This section sets out concrete steps, strictly drawn from and consistent with the AD text, for operators to align practice with the AD’s requirements. The AD mandates three discrete actions and the timing for each. Follow these steps exactly as stated in the AD, and ensure record-keeping to demonstrate compliance.
Step 1 , Obtain the referenced ASB and Flight Manual page
- Acquire Alert Service Bulletin EC135-62A-021 dated 23 June 2005 and the flight manual page attached to that ASB. The AD requires inspections to be performed "in accordance with" that ASB and requires insertion of the attached Flight Manual page into the Flight Manual (Requirement).
Step 2 , Update Flight Manual before the next flight
- Insert the flight manual page attached to ASB EC135-62A-021 into the Flight Manual before the next flight after the AD’s effective date (Requirement 3; Compliance). Control the amendment in accordance with your operations manual and record the insertion as a Flight Manual amendment. Ensure all crew copies and distributed manuals are updated or continuous page inserts are managed.
Step 3 , Implement pre-flight inspection procedure
- Implement the upper plain journal bearing visual inspection in accordance with ASB EC135-62A-021. Conduct this inspection before the next flight after the effective date and thereafter at each pre-flight check (Requirement 1; Compliance).
- Implement the lower plain journal bearing inspection (opening the gear cover) as set out in ASB EC135-62A-021. Conduct this inspection before the next flight after the effective date and thereafter at each pre-flight check (Requirement 2; Compliance).
Step 4 , Train and approve pilots if using pilot-performed certification
- If you propose to have pilots perform and certify the inspections, ensure each pilot completes an "approved training program" as the AD requires (Requirement). The AD does not specify who approves the training program; operators should confirm the applicable approving authority (for example CASA or the operator’s internal approvals), obtain written approval, and maintain training records. Document the training content so it maps to the inspection steps required by ASB EC135-62A-021.
Step 5 , Establish inspection certification and record-keeping
- Create and maintain an auditable record that demonstrates each inspection was performed in accordance with the ASB and the AD timing. If a pilot performs the inspection and certification, record the pilot’s identity, the training approval evidence, date/time of inspection, and the result of the inspection. Retain records in accordance with your continuum-of-care documentation policy and in a manner available for CASA inspection.
Step 6 , Action on non-conforming findings
- If either or both bushings are not in the correct position on inspection, do not fly except in accordance with CASR 21.197. The AD makes further flight conditional on CASR 21.197; therefore immediately refer to CASR 21.197 to determine and follow the procedure for obtaining permission to fly or for achieving return to service. Log the non-conforming condition and initiate maintenance intervention per the ASB and applicable maintenance procedures.
Step 7 , Coordinate maintenance and operational responses
- Because the lower bearing inspection requires opening the gear cover, ensure maintenance staff or appropriately trained personnel are available where necessary, and record any maintenance actions performed. If a repair or part replacement is required, follow the ASB and applicable maintenance regulations for parts, sign-off, and return-to-service.
Step 8 , Confirm prior compliance where applicable
- If your aircraft complied previously with AD/EC 135/10, retain evidence of that compliance. The AD states that prior compliance with AD/EC 135/10 constitutes compliance with the same requirement of this amendment (Background). Maintain these records for audit purposes.
Step 9 , Update operational manuals and checklists
- Incorporate the inspection steps and Flight Manual changes into your pre-flight checklists, operations manual, and maintenance control procedures. Make sure line crews and pilots are briefed on the inspection requirements and the procedure to follow if an out-of-position bushing is detected.
Step 10 , Prepare for operational disruption
- Given the safety risk identified in the Background,that a shifted plain journal bearing can limit collective control movement and potentially result in loss of control,plan for the logistical consequences of aircraft grounding, including alternative transport, passenger/customer communication, and maintenance scheduling.
These compliance steps strictly follow the AD’s text. The AD ties both the method and the content of inspections to ASB EC135-62A-021 and makes the procedural outcome for non-conformance dependent upon CASR 21.197. Operators should not substitute alternate inspection methods or remediation pathways without explicit manufacturer instructions or regulatory approval.
If any ambiguity arises in the course of complying with the AD, especially about what constitutes an "approved training program" or the application of CASR 21.197, operators should seek clarification from CASA or the relevant approved authority, and document any guidance received.