Complying with this AD requires a sequence of administrative, logistical and technical steps anchored to the specified documents. The AD sets two explicit requirements and conditions for alternative compliance methods; steps below follow directly from the AD text.
Step 1 , Determine applicability. Obtain Bombardier Service Bulletin 35/36-28-11 Revision 4 dated 4 December 2000 and confirm whether the specific airframe(s) are "identified in" that SB. The AD's Applicability clause makes the SB the definitive list generator: only aircraft identified in SB Revision 4 fall under the AD as written. Document the applicability determination for each aircraft.
Step 2 , Plan and schedule the hardware modification. If the aircraft is applicable, plan to "Modify the left- and right-hand standby fuel pump switches, in accordance with the Accomplishment Instructions of SB 35/36-28-11 Revision 4" (Requirement 1). Schedule the work within the compliance window: "Within 24 months after the effective date of this Directive." Because the AD effective date is 12 April 2007, ensure completion by the 24-month deadline calculated from that date. Use qualified maintenance personnel and follow the SB's Accomplishment Instructions precisely. Retain maintenance records showing the work was performed in accordance with the SB.
Step 3 , Confirm acceptable alternative compliance if not using SB Revision 4. If you intend to use a later revision of the referenced SB, verify that the later revision has been "approved by the United States Federal Aviation Administration (FAA) as an Alternate Method of Compliance (AMOC) to FAA AD 2007-04-18." Only FAA-AMOC-approved later SB revisions are considered acceptable for compliance with this AD. Obtain and retain the FAA AMOC approval documentation and a clear statement that the later SB revision is an AMOC to FAA AD 2007-04-18.
Step 4 , Update the AFM before returning to flight. The AD requires that you "Revise the Emergency and Abnormal Procedures sections of the applicable Learjet Aircraft Flight Manual (AFM) ... by including the information in the applicable Learjet Temporary Flight Manual (TFM) changes identified below" (Requirement 2). The AD sets TFM 96-08 and TFM 96-09 (both dated 30 May 1996) as the required inserts, and lists the applicable AFM identifiers (35/36 (FM-019), 35A/36A FC-200 (FM-102), 35A/36A FC-530 (FM-108)). Insert the TFM pages into the AFM or, if a general AFM revision contains identical relevant information, insert that general revision. Critically, this AFM revision must be completed "Before further flight after accomplishing the Requirement 1 modification." Do not return the aeroplane to flight after the modification until the AFM change is in place.
Step 5 , Document the AFM change and the insertion method. Keep copies of the TFM changes inserted or copies of the general AFM revision used, and document where they were inserted. If you relied on a general AFM revision replacing the TFM insert, explicitly document that "the relevant information in the general revisions is identical to that in the TFM changes," as the AD requires identity of relevant information.
Step 6 , Retain linkage to the SB and AD. Maintain records linking the modification work to the SB Accomplishment Instructions or the FAA-AMOC-approved later SB revision, and link the AFM change to the TFM pages or identical AFM revision. This documentation will be the primary evidence of compliance when reviewed by CASA or other regulators.
Step 7 , Check cross-jurisdictional approvals if operating internationally. Because the AD accepts later SB revisions only when the FAA has approved them as AMOCs to FAA AD 2007-04-18, operators with multi-jurisdictional operations or maintenance performed in other countries must confirm FAA AMOC approvals and ensure CASA acceptance of the FAA-AMOC pathway is documented.
Step 8 , Train crew on updated procedures. Once the AFM Emergency and Abnormal Procedures contain the TFM text or an identical general AFM revision, ensure flight crews are briefed and trained on the updated procedures addressing the possibility that the standby fuel pump will not shut off. The AD's Requirement 2 exists to ensure crews have the correct procedural guidance in this specific failure mode.
Step 9 , Retain effective date and compliance timing. The AD became effective 12 April 2007; Requirement 1 must be done within 24 months after that date. If compliance is questioned, be prepared to show evidence of the date the modification was completed and the date the AFM was updated. The AFM update must be completed prior to first flight after the modification.
Step 10 , Maintain readiness to show FAA AMOC documentation when used. If a later SB revision is relied upon, retain the FAA AMOC approval documentation that ties that SB revision to FAA AD 2007-04-18. The AD's acceptance of later SB revisions is explicitly conditioned upon that FAA AMOC approval.
Following these steps aligns an operator with the AD's explicit requirements: modification as per the SB's Accomplishment Instructions, AFM Emergency and Abnormal Procedures updated by the specified TFM changes (or identical general AFM revisions), and adherence to the time limits in the AD. Keep maintenance release paperwork, AFM revision logs, and any FAA AMOC approvals as the documentary trail required to demonstrate compliance.