CTHIn ForceLegislation
AD/LTS/13 Amdt 1 Improved Power Turbine Retention
© 2026 Zoe. All rights reserved.
Zoe is a legal information platform. Always consult the Federal Register of Legislation for authoritative text.
AD/LTS/13 Amdt 1 Improved Power Turbine Retention
Start here
Turn the raw legal text into a practical explanation grounded in AD/LTS/13 Amdt 1 Improved Power Turbine Retention.
| AD/LTS/13 Amdt 1 | Improved Power Turbine Retention | 16/2021 |
|---|
| Applicability: | Honeywell International (formerly AlliedSignal and Textron Lycoming) LTS101‑650B1, -750B1, -650C and -750C model turboshaft engines. |
|---|---|
| Requirement: | 1. To prevent a power turbine overspeed and an uncontained engine failure, install an improved power turbine retention system and improved power turbine rotor assembly in accordance with the following Honeywell International Service Bulletins (SBs):(a) LTS 101B-72-50-0122 Revision 4 as in force on the commencement date of this AD, or(b) LTS 101B-72-50-0116 Revision 6 as in force on the commencement date of this AD, or(c) LTS 101C-72-50-0119 Revision 2 as in force on the commencement date of this AD, as applicable, and2. Install an improved electronic power turbine rotor overspeed controller in accordance with the following Honeywell International SBs:(a) LTS 101B-73-10-0127 Revision 2 as in force on the commencement date of this AD, or(b) LTS 101C-73-10-0129 Revision 3 as in force on the commencement date of this AD, as applicable.Note 1: United States of America Federal Aviation Administration (FAA) AD 95‑26‑01 is the basis for this AD.Note 2: CASA Airworthiness Directives AD/JBK 117/9, AD/GBK 117/7 and AD/BELL 222/19, as in force from time to time, address the airframe wiring requirements for the installation of an electronic power turbine overspeed controller. |
| Compliance: | Requirement 1. Before further flight after the commencement date of this AD, unless accomplished previously.Requirement 2. Concurrent with Airworthiness Directives AD/JBK 117/9, AD/GBK 117/7 and AD/BELL 222/19, as applicable, but before further flight after the commencement date of this AD, unless accomplished previously. |
| This AD commences on 20 August 2021. |
| Background: | This Directive has been issued to require the installation of an improved power turbine rotor and an improved power turbine rotor overspeed controller. The requirements address reports of uncontained power turbine failure events.Amendment 1 removes obsolete references and makes minor editorial changes to reflect current requirements. |
|---|
Text Description automatically generated
David Punshon
Delegate of the Civil Aviation Safety Authority
6 August 2021