What it does
This Airworthiness Directive (AD/CL/600/89, Fuel Tank Sealant, 12/2007) compels operators of specific Bombardier CL-600-2B19 aircraft to apply sealant to certain fuel system components to address a perceived risk of fuel tank explosion during lightning strikes. Mechanically, the AD imposes three distinct requirements on two groups of aircraft depending on serial number. For aircraft serial numbers 7003 through 7067 and 7069 through 7797, the operator must apply sealant to the bolts on the collector fuel tanks in accordance with Revision A of Bombardier Service Bulletin (SB) 601R-28-051, dated 30 March 2005 (or later Transport Canada approved revisions). For all aircraft serial numbers from 7003 through 7924, the operator must conduct a general visual inspection of the left and right transfer ejector pumps for the presence of a fillet seal on the pump edges and sealant on the bolts. If sealant is missing from the edge of the pump or any bolts, the operator must, before further flight, apply sealant in accordance with Revision A of SB 601R-28-060 (or later Transport Canada approved revisions). The compliance deadline is 5,000 flight hours after the effective date of 22 November 2007, unless the relevant work was already completed using the original issue of the same service bulletins prior to that effective date. The AD does not mandate ongoing or recurrent inspections after the sealant has been applied, so the burden is a one time cost per aircraft. The directive itself is a legislative instrument made by a delegate of the Civil Aviation Safety Authority under the Civil Aviation Act 1988, and it refers to Transport Canada AD CF-2007-17 but does not incorporate its text as legally binding in Australia; the Transport Canada approval is only relevant to revisions of the referenced service bulletins. The AD is narrow in scope both in terms of aircraft serial numbers affected and the specific physical condition it seeks to correct. It imposes an absolute duty on operators to achieve compliance, with no discretion to vary the method or timing except by using later approved revisions of the same service bulletins. The AD does not provide for alternative means of compliance, nor does it allow the operator to substitute its own engineering judgment for the prescribed methods. The effective date mechanism is typical of CASA ADs, giving operators a fixed calendar date from which the compliance period begins to run, regardless of when the operator actually receives notice of the AD. The compliance calendar is driven by flight hours, which is a usage based metric that aligns with the engineering assessment of risk accumulation. However, the 5,000 hour window is generous and will give most operators years to plan and execute the work.