AD/GAZELLE/1 - Main Gearbox - Inspection During Initial Operations
1AD/GAZELLE/1 - Main Gearbox - Inspection During Initial Operations
Start here
Get a plain-English read of 1
Turn the raw legal text into a practical explanation grounded in AD/GAZELLE/1 - Main Gearbox - Inspection During Initial Operations.
meta-content-style-type: text/css meta-content-type: application/xhtml+xml; charset=utf-8 meta-generator: Aspose.Words for .NET 22.10.0
?xml version="1.0" encoding="utf-8" standalone="no"?>
COMMONWEALTH OF AUSTRALIA (Civil Aviation Regulations 1998), PART 39 - 105 CIVIL AVIATION SAFETY AUTHORITY
SCHEDULE OF AIRWORTHINESS DIRECTIVES
Image unavailable in extracted text Eurocopter SA341 and SA342 (Gazelle) Series Helicopters
AD/GAZELLE/1 Main Gearbox - Inspection During Initial Operations
8/76
Applicability: All models SA341 fitted with main gear box P/N 341A.32. 1000.01, .02, .03 or .05 (not modified to AMS 07.7077) with less than 25 hours time in service since new or recondition.
Document: Aerospatiale Gazelle SB 341 05.10. Compliance: In accordance with the requirement document.