Creates the local planning rules for land in Burwood: zoning, permitted/prohibited uses, development standards (height, floor‑space ratios, minimum lot sizes), heritage protection, exempt/complying development and site‑specific controls. The Council is the consent authority (cl 1.6) and maps in the Plan determine where particular rules apply.
Developers and landowners pay for compliance, mitigation and any contributions (for example, affordable housing contributions—cl 6.9). The Council decides consents and exercises discretion on design, heritage, flood and environmental matters (see cl 4.6, cl 5.10, cl 5.21).
Mechanically, this instrument is the local environmental plan (LEP) that establishes the statutory land use framework for the Burwood local government area. It: repeals earlier local instruments applying to the same land (cl 1.8); comes into force on publication on the NSW legislation website (cl 1.1AA); identifies the Council as the consent authority subject to the Act (cl 1.6); and fixes zones, development controls and mapped limits (Land Zoning Map, Height of Buildings Map, Floor Space Ratio Map, Lot Size Map, Heritage Map, Active Street Frontages Map, Acid Sulfate Soils Map and Land Reservation Acquisition Map) that govern what development is permitted, requires consent, or is prohibited (cls 2.1-2.3, 2.2, 4.3, 4.4, 4.5). The Plan also sets out exempt and complying development lists and rules (Part 3, Schedules 2 and 3), principal development standards (Part 4), and a suite of local provisions, precinct-based controls and schedules (Part 6, Schedules 1-6). It preserves the State policy architecture: State environmental planning policies (SEPPs) prevail where they apply (cl 1.9(1)).
The Plan states its aims in cl 1.2, principally to make local planning provisions in accordance with the relevant standard instrument under s 3.20 of the Act and, in particular, to protect and promote arts and cultural activity, to create a land use framework for detailed provisions, to encourage or restrict development according to suitability, to provide varied housing types and to encourage business and employment growth (cl 1.2(1)-(2)(aa), (a)-(d)). Those aims are expressed policy rationales within the instrument.
Testing those claimed aims against the instrument’s mechanics shows how the Plan converts policy into regulatory incentives and constraints. Zoning (Part 2 and the Land Use Table) channels land uses to specific locations and limits what may be carried out without consent (cl 2.3(1)-(3)). Maximum building heights and floor space ratios are fixed by maps and by numerical rules (cls 4.3, 4.4, 4.4A) and are subject to targeted exceptions and uplift where community infrastructure is provided (cl 4.4A(5)-(6)). Heritage protections require consent for a wide range of works affecting listed items and conservation areas and enable the consent authority to require heritage impact documents (cl 5.10). The Plan also expressly restricts some development types (for example canal estate development is prohibited, cl 2.9) and removes private restraints that would otherwise block development to the extent necessary (suspension of covenants, cl 1.9A), thereby lowering the transaction cost of obtaining statutory consent while preserving specified public-interest or Crown instruments (cl 1.9A(2)-(3)).
Current sections
Direct links to the current provisions in Burwood Local Environmental Plan 2012.
State Environmental Planning Policy (Transport and Infrastructure) 2021, Chapter 2—relating to infrastructure facilities, including air transport, correction, education, electricity generating works and solar energy systems, health services, ports, railways, roads, waste management and water supply systems
Attached dwellings; Bed and breakfast accommodation; Boarding houses; Building identification signs; Business identification signs; Centre-based child care facilities; Community facilities; Dwelling houses; Group homes; Home industries; Hostels; Multi dwelling housing; Neighbourhood shops; Oyster aquaculture; Places of public worship; Pond-based aquaculture; Residential flat buildings; Respite day care centres; Semi-detached dwellings; Seniors housing; Serviced apartments; Shop top housing; Tank-based aquaculture; Any other development not specified in item 2 or 4
4
Prohibited
4 Prohibited
4 Prohibited
Advertising structures; Agriculture; Air transport facilities; Airstrips; Amusement centres; Animal boarding or training establishments; Biosolids treatment facilities; Boat building and repair facilities; Boat launching ramps; Boat sheds; Camping grounds; Car parks; Caravan parks; Cemeteries; Charter and tourism boating facilities; Commercial premises; Correctional centres; Crematoria; Depots; Eco-tourist facilities; Electricity generating works; Entertainment facilities; Environmental facilities; Environmental protection works; Exhibition villages; Extractive industries; Farm buildings; Forestry; Freight transport facilities; Function centres; Heavy industrial storage establishments; Helipads; Highway service centres; Home occupations (sex services); Industrial retail outlets; Industrial training facilities; Industries; Information and education facilities; Jetties; Local distribution premises; Marinas; Mooring pens; Moorings; Mortuaries; Open cut mining; Passenger transport facilities; Public administration buildings; Recreation facilities (indoor); Recreation facilities (major); Recreation facilities (outdoor); Registered clubs; Research stations; Restricted premises; Rural industries; Service stations; Sewage treatment plants; Sex services premises; Storage premises; Tourist and visitor accommodation; Transport depots; Truck depots; Vehicle body repair workshops; Vehicle repair stations; Veterinary hospitals; Warehouse or distribution centres; Waste or resource management facilities; Water recreation structures; Water recycling facilities; Water storage facilities; Water treatment facilities; Wharf or boating facilities; Wholesale supplies
Part 3
Exempt and complying development
Part 3 Exempt and complying development
Part 3 Exempt and complying development
Part 4
Principal development standards
Part 4 Principal development standards
Part 4 Principal development standards
Part 5
Miscellaneous provisions
Part 5 Miscellaneous provisions
Part 5 Miscellaneous provisions
5
Relevant acquisition authority
5 Relevant acquisition authority
5.1 Relevant acquisition authority
(1) The objective of this clause is to identify, for the purposes of section 3.15 of the Act, the authority of the State that will be the relevant authority to acquire land reserved for certain public purposes if the land is required to be acquired under Division 3 of Part 2 of the Land Acquisition (Just Terms Compensation) Act 1991 (the owner-initiated acquisition provisions).
Note.
If the landholder will suffer hardship if there is any delay in the land being acquired by the relevant authority, section 23 of the Land Acquisition (Just Terms Compensation) Act 1991 requires the authority to acquire the land.
