The AD prescribes a clear sequence of tasks and deadlines that form the compliance pathway. The following steps, drawn strictly from the AD text, provide a practical checklist for operators and maintenance organisations:
-
Confirm applicability. Inspect aircraft records and physical markings to determine whether the aircraft is fitted with wing box part numbers C6W1002-1/-3 and subsequent, or R.W. Martin Re‑Life wing box WR6-1002-59 or -61, and whether the front spar adapter assembly part number is C6WM1027-1 or C6WM1027-3. Also identify whether modification was effected under FAA STC No. SA00160LA or Canadian STC No. SA96-65 (Applicability).
-
Determine service age of the adapter assembly. If the aircraft incorporates a C6WM1027-1 front spar adapter assembly with 10 or more years of service, the operator must follow the Requirement 1 pathway. Confirm the in‑service duration of the front spar adapter assembly itself, not merely aircraft age (Requirement 1).
-
Incorporate Viking SB 6/541 where applicable. For affected aircraft with C6WM1027-1 assemblies aged 10 or more years, incorporate Viking SB 6/541 (installation of inspection holes in Lower Wing Assembly) dated 1 October 2007, or a later Transport Canada approved revision, before performing visual inspections (Requirement 1.a).
-
Perform visual inspections in accordance with the correct SB. After installing inspection holes, carry out the visual inspection of the front spar adapter assemblies per Viking SB 6/540 (dated 1 October 2007), or, for R.W. Martin wing boxes, perform the inspection in accordance with R.W. Martin SB 00160/2 Revision A dated 15 November 2007 (Requirement 1.a).
-
Replace cracked assemblies before further flight. If any inspection detects cracking in a front spar adapter assembly, the operator must replace the cracked assembly before further flight with new adapter part number C6WM1027-3 using Viking SB 6/542 dated 1 October 2007, or later Transport Canada approved revision. For R.W. Martin wing boxes, contact R.W. Martin for replacement instructions and comply with those instructions (Requirement 1.b).
-
Insert corrosion-prevention task into approved maintenance schedule. Incorporate task C57-10-18 from the DHC-6 Corrosion Prevention and Control Manual, PSM 1-6-5, into the Transport Canada approved maintenance schedule within 90 days after 5 June 2008, unless already accomplished (Requirement 2; Compliance). Ensure the revision is formally approved by the relevant authority, as the AD ties the insertion to Transport Canada approval.
-
Observe inspection intervals. Unless the initial inspection requirement has already been done, carry out the initial inspection within 180 days after 5 June 2008. Thereafter, repeat the visual inspection required by Requirement 1.a at intervals not exceeding 1,200 flight hours, 2,400 flight cycles, or 12 months, whichever occurs first (Compliance). Configure maintenance tracking systems to trigger inspections on whichever metric reaches the limit first.
-
Achieve terminating action where desired. If the operator replaces the front spar adapter in accordance with Requirement 1.b and incorporates task C57-10-18 into the Transport Canada approved maintenance schedule in accordance with Requirement 2, those two steps together "constitute terminating action to this Directive." Record completion and provide evidence that both steps were completed in accordance with the AD and Transport Canada approvals to document that no further AD inspections are required under this AD.
-
Follow the correct SB revisions and approvals. Use the Viking or R.W. Martin service bulletins as dated in the AD unless a later Transport Canada approved revision exists. Where a later revision is used, ensure that it is Transport Canada approved as required by the AD’s wording.
-
Operational handling on detection of cracking. If inspection reveals a cracked front spar adapter assembly, do not permit further flight until replacement and any required actions under the applicable SB are completed. Plan for parts procurement and scheduling, particularly where R.W. Martin replacement instructions or parts may be required.
-
Document compliance. Retain records of the SB incorporation, inspections (including dates, findings, serial/part numbers inspected), any replacement work performed (parts used: C6WM1027-3 where applicable), and the Transport Canada approval record for the maintenance-schedule change. While the AD text does not specify record retention periods, contemporaneous documentation best supports demonstration of compliance to CASA inspectors and demonstrates that terminating action has been achieved where applicable.
-
Coordinate regulator approvals where necessary. The AD requires incorporation of tasks into a Transport Canada approved maintenance schedule; engage with the approving authority as necessary to secure the required approval and to confirm that the chosen SB revision is Transport Canada approved.
These steps mirror the AD’s language and deadlines. They impose concrete operational work: physical modification (inspection-hole installation), recurring inspections at specified maxima, mandatory grounding/replacement on detection of cracks, and formal modification of the approved maintenance schedule. Compliance requires configuration control, parts traceability, interaction with service bulletin issuers (Viking, R.W. Martin), and contact with regulators for maintenance-schedule approval.
Failure to follow these steps risks non‑compliance with the AD’s mandates and will leave the operator without the "terminating action" relief the Directive offers once replacement and task incorporation are completed.