Zoning and mapped controls. The Plan is structured around conventional zoning and map‑based controls. It defines a set of zones (cl 2.1) and places land within those zones via the Land Zoning Map (cl 2.2). Mapped instruments used by the Plan include the Land Application Map, Land Zoning Map, Lot Size Map, Heritage Map, Terrestrial Biodiversity Map, Watercourse Map, Wetlands Map and Groundwater Vulnerability Map (see cl 1.7 and the numerous clause references to maps). The maps are an operative part of the Plan and are to be kept available for public access (cl 1.7(3)). Users must read the relevant map layers to determine which clauses and schedules apply to a given parcel.
Permissibility and consent. The Land Use Table (cl 2.3 and the table material under Part 2) divides activity in each zone into three classes: development that may be carried out without development consent, development that may be carried out only with development consent, and prohibited development. Clause 2.3 requires the consent authority to have regard to the objectives for development in a zone when determining applications. Where the Land Use Table is silent, Schedule 1 can authorise additional uses on particular sites (cl 2.5).
Exempt and complying development, and environmentally sensitive exclusions. Part 3 defines the local application of exempt and complying development categories. Schedule 2 identifies exempt development (cl 3.1) and Schedule 3 identifies local complying development (cl 3.2). Importantly, exempt or complying development cannot be carried out on land that the Plan identifies as an “environmentally sensitive area for exempt or complying development” (cl 3.3). The Plan also requires Building Code compliance and, where applicable, other approvals and permits (cl 3.1).
Development standards and flexibility. Part 4 sets principal development standards that govern subdivision lot sizes and related matters (cl 4.1 and related clauses). Clause 4.6 provides the local mechanism allowing the consent authority to grant consent for development that contravenes a development standard, subject to documented justification by the applicant and a recorded assessment by the consent authority. Subclause 4.6(6) however prohibits use of that exception to permit certain post‑subdivision outcomes in specified zones (for example, preventing the consent route that would result in two or more lots under the minimum area in several rural and conservation zones).
Heritage and environmental overlay controls. The Plan contains specific heritage controls, lists heritage items in Schedule 5 and requires consent for demolition and many works affecting heritage items and areas (cl 5.10). Environmental overlay provisions appear through terrestrial biodiversity (cl 6.3), riparian land and watercourses (cl 6.4), wetlands (cl 6.5) and groundwater vulnerability (cl 6.6) controls, each of which requires the consent authority to consider specified environmental outcomes and to be satisfied about design, siting and management to avoid, minimise or mitigate adverse impacts.
Targeted business and land‑use controls. Clause 5.4 sets local quantitative limits on a range of uses: bed and breakfast (no more than five bedrooms), home business and home industry floor area caps (100 square metres), industrial retail outlet retail limit (40 per cent of GFA or 400 m2), kiosk and shop floor areas (30 m2 and 200 m2 respectively), and a neighbourhood supermarket cap at 1,000 m2 (cl 5.4(1)-(7AA)). These are local format controls that channel the scale and nature of commercial activities.
Special purpose and procedural provisions. The Plan contains discrete rules and processes for particular local circumstances: temporary uses up to 52 days per year (cl 2.8); prohibition on canal estate development (cl 2.9); provisions for rural worker dwellings (cl 4.2B) and farm stay/farm gate development (cls 5.24-5.25); consultation requirements where development may affect airport surfaces (cl 6.8); limitations on refusing licensed premises applications on the basis of certain music and performance attributes (cl 5.20); and requirements about essential services being available as a precondition to consent (cl 6.1).
Interaction with State policy and other Acts. The Plan is expressly subject to State environmental planning policies that prevail under the Act (cl 1.9). It cross‑references other regimes, for example the Building Code of Australia requirements for exempt and complying development (cl 3.1), aquaculture plans and fisheries strategy (cl 5.19), and provisions under the Heritage Act and Crown land management laws (cl 5.10; cl 1.9A). The Plan also includes a suspension mechanism for private covenants to the extent required to enable development in accordance with the Plan, with stated exclusions (cl 1.9A).
Records, consultation and documentary burdens. Several clauses allow the consent authority to require specific technical or documentary material (heritage management documents, heritage conservation management plans, environmental impact statements, statements of environmental effects) and require that the consent authority keep records of assessments (cl 4.6(4); cl 5.10(5)-(6); cl 5.18(3)). These create compliance costs for applicants and administrative duties for the Council.