The AD establishes a short, concrete compliance pathway; implementation requires both immediate operational steps and co-ordination with authorised technical service providers.
Immediate operator actions:
- Consult the referenced ASB: Obtain paragraph 2.B of BAE Systems (Operations) Limited Alert Service Bulletin 32-A-JA090640 Revision 2, or any later EASA-approved revision, and verify whether any radius rod(s) installed on each Jetstream Series 3100 and 3200 aircraft are listed by serial number in that paragraph (Requirement). Because Amendment 1 introduces Revision 2 to add serial numbers (Background), ensure the version consulted is at least Revision 2 or later EASA-approved revision.
- Inspect and identify serial numbers: Physically inspect each aircraft’s main landing gear radius rods to confirm the serial numbers. The AD makes identification by serial number the trigger for remedial action (Requirement).
Corrective actions where an affected radius rod is found:
3. Replace before further flight: If a listed serial-numbered radius rod is found installed, replace it with a serviceable unit before further flight after 14 August 2009 (Requirement; Compliance). Plan for aircraft downtime and parts logistics accordingly.
4. Source a serviceable unit: Ensure the replacement radius rod is not one of the serial numbers listed in the ASB, or, if it is, ensure it has been processed per steps below.
Processing an affected radius rod for re-installation:
5. Send to authorised overhaul agency: If an operator wishes to return an identified radius rod to service rather than replace it with a non-affected unit, send the part to an “authorised overhaul agency” for inspection and rectification, if necessary, as required by the AD (Requirement). Confirm with CASA, APPH, or BAE Systems what constitutes an “authorised” agency if there is any uncertainty; the AD requires authorisation but does not define who authorises.
6. Ensure rectification per APPH Service Bulletins: The authorised overhaul agency must inspect and carry out necessary rectification measures and must mark the part in accordance with APPH Ltd Service Bulletin 1847-32-14 and/or 1862-32-14, as applicable, or later approved revisions (Requirement). Obtain and retain copies of the relevant APPH Service Bulletins and any approved revisions used.
7. Record the marking and overhaul: After overhaul and marking, maintain records linking the part serial number to the overhaul agency’s inspection report, any rectification performed, and the marking applied, so that the installation trace is demonstrable in the event of audit or inspection. The AD does not specify record formats or retention periods, so adopt robust traceability practices consistent with continuing airworthiness procedures.
Operational readiness and planning:
8. Grounding and scheduling: Anticipate that discovery of an affected radius rod will require immediate removal and replacement and will therefore affect flight schedules. Ensure availability of replacement parts or of authorised overhaul services and plan logistics accordingly.
9. Inventory and supplier checks: Inspect spares inventory and confirm whether any stored radius rods or Buffer Springs p/n 184818 correspond to the batch identified in the Background (Background). Segregate suspect stock and coordinate with distributors or APPH to confirm part status.
10. Cross-reference EASA AD: Note the AD’s reference to EASA Emergency AD 2009-0181-E (Requirement note). Where aircraft operate internationally or parts were obtained through overseas suppliers, obtain and reconcile the EASA AD text to ensure consistency across jurisdictions.
Documentation for proof of compliance:
11. Maintain ASB and SB copies: Retain copies of BAE Systems ASB 32-A-JA090640 Revision 2 (or later EASA-approved revision) and APPH Service Bulletins 1847-32-14 and/or 1862-32-14 (or later approved revisions) as the AD makes compliance dependent on those documents (Requirement).
12. Create a compliance checklist: Record serial numbers checked, dates of inspection, parts removed, replacement part serial numbers, overhaul agency identity and reports, and the marking applied. While the AD does not specify record-keeping procedures, such documentation will be the practical means to demonstrate compliance.
13. Communicate with regulators if uncertain: If the operator has any uncertainty about what constitutes an “authorised overhaul agency,” the interpretation of “serviceable unit,” or which ASB revision is EASA-approved, seek clarification from CASA or from the aircraft/component manufacturer. The AD itself does not resolve these definitional questions.
Summary steps: consult the ASB for serial numbers, inspect and identify parts, remove and replace any affected radius rod before further flight, and only reinstall an affected radius rod after authorised overhaul, rectification and marking per APPH Service Bulletins. Retain comprehensive records linking serial numbers to inspections, overhauls and marking to evidence compliance with the AD’s requirements.