AD/CESSNA 400/79 - Cabin Overhead Bulkhead - Inspection
1AD/CESSNA 400/79 - Cabin Overhead Bulkhead - Inspection
Start here
Get a plain-English read of 1
Turn the raw legal text into a practical explanation grounded in AD/CESSNA 400/79 - Cabin Overhead Bulkhead - Inspection.
meta-content-style-type: text/css meta-content-type: application/xhtml+xml; charset=utf-8 meta-generator: Aspose.Words for .NET 22.10.0
?xml version="1.0" encoding="utf-8" standalone="no"?>
COMMONWEALTH OF AUSTRALIA (Civil Aviation Regulations 1998), PART 39 - 105 CIVIL AVIATION SAFETY AUTHORITY
SCHEDULE OF AIRWORTHINESS DIRECTIVES
Image unavailable in extracted text Cessna 400 Series Aeroplanes
AD/CESSNA 400/79 Cabin Overhead Bulkhead - Inspection 3/81
Applicability: All models 441 with S/Nos. 441-0001 to 441-0139. Document: Cessna Customer Care SIL No. PJ80-13.
Compliance: Within 100 hours time in service after 31 March 1981.
Background: Excessive material may have been removed from the cabin overhead bulkheads at FS
185.37 and FS 212.10 to allow installation of air ducts.