What it does
This instrument is a Civil Aviation Safety Authority (CASA) Airworthiness Directive numbered AD/G1159/46, issued on 21 June 2007 and effective from 13 July 2007. It requires operators of certain Gulfstream business jets to determine the applicability of seven United States Federal Aviation Administration airworthiness directives listed in Table 1, and if any of those FAA ADs are applicable and have not previously been complied with, to perform the actions they require. The FAA ADs cover a range of one-time inspections, modifications, and system changes on the roll axis hardover prevention system, wiring harness clearance, fire extinguisher bottles, pilot’s overhead circuit breaker panel, left and right ailerons, landing gear selector dump valve, and crew oxygen bottles. The background statement explains that the compliance date or period for each of those FAA ADs has already passed, and that CASA has determined they may be applicable to recently registered or imported Australian aircraft. This is therefore a catch-up directive: it does not create new substantive safety requirements but rather forces compliance with existing design-standard ADs from the country of design (the United States) that may have been missed when an aircraft entered the Australian register. The compliance deadline is within 30 days after the effective date of the directive (13 July 2007) or prior to the issue of a Certificate of Airworthiness for the aircraft, whichever occurs later. The directive is signed by a delegate of CASA. Because the substantive mandates are contained in the incorporated FAA ADs, an operator cannot satisfy AD/G1159/46 simply by reading this instrument; the operator must locate, interpret, and implement each referenced FAA AD. The compliance burden falls squarely on the registered operator and the maintenance organisation. The directive does not provide for extensions, alternative means of compliance, or exemptions; it assumes the FAA ADs’ requirements are directly applicable and that their compliance times have passed, so the work is overdue by definition. This creates immediate pressure on operators who may not have known about the FAA ADs, particularly those who imported aircraft from jurisdictions where the ADs were not adopted or enforced.