(2) The authority of the State that will be the relevant authority to acquire land, if the land is required to be acquired under the owner-initiated acquisition provisions, is the authority of the State specified below in relation to the land shown on the Land Reservation Acquisition Map (or, if an authority of the State is not specified in relation to land required to be so acquired, the authority designated or determined under those provisions).
| Type of land shown on Map | Authority of the State |
| Zone RE1 Public Recreation and marked “Local open space” | Council |
| Zone RE1 Public Recreation and marked “Regional open space” | The corporation constituted under section 2.5 of the Act |
| Zone SP2 Infrastructure and marked “Classified road” | Transport for NSW |
| Zone C1 National Parks and Nature Reserves and marked “National Park” | Minister administering the National Parks and Wildlife Act 1974 |
| Zone R1 General Residential and marked “Local Road” | Council |
| Zone R2 Low Density Residential and marked “Local Road” | Council |
| Zone MU1 Mixed Use and marked “Local Road” | Council |
| Zone E3 Productivity Support and marked “Local Road” | Council |
(3) Development on land acquired by an authority of the State under the owner-initiated acquisition provisions may, before it is used for the purpose for which it is reserved, be carried out, with development consent, for any purpose.
Note.
When this Plan was made it did not include Zone C1 National Parks and Nature Reserves.
(1) The objective of this clause is to ensure that development does not disturb, expose or drain acid sulfate soils and cause environmental damage.
(2) Development consent is required for the carrying out of works described in the Table to this subclause on land shown on the Acid Sulfate Soils Map as being of the class specified for those works.
| Class of land | Works |
| 1 | Any works. |
| 2 | Works below the natural ground surface.Works by which the watertable is likely to be lowered. |
| 3 | Works more than 1 metre below the natural ground surface.Works by which the watertable is likely to be lowered more than 1 metre below the natural ground surface. |
| 4 | Works more than 2 metres below the natural ground surface.Works by which the watertable is likely to be lowered more than 2 metres below the natural ground surface. |
| 5 | Works within 500 metres of adjacent Class 1, 2, 3 or 4 land that is below 5 metres Australian Height Datum and by which the watertable is likely to be lowered below 1 metre Australian Height Datum on adjacent Class 1, 2, 3 or 4 land. |
(3) Development consent must not be granted under this clause for the carrying out of works unless an acid sulfate soils management plan has been prepared for the proposed works in accordance with the Acid Sulfate Soils Manual and has been provided to the consent authority.
(4) Despite subclause (2), development consent is not required under this clause for the carrying out of works if—
(a) a preliminary assessment of the proposed works prepared in accordance with the Acid Sulfate Soils Manual indicates that an acid sulfate soils management plan is not required for the works, and
(b) the preliminary assessment has been provided to the consent authority and the consent authority has confirmed the assessment by notice in writing to the person proposing to carry out the works.
(5) Despite subclause (2), development consent is not required under this clause for the carrying out of any of the following works by a public authority (including ancillary work such as excavation, construction of access ways or the supply of power)—
(a) emergency work, being the repair or replacement of the works of the public authority, required to be carried out urgently because the works have been damaged, have ceased to function or pose a risk to the environment or to public health and safety,
(b) routine maintenance work, being the periodic inspection, cleaning, repair or replacement of the works of the public authority (other than work that involves the disturbance of more than 1 tonne of soil),
(c) minor work, being work that costs less than $20,000 (other than drainage work).
(6) Despite subclause (2), development consent is not required under this clause to carry out any works if—
(a) the works involve the disturbance of less than 1 tonne of soil, and
(b) the works are not likely to lower the watertable.
Exempt development may be carried out without the need for development consent under the Act. Such development is not exempt from any approval, licence, permit or authority that is required under any other Act and adjoining owners’ property rights and the common law still apply.
sch.2-sec
Signage—general
sch.2-sec Signage—general
Signage—general
All signage must comply with the following—
(a) must not cover any mechanical ventilation inlet or outlet vents,
(b) if over a public road—must be at least 600mm from kerb or roadway edge,
(c) must not be moving, flashing or running signage,
(d) must not be located on land on which there is a heritage item or that is in a heritage conservation area.
Must involve only the replacement of panels on an existing sign.
sch.2-sec-oc.5
Signage—non-illuminated signs behind glass frontage of shops
sch.2-sec-oc.5 Signage—non-illuminated signs behind glass frontage of shops
Signage—non-illuminated signs behind glass frontage of shops
Must not cover more than 15% of the glass frontage area.
sch.2-sec-oc.6
Signage—temporary signs
sch.2-sec-oc.6 Signage—temporary signs
Signage—temporary signs
Temporary signs must comply with the following—
(a) must announce a local event of a religious, educational, cultural, social or recreational nature,
(b) must not contain commercial advertising except the event’s sponsor or sponsors,
(c) must only be displayed for 28 days before, and 7 days after, the event,
(d) if in the form of posted bills or the like—must not be applied to poles, posts or any other structure on land under the care or control of the Council.
(c) land within a wetland of international significance declared under the Ramsar Convention on Wetlands.
Note.
Nothing in this clause affects any requirement under an Act relating to land specified in this clause to obtain a licence or other authority under that Act for development of the land.
8
Flood liability
8 Flood liability
8 Flood liability
Must be designed or constructed on land so that it will not be inundated by the discharge of a 1:100 ARI (average recurrent interval) flood event.
9
Species selection
9 Species selection
9 Species selection
Species of fish or marine vegetation cultivated or kept must be consistent with the relevant aquaculture industry development plan (within the meaning of clause 5.19).
10
Pond design
10 Pond design
10 Pond design
(1) Must not require the construction of new ponds, water storages, dams or buildings.
(2) Must not be located on permanent watercourses, creeks, billabongs or isolated outreaches of creeks or rivers.
(3) Must be capable of preventing the escape of stock into natural waterbodies or wetlands.
11
Culture water
11 Culture water
11 Culture water
Must use freshwater.
Source text: opening excerpt
Sourced from legislation.nsw.gov.au, CC BY 4.0.
Part 1 Preliminary
Part 1 Preliminary
Part 1 Preliminary
1 Name of Plan
1 Name of Plan
1.1 Name of Plan
This Plan is Burwood Local Environmental Plan 2012.
1 Commencement
1 Commencement
1.1AA Commencement
This Plan commences on the day on which it is published on the NSW legislation website.
1 Aims of Plan
1 Aims of Plan
1.2 Aims of Plan
(1) This Plan aims to make local environmental planning provisions for land in Burwood in accordance with the relevant standard environmental planning instrument under section 3.20 of the Act.
(2) The particular aims of this Plan are as follows—
(aa) to protect and promote the use and development of land for arts and cultural activity, including music and other performance arts,
(a) to create a land use framework that allows detailed provisions to be made,
(b) to encourage or restrict development of land according to its suitability for various purposes,
(c) to encourage provision of a range of housing types,
(d) to encourage growth in business and employment development.
The Dictionary at the end of this Plan defines words and expressions for the purposes of this Plan.
1 Notes
1 Notes
1.5 Notes
Notes in this Plan are provided for guidance and do not form part of this Plan.
