CTHIn ForceLegislation
AD/J4100/24 - Fuel Boost Pump and Fuel Tank High Level Sensor Wiring
BAe Systems (Operations) Jetstream 4100 BAe Systems (Operations) Jetstream 4100 Series Aeroplanes
Start here
Get a plain-English read of BAe Systems (Operations) Jetstream 4100
Turn the raw legal text into a practical explanation grounded in AD/J4100/24 - Fuel Boost Pump and Fuel Tank High Level Sensor Wiring.
BAe Systems (Operations) Jetstream 4100 Series Aeroplanes
| AD/J4100/24 | Fuel Boost Pump and Fuel TankHigh Level Sensor Wiring | 5/2008 DM |
|---|
| Applicability: | Jetstream 4100 series aeroplanes, all models, all serial numbers. |
|---|---|
| Requirement: | 1. Modify the left (LH) and right (RH) wing fuel boost pump wiring in accordance with paragraphs 2B and 2C of BAE Systems (Operations) Ltd Service Bulletin (SB) J41-28-014 Revision 1 dated 21 December 2007. |
| 2. Inspect the LH and RH wing fuel high level sensor wiring in accordance with paragraph 2D of SB J41-28-014 Revision 1. | |
| 3. If excess wiring and/or damaged wiring is found during the Requirement 2 inspection, accomplish the corrective actions as specified in paragraph 2DSB J41-28-014 Revision 1. | |
| Later revisions of SB J41-28-014, approved by the European Aviation Safety Agency (EASA), are acceptable for compliance with the requirements of this Directive. | |
| Note: EASA AD 2008-0041 refers. | |
| Compliance: | For Requirement 1 and 2 - At the next major inspection or wing tank access, or within 24 months after the effective date of this Directive, whichever occurs first. |
| For Requirement 3 - Before the next flight after the Requirement 2 inspection. | |
| This Airworthiness Directive becomes effective on 14 March 2008. | |
| Background: | Following the assessment of fuel tank wiring installations required by SFAR 88 and equivalent JAA/EASA policy, BAE Systems identified two features in the Jetstream 4100 where the need for design changes was apparent. One of these is addressed by SB J41-28-014 which introduces changes to the wiring harness installations to the LH and RH fuel boost pumps, identified by modification number JM41672. In addition, to detect excessive cable lengths and evidence of chafing damage, SB J41-28-014 provides instructions to inspect and correct, as necessary, the internal fuel tank wiring routed to the LH and RH high level sensors.Internal fuel tank wiring chafing damage, if not corrected, could lead to ignition of fuel vapours and subsequent fuel tank explosion. |