Step 1 , Identify affected aircraft: Confirm whether the aircraft is a Cessna Model 441 and whether its serial number falls within 441-0001 through 441-0109. The AD’s Applicability is limited to that model and serial-number range; only those aircraft are subject to this Directive’s requirements (Applicability).
Step 2 , Timing for record check: Schedule a records review to determine whether the aircraft’s maintenance records show compliance with Cessna Propjet SIL PJ79-27 dated 30 July 1979 or SIL PJ79-27 Revision 1 dated 13 September 1979. This Requirement 1 check must be carried out at the aircraft’s next scheduled maintenance but in any event no later than 25 September 2009 (Requirement 1; Compliance). Ensure the records check is logged with date, person conducting the review, and the exact entry in the records relied upon.
Step 3 , Evidence of prior FAA AD compliance: If records indicate that FAA AD 79-19-12 Amdt 39-3574 was complied with, that documentation is considered acceptable evidence of compliance with this Directive (Requirement 1 Note 1). When relying on FAA AD compliance, preserve the specific maintenance entries, work orders, AD compliance stamps, or equivalent documentation that explicitly references FAA AD 79-19-12 or its amendment number, because the AD accepts FAA compliance only when documented (Requirement, Note 1).
Step 4 , If records do not evidence compliance, rewire: If Requirement 1 does not indicate compliance with SIL PJ79-27 or Revision 1, the operator must rewire the engine control wiring in accordance with the instructions provided by SIL PJ79-27 Revision 1 (Requirement 2). Arrange for an appropriately authorised maintenance organisation or engineer to perform the rewiring work in accordance with the SIL’s procedures.
Step 5 , Timing for the rewiring: Where rewiring is required following a records check, the operator must not return the aircraft to flight until the rewiring has been completed , Requirement 2 must be satisfied before further flight after the Requirement 1 inspection (Compliance). Plan maintenance slots, parts procurement, and authorisation accordingly to avoid grounding delays.
Step 6 , Documentation and sign-off: After completion of either the records check (if it shows compliance) or the rewiring work, ensure that the maintenance records are updated to show the works performed, the method used (for example, SIL PJ79-27 Revision 1 or FAA AD compliance citation), the date of completion, the identity and authorisation details of the person or organisation carrying out the work, and any certification or release to service. The AD relies on maintenance records as the evidence of compliance (Requirement).
Step 7 , Access the correct technical material: Obtain the specific Cessna Propjet SIL PJ79-27 Revision 1 dated 13 September 1979, because that is the revision expressly cited for rewiring instructions (Requirement 2). Ensure the maintenance personnel follow the SIL’s instructions precisely, because the AD prescribes compliance in accordance with that document.
Step 8 , Liaise with CASA if in doubt: Although the AD itself does not set out processes for alternative methods of compliance or waivers, if there is uncertainty about whether the recorded FAA AD compliance meets the Directive’s requirement, or if access to SIL Revision 1 is problematic, operators should raise the issue with CASA or their nominated aviation regulatory advisors. The Background notes CASA’s role in issuing State-of-design ADs, and the AD is signed by a CASA delegate; CASA is therefore the relevant authority for clarifying compliance queries (Background).
Step 9 , Be mindful of scheduling consequences: The AD permits the records check to be deferred to the next scheduled maintenance but no later than 25 September 2009. Do not assume indefinite deferral; schedule the records check within that window to avoid non-compliance. If the records check reveals non-compliance, do not return the aircraft to service until rewiring is complete (Requirement; Compliance).
Step 10 , Maintain traceable evidence for future audits: Because the AD accepts FAA AD compliance when recorded (Requirement, Note 1), and because maintenance records are the compliance evidence, keep a clear and traceable audit trail showing either the earlier FAA AD compliance or the SIL-based rewiring work. This includes work orders, parts used, sign-off by the authorised maintenance engineer, and entries in the aircraft’s maintenance log.
Who pays and who decides operationally: The operator/owner bears the direct costs of the records check and, if necessary, the rewiring work required by SIL PJ79-27 Revision 1. Decisions about scheduling, selection of maintenance provider, parts procurement, and return-to-service certification rest with the operator and their authorised maintenance organisation; CASA sets the requirement and the compliance dates (Requirement; Compliance; Background).
Signature and effective date: Note that the AD is signed by a CASA delegate (Charles Lenarcic) on 15 August 2008 and becomes effective on 25 September 2008 (Background; signature; Compliance). Compliance planning should therefore assume the AD’s obligations were operative from that effective date onwards.
Final practical note: The AD text provides no alternative methods of compliance within its body. Compliance is therefore achieved by documented evidence of prior FAA AD work or by performing the rewiring in accordance with SIL PJ79-27 Revision 1 and documenting that completion before further flight following inspection (Requirement; Note 1; Compliance).