AD/P68/5 - Circuit Breaker Installation - Inspection
1AD/P68/5 - Circuit Breaker Installation - Inspection
Start here
Get a plain-English read of 1
Turn the raw legal text into a practical explanation grounded in AD/P68/5 - Circuit Breaker Installation - Inspection.
meta-content-style-type: text/css meta-content-type: application/xhtml+xml; charset=utf-8 meta-generator: Aspose.Words for .NET 22.10.0
?xml version="1.0" encoding="utf-8" standalone="no"?>
COMMONWEALTH OF AUSTRALIA (Civil Aviation Regulations 1998), PART 39 - 105 CIVIL AVIATION SAFETY AUTHORITY
SCHEDULE OF AIRWORTHINESS DIRECTIVES
Image unavailable in extracted text Partenavia P68 Series Aeroplanes
AD/P68/5 Circuit Breaker Installation - Inspection 5/77
Applicability: All models.
Requirement: 1. Carry out electrical checks to ensure that the 50 Amp Circuit Breaker identified as “BATTERY” does disconnect the battery from the bus.
2. Carry out electrical checks to ensure that the 50 Amp Circuit Breakers identified as “LH ALTERNATOR” and “RH ALTERNATOR” do disconnect the correct alternators.
3. Rectify as necessary.
Compliance: Within 100 hours time in service after 31 May 1977.