CTHIn ForceLegislation
AD/CESSNA 180/87 - Main Electrical Power Junction Box
Cessna 180, 182 and Wren 460 Series AeroCessna 180, 182 and Wren 460 Series Aeroplanes
Start here
Get a plain-English read of Cessna 180, 182 and Wren 460 Series Aero
Turn the raw legal text into a practical explanation grounded in AD/CESSNA 180/87 - Main Electrical Power Junction Box.
Cessna 180, 182 and Wren 460 Series Aeroplanes
| AD/CESSNA 180/87 | Main Electrical Power Junction Box | 9/2005 |
|---|
<table cellspacing="0" cellpadding="0" style="width:510.3pt; margin-top:0pt; margin-bottom:0pt; border-collapse:collapse"><tbody><tr><td style="width:74.35pt; padding-right:5.35pt; padding-left:5.35pt; vertical-align:top"><p><span>Applicability:</span></p></td><td colspan="2" style="width:414.55pt; padding-right:5.35pt; padding-left:5.35pt; vertical-align:top"><p><span>Cessna Model 182T and T182T aeroplanes as follows:</span></p></td></tr><tr><td style="width:74.35pt; padding-right:5.35pt; padding-left:5.35pt; vertical-align:top"><p><span></span></p></td><td style="width:143.5pt; padding-right:5.35pt; padding-left:5.35pt; vertical-align:top"><p style="margin-left:56.7pt"><span style="font-weight:bold">Model</span></p></td><td style="width:260.35pt; padding-right:5.35pt; padding-left:5.35pt; vertical-align:top"><p style="text-align:center"><span style="font-weight:bold">Serial Numbers</span></p></td></tr><tr><td style="width:74.35pt; padding-right:5.35pt; padding-left:5.35pt; vertical-align:top"><p><span></span></p></td><td style="width:143.5pt; padding-right:5.35pt; padding-left:5.35pt; vertical-align:top"><p style="margin-left:56.7pt; text-indent:-1.1pt"><span>182T</span><br><br><span>T182T</span></p></td><td style="width:260.35pt; padding-right:5.35pt; padding-left:5.35pt; vertical-align:top"><p><span>18281242 through 18281502, 18281506 and 18281507</span><br><span>T18208212 through T18208357</span></p></td></tr><tr><td style="width:74.35pt; padding-right:5.35pt; padding-left:5.35pt; vertical-align:top"><p><span>Requirement:</span></p></td><td colspan="2" style="width:414.55pt; padding-right:5.35pt; padding-left:5.35pt; vertical-align:top"><p style="margin-left:21.3pt; text-indent:-21.3pt"><span>1.</span><span style="width:12.3pt; text-indent:0pt; display:inline-block"> </span><span>Unless already accomplished, inspect any MC01-3A I.C. 9 (part number (P/N) S3100-297) or MC01-3A I.C. 10 (P/N S3100-344) main electrical power junction box for any incorrect amperage (amp) circuit beaker installed in place of the required 40-amp circuit breakers in accordance with Cessna Service Bulletin (SB) SB05-24-01 dated 31 January 2005.</span></p></td></tr><tr><td style="width:74.35pt; padding-right:5.35pt; padding-left:5.35pt; vertical-align:top"><p><span></span></p></td><td colspan="2" style="width:414.55pt; padding-right:5.35pt; padding-left:5.35pt; vertical-align:top"><p style="margin-left:21.3pt; text-indent:-21.3pt"><span>2.</span><span style="width:12.3pt; text-indent:0pt; display:inline-block"> </span><span>Replace any incorrect amp circuit breaker found during the Requirement 1 inspection with the required 40-amp circuit breaker in accordance with</span><br><span>SB05-24-01.</span></p></td></tr><tr><td style="width:74.35pt; padding-right:5.35pt; padding-left:5.35pt; vertical-align:top"><p><span></span></p></td><td colspan="2" style="width:414.55pt; padding-right:5.35pt; padding-left:5.35pt; vertical-align:top"><p style="margin-left:21.3pt; text-indent:-21.3pt"><span>3.</span><span style="width:12.3pt; text-indent:0pt; display:inline-block"> </span><span>Only 40-amp circuit breakers may be installed as spares in any MC01-3A I.C. 9 or MC01-3A I.C. 10 main electrical power junction box.</span></p></td></tr><tr><td style="width:74.35pt; padding-right:5.35pt; padding-left:5.35pt; vertical-align:top"><p><span></span></p></td><td colspan="2" style="width:414.55pt; padding-right:5.35pt; padding-left:5.35pt; vertical-align:top"><p><span>Later revisions of the above SB, approved by the United States Federal Aviation Administration (FAA) as an Alternate Method of Compliance (AMOC) to FAA AD 2005-13-10, are considered acceptable for compliance with the equivalent Requirements of this Directive.</span></p></td></tr><tr><td style="width:74.35pt; padding-right:5.35pt; padding-left:5.35pt; vertical-align:top"><p><span></span></p></td><td colspan="2" style="width:414.55pt; padding-right:5.35pt; padding-left:5.35pt; vertical-align:top"><p class="Note"><span>Note:</span><span> </span><span>FAA AD 2005-13-10 Amdt 39-14147 refers.</span></p></td></tr><tr><td style="width:74.35pt; padding-right:5.35pt; padding-left:5.35pt; vertical-align:top"><p><span>Compliance:</span></p></td><td colspan="2" style="width:414.55pt; padding-right:5.35pt; padding-left:5.35pt; vertical-align:top"><p><span>For Requirement 1 - </span><span>Within the next 30 days after the effective date of this Directive.</span></p></td></tr><tr><td style="width:74.35pt; padding-right:5.35pt; padding-left:5.35pt; vertical-align:top"><p><span></span></p></td><td colspan="2" style="width:414.55pt; padding-right:5.35pt; padding-left:5.35pt; vertical-align:top"><p><span>For Requirement 2 - </span><span>Before further flight after the Requirement 1 inspection.</span></p></td></tr><tr><td style="width:74.35pt; padding-right:5.35pt; padding-left:5.35pt; vertical-align:top"><p><span></span></p></td><td colspan="2" style="width:414.55pt; padding-right:5.35pt; padding-left:5.35pt; vertical-align:top"><p><span>For Requirement 3 - As of the effective date of this Directive.</span></p></td></tr><tr><td style="width:74.35pt; padding-right:5.35pt; padding-left:5.35pt; vertical-align:top"><p><span></span></p></td><td colspan="2" style="width:414.55pt; padding-right:5.35pt; padding-left:5.35pt; vertical-align:top"><p><span>This Airworthiness Directive becomes effective on 1 September 2005.</span></p></td></tr></tbody></table>