1 Consent authority
1 Consent authority
The instrument therefore creates a calibrated mix of command (mapped limits and prohibited uses), delegated discretion (consent authority obligations, heritage and design tests), procedural constraints (requirements for heritage management documents, acid sulfate soils management plans, BASIX-related exclusions in cl 4.6(8)), and limited incentives (FSR uplift for community infrastructure, cl 4.4A(5)-(6), and affordable housing contribution mechanisms for a defined masterplan precinct, cl 6.9). The Council is the principal decision‑maker; many obligations are couched as matters the consent authority must be satisfied about (for example cls 2.3(2), 4.3A(2), 6.3(3), 6.5(3)), which concentrates operative discretion at the local level (cl 1.6).
Key procedural transitions are effected by savings and commencement rules. Development applications lodged before commencement must ordinarily be determined under the previous instrument (cl 1.8A), and amendments to the Plan may be insulated from pending DAs in specified ways (cl 1.8A(2)-(3)).
For users (owners, applicants, advisers, Council officers), the Plan must be read with its maps and schedules and with relevant SEPPs and the Act, because the Plan frequently cross-references other instruments and disapplies or defers to SEPPs where those prevail (cl 1.9).
Main concepts
This LEP organises the local planning regime around a set of recurring legal and geographic instruments. The principal concepts are:
Zoning and the Land Use Table (cls 2.1-2.3). The Plan lists zones (R1, R2, R3, E1, E3, MU1, SP2, RE1, RE2) (cl 2.1) and the Land Use Table specifies objectives for each zone, development that may be carried out without consent, development that requires consent and development that is prohibited (cl 2.3(1), Land Use Table). The consent authority must have regard to zone objectives when determining DAs (cl 2.3(2)).
Mapped numerical standards. Maximum heights (cl 4.3) and floor space ratios (cl 4.4) are determined by the relevant maps. Clause 4.3A creates building height planes as a mapped control in “Area A” with technical parameters (cl 4.3A(2)-(3)). Clause 4.4A creates detailed exceptions and area‑based limits for residential gross floor area and serviced‑apartment floor space; it also enables FSR uplift in Areas 1 and 2 if community infrastructure is delivered (cl 4.4A(3)-(6)).
Calculation rules. Clause 4.5 defines floor space ratio and sets out granular rules for determining site area, exclusions (e.g., community land, prohibited land), strata overlap, and how to prevent “double dipping” for consolidated sites via registration of covenants as a consent condition (cl 4.5(2)-(11)). The Plan excludes certain elements from gross floor area calculations in defined circumstances (cl 4.4(2A)).
Exempt and complying development. Part 3 and Schedules 2 and 3 identify minor developments that may be carried out without consent (exempt) or as complying development, subject to standards, building code compliance and exclusions for environmentally sensitive areas (cls 3.1-3.3, Schs 2-3). Exempt/compliant categories are constrained by heritage, coastal/wetland and biodiversity exclusions (cl 3.1(3)(d); cl 3.3).
Heritage. Schedule 5 lists heritage items and identification of conservation areas, while cl 5.10 requires consent for demolition, exterior alterations or other works affecting listed heritage items or Aboriginal places and empowers the consent authority to require heritage assessment or conservation management plans before granting consent (cl 5.10(2)-(6), (8)-(10)).
Special local provisions. Part 6 sets localised controls (acid sulfate soils cl 6.1; active street frontages cl 6.3; location of sex services premises cl 6.4; design excellence for larger buildings cl 6.5) and site‑specific controls (Cooper Street, Cheltenham Road, certain Burwood land, Croydon North Precinct affordable housing and minimum site area rules cl 6.6-6.10).
Interplay with other instruments and Crown/third‑party interests. SEPPs prevail where relevant (cl 1.9(1)); cl 1.9A suspends private covenants where necessary to enable Plan‑consistent development but expressly excludes Councillor‑imposed covenants, Crown land instruments, conservation agreements and planning agreements (cl 1.9A(1)-(2)). Clause 5.12 confirms that the Plan does not restrict development permitted under State SEPP Chapter 2 infrastructure provisions nor the Crown’s use of its existing buildings (cl 5.12(1)-(2)).
Procedural and evidentiary requirements. The Plan creates several application‑stage triggers: acid sulfate soils management plans must accompany certain works (cl 6.1(3)); conversions of fire alarm monitoring can be complying development but are subject to particular certificate conditions (cl 5.8); development that proposes to contravene a development standard must be justified with environmental planning grounds and the consent authority must keep a record of that assessment (cl 4.6(2)-(4)).
These concepts structure incentives by limiting permitted private choices to mapped zones and numerical caps while granting the consent authority discrete discretion to approve departures, impose covenants and require conservation measures. Many obligations are expressed as matters the consent authority must be “satisfied” about, which places evaluation power with Council (e.g. cl 2.3(2), cl 6.3(3), cl 6.5(3)).
Who it affects
Primary decision‑makers and regulated parties are identified in the Plan’s text:
The Council is the statutory consent authority for the Plan area (cl 1.6). That places operational discretion (granting/refusing consent, imposing conditions, requiring heritage or acid sulfate management plans, imposing covenants under cl 4.5(9)) firmly with the local authority.
Landholders and prospective developers. Owners and applicants must comply with mapped zoning and development controls, secure development consent where required (e.g. subdivision cl 2.6, demolition cl 2.7), or meet the standards for exempt/compliant development (Part 3 and Schedules 2-3). Owners of heritage items or land within conservation areas face additional consent triggers and potential heritage management requirements (cl 5.10).
Tenants, licensees and operators of licensed premises. Clause 5.20 limits the grounds on which consent can be refused to licensed premises regarding music, dancing and associated features (cl 5.20(1)-(2)). That directly affects operators of pubs, clubs, restaurants and venues by constraining Council’s ability to refuse development based on genres, live vs amplified performance, number/type of performers, presence of dance floors, or certain decorative features; the consent authority may still require management measures if it is satisfied noise can be managed to an acceptable level (cl 5.20(2)).
Parties who hold private covenants or agreements affecting land. Clause 1.9A suspends covenants to the extent necessary to enable Plan‑consistent development, subject to explicit exclusions (cl 1.9A(1)-(2)). Private covenants imposed by the Council, Crown Land instruments, conservation agreements and planning agreements are preserved (cl 1.9A(2)(a)-(g)). Public authorities’ rights under registered instruments are not affected (cl 1.9A(3)).
Heritage and Aboriginal stakeholders. The Plan imposes notice and consultation mechanics for archaeological sites and Aboriginal places (cl 5.10(7)-(8)), requiring the consent authority to notify the Heritage Council or local Aboriginal communities and to consider their responses within 28 days.
