The AD provides a narrow, concrete compliance route; implementing it requires a sequence of steps that combine technical identification, procurement, maintenance execution, and record-keeping. The AD itself prescribes compliance "in accordance with Caledonian Airborne Systems Service Bulletin No.CPT-600/900/SB-01 Issue 1 dated February 2006 or later EASA approved revision" and sets the timeframe "within six months after the effective date of this Directive" (Requirement; Compliance). The effective date is 26 October 2006, so the prescribed compliance period ends six months later.
Practical compliance steps grounded in the AD text:
-
Inventory and identify affected units:
- Search maintenance and parts records for all installations of CPT-600 and CPT-900 ADELT and AD/AFELT units in the operator’s fleet.
- Identify installed main case part numbers (BC85-051) and piston part numbers (BC85-052).
- Check serial numbers against the cohorts identified in the background: main cases up to S/N 311 and pistons up to S/N 299 were made from the older materials and are specifically implicated (Background).
- Do not rely solely on aircraft type; the AD lists known installations across specific models but states the list is not exhaustive (Note 1). Verify actual fitment.
-
Obtain the service bulletin and confirm revision status:
- Obtain Caledonian Airborne Systems Service Bulletin No.CPT-600/900/SB-01 Issue 1 dated February 2006.
- Check whether any later revisions to the service bulletin exist and whether they are EASA-approved. The AD accepts Issue 1 or any later EASA-approved revision as the method of compliance (Requirement; Note 3).
- Ensure the specific procedures, part numbers for replacement parts and installation instructions in the service bulletin are followed.
-
Procure approved replacement parts:
- Source main case and piston parts manufactured from stainless steel 6S80D, as required by the AD (Requirement).
- Confirm that the replacement parts conform to the service bulletin specifications and material standard (6S80D). The background emphasises that 6S80D has "three times the hardness" compared with earlier AISI 303 parts (Background), which is the technical rationale for the replacement.
-
Schedule and execute maintenance:
- Plan maintenance windows to perform the replacement within the six-month compliance window that began on 26 October 2006 (Compliance). If multiple aircraft or multiple units are affected, schedule to avoid unacceptable operational disruption.
- Execute the replacement in accordance with the service bulletin instructions and applicable maintenance standards.
- Ensure that licensed maintenance personnel or an appropriately approved maintenance organisation perform the work.
-
Post-work inspection and functional testing:
- After replacement, perform required tests specified in the service bulletin to verify correct installation and function of the ADELT/AD/AFELT system.
- Record the outcome of any functional tests and corrective actions taken.
-
Record-keeping and demonstration of compliance:
- Record the replaced parts by part number and serial number, the service bulletin revision used, date of replacement, maintenance organisation and certifying engineer, and results of any functional tests.
- Retain these records in the aircraft’s maintenance log and the organisation’s continuing airworthiness records to demonstrate compliance with the AD.
-
Communicate with regulator or continuing airworthiness manager as required:
- While the AD itself does not specify reporting requirements, operators should be prepared to present records of compliance to the regulator or to their continuing airworthiness authority upon request.
- If an operator seeks an alternative method of compliance or an extension of the compliance deadline, they must pursue standard regulatory channels outside the AD text to obtain authorisation; the AD itself does not provide an alternative compliance path.
-
For military operators:
- The AD lists military aircraft types on which the systems are known to be installed (Note 2). Military organisations should confirm applicability with their airworthiness authorities and ensure any internal processes align with the AD or with equivalent military continuing airworthiness directives.
-
Contingency planning for parts availability:
- Given the AD’s reliance on parts made from 6S80D, operators should assess supplier lead times and plan earlier procurement where fleet sizes are large, to avoid missing the compliance window.
-
Monitor for later EASA-approved revisions:
- Because the AD accepts later EASA-approved revisions of the service bulletin, monitor EASA communications for any approved revisions that might modify or clarify installation instructions and use the latest EASA-approved revision as the method of compliance if applicable.
Compliance deadline calculation (from the AD text):
- Effective date: 26 October 2006 (Compliance).
- Required completion: within six months after that date, i.e. by 26 April 2007. Ensure that the work is completed and recorded on or before that date to meet the AD’s timing requirement.
Overall, the AD prescribes a single, specific remedial action and references a manufacturer service bulletin and EASA approval as the acceptance standard. Operators and maintenance organisations should treat the AD as a mandatory technical directive, follow the specified service bulletin, document actions rigorously, and liaise with the regulator where questions of alternative compliance, parts shortages, or other complications arise.