What it does
This Airworthiness Directive (AD/J4100/24), issued by the Civil Aviation Safety Authority (CASA) effective 14 March 2008, imposes a mandatory engineering change and a one-time inspection on BAe Systems (Operations) Jetstream 4100 series aeroplanes, all models and all serial numbers. The directive requires two distinct actions. First, the operator must modify the left and right wing fuel boost pump wiring by replacing the existing metallic conduit assemblies with loom assemblies, as specified in paragraphs 2B and 2C of BAE Systems Service Bulletin J41-28-014 Revision 1 dated 21 December 2007. That modification is identified by BAE Systems modification number JM41672. Second, the operator must inspect the left and right wing fuel high level sensor wiring for excess cable length and evidence of chafing, in accordance with paragraph 2D of the same service bulletin. If excess or damaged wiring is found during that inspection, the operator must accomplish the corrective actions specified in paragraph 2D of the service bulletin before the next flight. The AD allows later revisions of the service bulletin that have been approved by the European Aviation Safety Agency (EASA) to be used for compliance. The compliance timeline is tiered: the modification and the inspection must be completed at the next major inspection or wing tank access, or within 24 months after the effective date (14 March 2008), whichever occurs first. The corrective actions for any wiring damage, however, must be done before the next flight after that inspection. The stated purpose, set out in the Background section of the AD, is to address design deficiencies identified following the assessment of fuel tank wiring installations required by SFAR 88 and equivalent JAA/EASA policy. The Background states that chafing damage to internal fuel tank wiring could lead to ignition of fuel vapours and subsequent fuel tank explosion. In mechanical terms, the AD imposes an unfunded mandate: operators must absorb the cost of parts, labour, and aircraft downtime to implement a design change that the original manufacturer later recognised as necessary. The directive does not provide any compensation or transition subsidy.