Service and infrastructure agencies. The Plan identifies relevant acquisition authorities for land reserved for public purposes (cl 5.1(2)) and states which State authority is the relevant authority for owner‑initiated acquisition (cl 5.1(2) table). The Plan also expressly does not restrict development permitted under State infrastructure SEPP Chapter 2 (cl 5.12(1)).
Users within nominated precincts. Specific land in Croydon North Masterplan Precinct is subject to affordable housing obligations and minimum site area controls (cls 6.9-6.10). Applicants within those precinct boundaries must have regard to the precinct principles and may be required to provide a 2% affordable housing contribution or equivalent monetary/dedicated land contribution (cl 6.9(4)-(6)).
Indirectly affected groups include adjoining neighbours (since the consent authority must consider zone objectives and impacts on adjacent zoned land when dealing with unzoned land cl 2.4(2)), and the broader community through public land classification and the Plan’s public‑domain objectives (e.g. active street frontages cl 6.3, public recreation zones RE1/RE2).
Who pays: landowners and developers carry the direct compliance costs of preparing DAs, heritage or acid sulfate management plans (cls 5.10, 6.1), any affordable housing contributions (cl 6.9(5)-(7)), and potential covenants conditioned on consents (cl 4.5(9)). The Council bears administrative costs of decision‑making, consultation and maintaining maps (cl 1.7(3)).
Key duties and rights
The Plan imposes duties and confers rights principally through the consent framework and mapped development rules.
Duties of the consent authority (Council)
To have regard to zone objectives when determining DAs (cl 2.3(2)).
To be satisfied of specified matters before granting consent: e.g. temporary uses (cl 2.8(3)(a)-(d)); pond‑based/tank aquaculture (cl 5.19(2)); development near heritage items (cl 5.10(4), (6)); active street frontage requirements (cl 6.3(3)); design excellence for qualifying developments (cl 6.5(3)); and flood planning compatibility (cl 5.21(2)).
To keep a record of assessments where a development standard is contravened under cl 4.6 (cl 4.6(4)).
To notify and consider responses from the Heritage Council or Aboriginal communities where required (cl 5.10(7)-(8), (9)).
Duties of applicants and landowners
To obtain development consent where required by the Plan for development types listed as “permitted with consent” in the Land Use Table (cl 2.3(1); Land Use Table entries), for subdivision (cl 2.6), for demolition (cl 2.7) and for works in mapped acid sulfate soils areas unless a preliminary assessment determines otherwise (cl 6.1(2)-(4)).
To provide specified documentation with applications: acid sulfate soils management plans for certain works (cl 6.1(3)); BASIX or contravention justification documents where a development standard would be contravened (cl 4.6(3) and note); heritage management documents or conservation management plans if requested (cl 5.10(5)-(6)); and any other evidence that satisfies the consent authority’s specified tests (numerous clauses).
To comply with exempt and complying development conditions (Part 3, Schs 2-3). For a complying development certificate, conditions in Schedule 3 and the statewide SEPP are binding (cl 3.2(4)-(5)).
Rights and limitations
Right to carry out exempt development as specified in Schedule 2 if standards and other statutory criteria are met (cl 3.1).
Right to seek complying development certificates for eligible works specified in Schedule 3 and the statewide codes (cl 3.2).
Right to seek consent to contravene development standards under cl 4.6, but the applicant must demonstrate that compliance is unreasonable or unnecessary and present sufficient environmental planning grounds; certain standards are excluded from this flexibility (cl 4.6(2)-(3), (8)).
Limited rights of private covenant holders: cl 1.9A suspends covenants to the extent necessary to permit Plan‑consistent development, but not where the covenant is imposed by Council, or for certain Crown and conservation instruments (cl 1.9A(2)).
Procedural powers and conditions
The consent authority may impose conditions, including requiring registration of covenants to prevent “double dipping” in floor area calculations (cl 4.5(9)-(10)).
The Plan authorises the consent authority to refuse consent where mapped objectives/tests are not satisfied (e.g., cl 6.3(3), cl 6.5(3), cl 5.21(2)). The Plan also prescribes non‑refusal grounds (e.g. musical performance attributes under cl 5.20(1)) unless noise cannot be managed to an acceptable level (cl 5.20(2)).
Interplay of rights and duties produces behavioural incentives: applicants must design proposals to comply with mapped caps, provide specified evidence, and accept conditions or contributions; Council has discretion to require public benefits, heritage conservation and planning‑related covenants.
Penalties and enforcement
The Plan itself does not set new criminal offences or pecuniary penalty regimes within its text. Enforcement mechanisms are implicit and primarily rely on the statutory enforcement framework of the Environmental Planning and Assessment Act 1979 and related regulations (the Plan repeatedly frames requirements as conditions precedent to a grant of development consent, and as obligations on the consent authority). Concrete enforcement‑adjacent mechanisms within the Plan include:
Consent as gatekeeping. Many activities are prohibited unless consent is granted (e.g. subdivision cl 2.6, demolition cl 2.7, works within acid sulfate soils cl 6.1(2)). Refusal of consent prevents lawful development activity; carrying out development without required consent will engage the Act’s compliance and offence provisions (not reproduced in the Plan).
Conditions, covenants and registered instruments. The Plan explicitly contemplates conditions that require covenants to prevent the creation of equivalent floor area on other lots (cl 4.5(9)). Covenants registered on title are enforceable by subsequent owners and can be enforced through equitable and land law mechanisms alongside statutory compliance requirements.
Notification and consultation obligations as procedural preconditions. Failure to follow notification or to seek required approvals (for example, failing to notify Heritage Council where required under cl 5.10(7)) can lead to administrative invalidity or challenges to consent decisions.
Limits on refusing consent create a compliance environment requiring Councils to focus on demonstrable amenity or environmental risk rather than subjective objections (cl 5.20). This reduces the scope for refusals based on musical genre etc, but does not displace noise management obligations; the authority may still impose conditions or refuse where noise cannot be managed (cl 5.20(2)).
Because the Plan defers to the Act and SEPPs for offences and penalties, enforcement action (injunctions, penalty notices, orders for remediation, prosecution) would be pursued under those instruments rather than under this LEP text. For enforcement practitioners the salient operational levers in this instrument are the consent process, conditions (including covenants), and the requirement for specified technical plans and heritage documents. Those levers create compliance obligations whose breach will be actionable under the Act and its regulations.
