unit 103, 31 Waverley Road, Coolbellup, who died on 12 January 2022 (DE19991795 EM18). Evans, Norma Caroline, late of Acacia Menora Gardens, 51 Alexander Drive, Menora, who died on 7 February 2022 (DE33031363 EM13). Fitzpatrick, Nancy, late of Brightwater South Lake Aged Care, 62 Bloodwood Circle, South Lake, who died on 1 October 2015 (PM19741136 EM214). Goldsmith, Tracey Anne (also known as Tracey Anne Prout), late of Unit 1, 1 Mornington Boulevard, Waikiki, who died on 4 October 2020 (DE19932255 EM18). Johansen, Betty, late of 26 Grigg Place, Hilton, who died on 19 January 2022 (PM33162726 EM27). Lynch, Peter, late of 16 Pola Street, Dianella, who died on 15 August 2021 (DE19611551 EM18). Properjohn, Glenn Maxwell, formerly of 1/81 Thelma Street, Como, late of Agmaroy Nursing Home, 115 Leach Highway, Wilson, who died on 15 November 2021 (DE33149020 EM23). Rasmussen, Else, formerly of 84 Eddystone Avenue, Craigie, late of MercyCare Joondalup, 21 Aldwych Way, Joondalup, who died on 10 January 2022 (DE19954317 EM17). Steenson, Laota Coralie, formerly of 55A Hillsborough Drive, Nollamara, late of Brightwater Redcliffe, 23 Johnson Road, Redcliffe, who died on 6 July 2021 (DE33035168 EM36). Wilson, Barry Francis, late of Bethanie Peel Aged Care Home, 2 Maclaggan Turn, Coodanup, who died on 8 January 2022 (DE19892239 EM18). Young, Margaret, formerly of 1/15 Torbay Mews, Warnbro, late of Aegis Shoalwater, 72 Fourth Avenue, Shoalwater, who died on 24 January 2022 (DE19851482 EM16). BRIAN ROCHE, Public Trustee, 553 Hay Street, Perth WA 6000. Telephone: 1300 746 212.