AD/BELL 412/15 - Battery Cable Installation
1AD/BELL 412/15 - Battery Cable Installation
Start here
Get a plain-English read of 1
Turn the raw legal text into a practical explanation grounded in AD/BELL 412/15 - Battery Cable Installation.
meta-content-style-type: text/css meta-content-type: application/xhtml+xml; charset=utf-8 meta-generator: Aspose.Words for .NET 22.10.0
?xml version="1.0" encoding="utf-8" standalone="no"?>
COMMONWEALTH OF AUSTRALIA (Civil Aviation Regulations 1998), PART 39 - 105 CIVIL AVIATION SAFETY AUTHORITY
SCHEDULE OF AIRWORTHINESS DIRECTIVES
Image unavailable in extracted text Bell Helicopter Textron 412 Series Helicopters
AD/BELL 412/15 Battery Cable Installation 9/86
Applicability: All models with S/Nos 33108 through 33118.
Requirement: Inspect the battery cable installation according to Bell Alert Service Bulletin No. 412- 86-23. Modify the installation if required according to the requirements of the referenced Service Bulletin.
Compliance: Within 30 hours time in service after 30 September 1986.
Background: Incorrect battery cable installation may cause chafing against an adjacent lightening hole and/or the forward fuel cell vent line manifold. An incorrect installation has been detected on a new production helicopter.