How it interacts with other laws
The Plan is explicitly framed as part of an integrated regulatory matrix:
SEPPs and the Act. Clause 1.9(1) states the Plan is subject to any SEPP that prevails over it under s 3.28 of the Act. That means State policies can override local controls where a SEPP or State instrument applies. The Plan also repeatedly cross‑refers to statutory definitions and obligations in other Acts (Heritage Act 1977, Local Government Act 1993, Crown Land Management Act 2016, Rural Fires Act 1997, Fisheries Management Act 1994, Biodiversity Conservation Act 2016, Land Acquisition (Just Terms Compensation) Act 1991).
Crown rights and public authorities. Clause 1.9A(3) preserves the rights and interests of public authorities under registered instruments despite the suspension of private covenants in cl 1.9A(1). Clause 5.12(1) confirms the Plan does not restrict development permitted by or use of buildings of the Crown under State SEPPs for transport and infrastructure (SEPP Chapter 2) or similar State powers.
Local Government Act. The Plan engages the Local Government Act 1993 in several ways: classification and reclassification of public land (cl 5.2) is to be carried out “in accordance with Part 2 of Chapter 6” of that Act and the Plan notes Governor approval is required for discharging trusts when land is reclassified (cl 5.2(5) note). The Plan also uses the Local Government Act’s concepts of community land and public places in floor‑space calculations (cl 4.5(4)-(7)).
Heritage legislation. Heritage items and conservation areas are listed in Schedule 5; the Plan cross‑references the Heritage Act 1977 when excluding development on State Heritage Register land from exempt development (cl 3.1(3)(d)) and requires notification to the Heritage Council in certain archaeological or State heritage demolition cases (cl 5.10(7), (9)).
Fisheries and aquaculture regulation. Clause 5.19 cross‑refers to the Fisheries Management Act 1994 and associated aquaculture plans and regulations (including the Fisheries Management (Aquaculture) Regulation 2017) when regulating pond‑based, tank‑based and oyster aquaculture, and requires compliance with aquaculture industry development plans and the NSW Oyster Industry Sustainable Aquaculture Strategy (cl 5.19(5)-(6)).
Land acquisition law. Clause 5.1 identifies the “relevant acquisition authority” for particular reserved land types for owner‑initiated acquisition under the Land Acquisition (Just Terms Compensation) Act 1991 and sets rules about development on land acquired by a State authority (cl 5.1(2)-(3)).
Environmental management instruments. The Plan excludes exempt/compliant development from environmentally sensitive areas listed in cl 3.3; it also requires acid sulfate soils management in accordance with the Acid Sulfate Soils Manual (cl 6.1(3)) and references flood guidance documents (cl 5.21(4)-(5)).
Practical interactions and consequences:
Where a SEPP applies and prevails, the Plan cannot be used to refuse the SEPP‑enabled development (cl 1.9(1)).
The suspension of covenants (cl 1.9A) interacts with third‑party title obligations; it creates a statutory override in favour of Plan‑consistent development but preserves specified public and Crown instruments.
The Plan’s heritage, acid sulfate and flood controls introduce cross‑agency requirements (Heritage Council, Local Land Services, Rural Fires/Fire & Rescue) that applicants must meet in parallel with Council’s consent process.
All interactions are specified within the Plan; a practitioner must consult the cited Acts and SEPPs referenced in the relevant clauses for the complete compliance landscape.
Amendment history
The Plan’s text records amendments in‑line. Significant amendment notices and their clauses (as reproduced in the instrument) are:
Repeal and replacement history: cl 1.8 identifies that previous Burwood instruments, including the Burwood Planning Scheme Ordinance and Burwood Local Environmental Plan (Burwood Town Centre) 2010, are repealed in relation to the land covered by this Plan.
Savings and commencement amendments: cl 1.8A carries multiple amendment notes recording changes made in 2014 (2014 (763), cl 5), 2019 (2019 (621), Sch 5[1]) and 2021 (2021 (174), cl 4(1)). These amendments affect how pre‑commencement DAs are saved.
Zone list update: cl 2.1 is annotated as amended 2022 (828), Sch 1.6[1], indicating the zone list has been updated.
Floor space ratio and BHP amendments: cl 4.4 was noted as amended by 2026 (33), Sch 1[1]. Clause 4.3A was amended 2022 (511), Sch 1[1].
Exceptions to development standards amendments: cl 4.6 has amendment notes (2017 (630), Sch 1[5]; 2022 (511), Sch 1[2]-[4]).
Part 5 and other local provisions: multiple amendments are recorded throughout cl 5 and Part 6, including notable insertions , e.g. cl 5.9 (natural disaster repairs) inserted 2021 (302), Sch 1.3 and further amended 2022 (828), Sch 1.6[6]. Clause 5.8 (conversion of fire alarms) and 5.19 (aquaculture) show change references.
Part 6 local provisions: several site‑specific clauses were inserted by later amending instruments: cl 6.5 (design excellence) was inserted 2017 (630), Sch 1[6], with further amendments 2022 (828) Sch 1.6[4] and 2026 (33), Sch 1[2]-[5]; cl 6.6 (Cooper Street) inserted 2020 (11), Sch 1; cl 6.7 (Cheltenham Rd) inserted 2020 (780), Sch 1[1]; cl 6.8 (certain land at Burwood) inserted 2022 (511), Sch 1[6]; cl 6.9 and 6.10 (Croydon North Masterplan Precinct affordable housing and minimum site area) were inserted 2026 (33), Sch 1[6].
Schedules have been iteratively amended (Schedule 5 heritage shows a long list of amendment notes spanning 2015-2024).
The instrument records the amending instruments by year and identifier in the clause notes (e.g. "cl 1.8A: Am 2014 (763), cl 5; 2019 (621), Sch 5[1]; 2021 (174), cl 4(1)"). Those notes provide the textual amendment trail contained in the consolidated LEP as published. For precise legislative history, the practitioner should consult the NSW legislation website entries cited in the Plan notes for each amending instrument.
Litigation history
The text of the Plan, as provided, does not reference any judicial decisions or list litigation arising from its provisions. No cases are named or described in the instrument. Accordingly, the Plan does not itself record litigation outcomes or administrative appeals. Where parties seek to challenge decisions made under the Plan, appeals and judicial review would proceed under the Act and relevant administrative law and appeal mechanisms; the Plan contains the substantive controls that would have been the subject of such proceedings, but the instrument does not narrate any decisions.
For a practitioner seeking precedent on interpreting particular clauses (for example cl 4.6 on contravention of development standards, or cl 5.20 on refusal grounds relating to music), a search of the NSW Land and Environment Court and other appellate decisions should be undertaken separately because the LEP does not include case law or guidance. The Plan repeatedly cross‑refers to the Act and regulations, whose strategies for judicial review and appeal are the operative routes for litigation.
Gotchas
The Plan contains several detailed rules and exceptions that can create traps for the unwary applicant or adviser. Key “gotchas” drawn directly from the text are:
Savings and pre‑commencement DAs. Clause 1.8A(1) requires development applications made before commencement to be determined as if the Plan had not commenced. That preserves the previous instrument’s rules for those DAs. However, cl 1.8A(2)-(3) record further transitional complexity where later amendments are insulated from pending DAs. Practitioners must check the exact commencement and amendment dates and the DA lodgement date to know which instrument applies (cl 1.1AA; cl 1.8A).
Suspension of private covenants has limits. Clause 1.9A suspends covenants “to the extent necessary” to enable Plan‑consistent development, but excludes covenants imposed by Council and several Crown and conservation instruments (cl 1.9A(1)-(2)). Public authority rights under registered instruments are preserved (cl 1.9A(3)). Do not assume all covenants are statutorily swept aside.
Exempt/compliant exclusions for environmentally sensitive land. Schedule 2 and Part 3 allow exempt/complying development but cl 3.3 forbids exempt or complying development in a defined list of environmentally sensitive areas (cl 3.3(1)-(2)), including coastal waters, wetlands of international significance, land of high Aboriginal or biodiversity significance and areas within 100 metres of some of those areas. Applicants must check those spatial exclusions against the maps.
Floor space and “double dipping” complications. Clause 4.5 contains detailed rules for site area and gross floor area calculation, strata overlaps, exclusions for community land, and a mechanism by which the consent authority can require a covenant to prevent equivalent floor area being created on another lot (cl 4.5(3)-(11)). Failure to understand what land counts in site area, or to ensure covenants are registered when required, can lead to incorrect FSR calculations and challengeable consents.
Development standard contravention procedure is procedural and record‑keeping critical. Clause 4.6 permits consenting authorities to allow contraventions of development standards where environmental planning grounds justify it, but requires the applicant to demonstrate the matters in cl 4.6(3) and requires the authority to keep a record of its assessment (cl 4.6(3)-(4)). The EP&A Regulation requires a supporting document for such contraventions; absent or deficient documentation can invalidate the exercise of discretion.
Exclusions from the “exceptions” clause. Clause 4.6(8) lists development standards that cannot be contravened under that clause (including development standards for complying development, BASIX commitments, cl 5.4, cl 5.5, cl 4.3A(2) (BHP), and cl 4.4A(5)-(7)). Particular mapped and sustainability commitments cannot be bypassed by the 4.6 route.
Music and licensing protections are not absolute. Clause 5.20 prevents the consent authority from refusing consent to licensed premises on certain grounds related to music and performance characteristics (cl 5.20(1)) and prohibits refusal on the grounds of music noise if the consent authority is satisfied noise may be managed to an acceptable level (cl 5.20(2)). However, the clause leaves open conditions, noise management obligations, and refusal where noise cannot be managed. Applicants must prepare robust noise management evidence when proposing venues.
Heritage procedures and documentary triggers. The Plan allows the consent authority to require a heritage management document or heritage conservation management plan (cl 5.10(5)-(6)). It also requires notification to the Heritage Council in many archaeological and State‑heritage demolition situations (cl 5.10(7), (9)). Failure to follow these procedural steps can lead to invalid consents or later heritage obligations.
Site‑specific and precinct tests: active street frontages, design excellence, Croydon North contributions. Clauses 6.3 and 6.5 require specific outcomes (active ground floor uses; demonstration of “design excellence” for qualifying buildings). Croydon North precinct clauses 6.9-6.10 impose a 2% affordable housing contribution option and a minimum site area of 1,500m2 for certain housing types. Applicants in these areas must factor these specific obligations into feasibility and design.
Acid sulfate soils procedural cost. Clause 6.1 requires acid sulfate soils management plans for works in mapped classes and allows limited exemptions where a preliminary assessment shows no plan required, but the assessment must be provided and confirmed in writing (cl 6.1(2)-(4)). This can add technical cost and delay.
Temporary uses limited to 52 days per year. Clause 2.8 allows temporary uses for up to 52 days in any 12‑month period subject to the consent authority being satisfied about impacts and restoration (cl 2.8(2)-(3)). Sales offices for new release areas are excepted (cl 2.8(4)-(5)). Operators must timetable temporary activities accordingly.
Mapped anomalies and the need to consult maps. Many operative thresholds are map‑based (height, FSR, lot size, active street frontages, land reservation acquisition). The Plan repeatedly tells users to consult the specific maps and notes that maps may be amended (cl 1.7(1)-(2)). Practitioners should treat the LEP text and the official maps as a single instrument.
How to comply
A practical compliance checklist and workflow, grounded in the Plan’s clauses, for applicants and advisers:
Identify the applicable zoning and maps
Check the Land Zoning Map, Height of Buildings Map, Floor Space Ratio Map, Lot Size Map, Heritage Map, Active Street Frontages Map, Acid Sulfate Soils Map and the Land Reservation Acquisition Map referred to in the Plan (cls 2.2, 4.3, 4.4, 4.5, 1.7). The Plan’s requirements are map‑specific.
Determine whether the development is exempt, complying, permitted with consent or prohibited
Use the Land Use Table (cl 2.3 and the Land Use Table entries) and Schedules 2-3. If the proposed work is within Schedule 2 and meets the technical standards, it may be exempt (cl 3.1). If it matches Schedule 3 complying development types and conditions, a complying development certificate may be obtained (cl 3.2).
Check environmentally sensitive area exclusions
If the site lies within any area listed at cl 3.3(2) (coastal waters, Ramsar wetlands, Aboriginal cultural significance, etc.) exempt or complying development may be forbidden. Do not rely on exempt/compliant pathways without checking cl 3.3.
Confirm floor space ratio, site area and height compliance and calculation rules
Apply cl 4.5 rules for site area and the definition of FSR (cl 4.5(2)-(7)). Consider exclusions from gross floor area (cl 4.4(2A)). If land comprises multiple lots, check the overlapping strata rules and whether covenants preventing “double dipping” might be imposed (cl 4.5(5), (9)-(10)).
If proposing a contravention of a development standard, prepare the required justification
For a proposed contravention, prepare the statutory “unreasonable or unnecessary” and environmental planning grounds material required by cl 4.6(3) and the EP&A Regulation. Keep in mind the consent authority must record its assessment (cl 4.6(4)). Some standards cannot be contravened under cl 4.6(8).
Heritage, Aboriginal and archaeological considerations
If the site contains a heritage item or is in a heritage conservation area (Schedule 5 and the Heritage Map), expect to prepare heritage management documents and possibly a heritage conservation management plan; compliance with cl 5.10(4)-(6) is required. Notify and consult the Heritage Council or Aboriginal communities where the clause requires (cl 5.10(7)-(9)).
Acid sulfate soils, flooding and bush fire
If the site appears on the Acid Sulfate Soils Map, prepare an acid sulfate soils management plan per cl 6.1(2)-(4) or a preliminary assessment verified in writing by the consent authority. For flood planning, ensure proposals meet cl 5.21 tests on compatibility with flood function, evacuation and environmental impacts; consult the Considering Flooding in Land Use Planning Guideline and Flood Risk Management Manual as referenced (cl 5.21(4)-(5)). For bush fire prone land, note the Plan allows authorised bush fire hazard reduction work without consent (cl 5.11) but other development may engage separate requirements.
Site‑specific and precinct requirements
For areas labelled “Active street frontage” apply cl 6.3: ground floor frontages must be business or retail uses unless exempted for entrances, service access or vehicular access (cl 6.3(3)-(5)). For sites captured by cl 6.8 (Burwood certain land), cl 6.6 (Cooper Street) or cl 6.7 (Cheltenham Rd), ensure setbacks, heights, basement limits and frontage widths meet the specified tests. For the Croydon North Masterplan Precinct, factor in potential 2% affordable housing contribution or equivalent dedication (cl 6.9(5)-(7)) and the minimum 1,500m2 site area for qualifying developments (cl 6.10(2)).
Noise and live entertainment considerations for licensed premises
If proposing licensed premises, note cl 5.20: Council cannot refuse consent on the grounds listed (genre, live vs amplified, presence of dance floor, stage orientation, decorative features) if noise can be managed (cl 5.20(1)-(2)). Prepare a noise management plan and evidence showing how noise will be managed to acceptable levels.
Use of covenants and conditions
Expect the consent authority to impose covenants to prevent “double dipping” in FSR where the site comprises multiple lots (cl 4.5(9)-(10)). Be prepared to accept registration of easements or covenants as development conditions.
Procedural and timing considerations
For conversions of fire alarms, be aware that although the conversion requires consent, some such conversions are complying development with specific carrying‑out conditions and timing restrictions for building works (cl 5.8). For temporary uses the standard cap is 52 days in any 12 months (cl 2.8(2)).
Cross‑check SEPPs and the Act
The Plan is subject to SEPPs (cl 1.9(1)). Confirm whether any SEPP or overlapping State control affects the proposal (for example, SEPP (Housing) 2021 or SEPPs on infrastructure). Also confirm relevant building code (BCA) compliance requirements referenced in cl 3.1(3)-(4) and cl 3.2(3)(b).
Prepare high‑quality technical documentation where required
Acid sulfate soils management plans (cl 6.1(3)), heritage management documents (cl 5.10(5)-(6)), flood and evacuation modelling (cl 5.21(3)), noise management documentation for entertainment premises (cl 5.20(2)) and contravention justifications (cl 4.6(3)) should be prepared by qualified professionals and aligned with the guidelines and manuals referenced in the Plan.
Keep contemporaneous records of the consent authority’s assessments
The consent authority must keep records when using cl 4.6 to approve departures (cl 4.6(4)); applicants should ensure the DA file contains clear, auditable documentary bases for decisions reached.
If in doubt, practitioners should obtain a property‑specific pre‑DA advice meeting with Council, confirm relevant map layer extents on the Planning Portal (the Plan repeatedly points to online maps, cl 1.7 note), and verify any recent amendments recorded in the explanatory notes and amending instruments before lodging applications.
The consent authority for the purposes of this Plan is (subject to the Act) the Council.
1 Maps
1 Maps
1.7 Maps
(1) A reference in this Plan to a named map adopted by this Plan is a reference to a map by that name—
(a) approved by the local plan-making authority when the map is adopted, and
(b) as amended or replaced from time to time by maps declared by environmental planning instruments to amend or replace that map, and approved by the local plan-making authority when the instruments are made.
(1AA) (Repealed)
(2) Any 2 or more named maps may be combined into a single map. In that case, a reference in this Plan to any such named map is a reference to the relevant part or aspect of the single map.
(3) Any such maps are to be kept and made available for public access in accordance with arrangements approved by the Minister.
(4) For the purposes of this Plan, a map may be in, and may be kept and made available in, electronic or paper form, or both.
Note.
The maps adopted by this Plan are to be made available on the NSW Planning Portal. Requirements relating to the maps are set out in the documents entitled Standard technical requirements for LEP maps and Standard requirements for LEP GIS data which are available on the website of the Department of Planning and Environment.
1 Repeal of planning instruments applying to land
1 Repeal of planning instruments applying to land
1.8 Repeal of planning instruments applying to land
(1) All local environmental plans and deemed environmental planning instruments applying only to the land to which this Plan applies are repealed.
Note.
The following local environmental plans are repealed under this provision—
Burwood Planning Scheme Ordinance
Burwood Local Environmental Plan (Burwood Town Centre) 2010
(2) All local environmental plans and deemed environmental planning instruments applying to the land to which this Plan applies and to other land cease to apply to the land to which this Plan applies.
1 Savings provision relating to development applications
1 Savings provision relating to development applications
1.8A Savings provision relating to development applications
(1) If a development application has been made before the commencement of this Plan in relation to land to which this Plan applies and the application has not been finally determined before that commencement, the application must be determined as if this Plan had not commenced.
Note.
However, under Division 3.5 of the Act, a development application may be made for consent to carry out development that may only be carried out if the environmental planning instrument applying to the relevant development is appropriately amended or if a new instrument, including an appropriate principal environmental planning instrument, is made, and the consent authority may consider the application. The Division requires public notice of the development application and the draft environmental planning instrument allowing the development at the same time, or as closely together as is practicable.
(2) A development application made (but not finally determined) before the commencement of Burwood Local Environmental Plan 2012 (Amendment No 5) for development on land to which that Plan applies is to be determined as if that Plan had not been made.
(3) An amendment made to this Plan by Burwood Local Environmental Plan 2012 (Amendment No 17) does not apply to a development application made but not finally determined before the commencement of the amendment.
(1) This Plan is subject to the provisions of any State environmental planning policy that prevails over this Plan as provided by section 3.28 of the Act.
(2) The following State environmental planning policies (or provisions) do not apply to the land to which this Plan applies—
1 Suspension of covenants, agreements and instruments
1 Suspension of covenants, agreements and instruments
1.9A Suspension of covenants, agreements and instruments
(1) For the purpose of enabling development on land in any zone to be carried out in accordance with this Plan or with a consent granted under the Act, any agreement, covenant or other similar instrument that restricts the carrying out of that development does not apply to the extent necessary to serve that purpose.
(2) This clause does not apply—
(a) to a covenant imposed by the Council or that the Council requires to be imposed, or
(b) to any relevant instrument within the meaning of section 13.4 of the Crown Land Management Act 2016, or
(c) to any conservation agreement within the meaning of the National Parks and Wildlife Act 1974, or
(d) to any Trust agreement within the meaning of the Nature Conservation Trust Act 2001, or
(e) to any property vegetation plan within the meaning of the Native Vegetation Act 2003, or
(f) to any biobanking agreement within the meaning of Part 7A of the Threatened Species Conservation Act 1995, or
(g) to any planning agreement within the meaning of Subdivision 2 of Division 7.1 of the Act.
(3) This clause does not affect the rights or interests of any public authority under any registered instrument.
(4) Under section 3.16 of the Act, the Governor, before the making of this clause, approved of subclauses (1)–(3).
cl 1.9A: Am 2019 (621), Sch 5[2]–[4].
Part 2 Permitted or prohibited development
Part 2 Permitted or prohibited development
Part 2 Permitted or prohibited development
2 Land use zones
2 Land use zones
2.1 Land use zones
The land use zones under this Plan are as follows—
Residential Zones
R1 General Residential
R2 Low Density Residential
R3 Medium Density Residential
Employment Zones
E1 Local Centre
E3 Productivity Support
Mixed Use Zones
MU1 Mixed Use
Special Purpose Zones
SP2 Infrastructure
Recreation Zones
RE1 Public Recreation
RE2 Private Recreation
cl 2.1: Am 2022 (828), Sch 1.6[1].
2 Zoning of land to which Plan applies
2 Zoning of land to which Plan applies
2.2 Zoning of land to which Plan applies
For the purposes of this Plan, land is within the zones shown on the Land Zoning Map.
2 Zone objectives and Land Use Table
2 Zone objectives and Land Use Table
2.3 Zone objectives and Land Use Table
(1) The Land Use Table at the end of this Part specifies for each zone—
(a) the objectives for development, and
(b) development that may be carried out without development consent, and
(c) development that may be carried out only with development consent, and
(d) development that is prohibited.
(2) The consent authority must have regard to the objectives for development in a zone when determining a development application in respect of land within the zone.
(3) In the Land Use Table at the end of this Part—
(a) a reference to a type of building or other thing is a reference to development for the purposes of that type of building or other thing, and
(b) a reference to a type of building or other thing does not include (despite any definition in this Plan) a reference to a type of building or other thing referred to separately in the Land Use Table in relation to the same zone.
(4) This clause is subject to the other provisions of this Plan.
Notes.
2
1
Schedule 1 sets out additional permitted uses for particular land.
2
2
Schedule 2 sets out exempt development (which is generally exempt from both Parts 4 and 5 of the Act). Development in the land use table that may be carried out without consent is nevertheless subject to the environmental assessment and approval requirements of Part 5 of the Act.
2
3
Schedule 3 sets out complying development (for which a complying development certificate may be issued as an alternative to obtaining development consent).
2
4
Clause 2.6 requires consent for subdivision of land.
2
5
Part 5 contains other provisions which require consent for particular development.
2 Unzoned land
2 Unzoned land
2.4 Unzoned land
(1) Development may be carried out on unzoned land only with development consent.
(2) In deciding whether to grant development consent, the consent authority—
(a) must consider whether the development will impact on adjoining zoned land and, if so, consider the objectives for development in the zones of the adjoining land, and
(b) must be satisfied that the development is appropriate and is compatible with permissible land uses in any such adjoining land.
2 Additional permitted uses for particular land
2 Additional permitted uses for particular land
2.5 Additional permitted uses for particular land
(1) Development on particular land that is described or referred to in Schedule 1 may be carried out—
(a) with development consent, or
(b) if the Schedule so provides—without development consent,
in accordance with the conditions (if any) specified in that Schedule in relation to that development.
(2) This clause has effect despite anything to the contrary in the Land Use Table or other provision of this Plan.
2 Subdivision—consent requirements
2 Subdivision—consent requirements
2.6 Subdivision—consent requirements
(1) Land to which this Plan applies may be subdivided, but only with development consent.
Notes.
(2) Development consent must not be granted for the subdivision of land on which a secondary dwelling is situated if the subdivision would result in the principal dwelling and the secondary dwelling being situated on separate lots, unless the resulting lots are not less than the minimum size shown on the Lot Size Map in relation to that land.
Note.
The definition of secondary dwelling in the Dictionary requires the dwelling to be on the same lot of land as the principal dwelling.
2
1
If a subdivision is specified as exempt development in an applicable environmental planning instrument, such as this Plan or State Environmental Planning Policy (Exempt and Complying Development Codes) 2008, the Act enables it to be carried out without development consent.
2
2
Part 6 of State Environmental Planning Policy (Exempt and Complying Development Codes) 2008 provides that the strata subdivision of a building in certain circumstances is complying development.
2 Demolition requires development consent
2 Demolition requires development consent
2.7 Demolition requires development consent
The demolition of a building or work may be carried out only with development consent.
Note.
If the demolition of a building or work is identified in an applicable environmental planning instrument, such as this Plan or State Environmental Planning Policy (Exempt and Complying Development Codes) 2008, as exempt development, the Act enables it to be carried out without development consent.
2 Temporary use of land
2 Temporary use of land
2.8 Temporary use of land
(1) The objective of this clause is to provide for the temporary use of land if the use does not compromise future development of the land, or have detrimental economic, social, amenity or environmental effects on the land.
(2) Despite any other provision of this Plan, development consent may be granted for development on land in any zone for a temporary use for a maximum period of 52 days (whether or not consecutive days) in any period of 12 months.
(3) Development consent must not be granted unless the consent authority is satisfied that—
(a) the temporary use will not prejudice the subsequent carrying out of development on the land in accordance with this Plan and any other applicable environmental planning instrument, and
(b) the temporary use will not adversely impact on any adjoining land or the amenity of the neighbourhood, and
(c) the temporary use and location of any structures related to the use will not adversely impact on environmental attributes or features of the land, or increase the risk of natural hazards that may affect the land, and
(d) at the end of the temporary use period the land will, as far as is practicable, be restored to the condition in which it was before the commencement of the use.
(4) Despite subclause (2), the temporary use of a dwelling as a sales office for a new release area or a new housing estate may exceed the maximum number of days specified in that subclause.
(5) Subclause (3)(d) does not apply to the temporary use of a dwelling as a sales office mentioned in subclause (4).
2 Canal estate development prohibited
2 Canal estate development prohibited
2.9 Canal estate development prohibited
(1) Canal estate development is prohibited on land to which this Plan applies.
(2) In this Plan, canal estate development mea
This is an opening excerpt, not the complete document.