The AD provides explicit steps and timelines. The following is a practical, source-grounded compliance checklist that mirrors the AD’s Parts and the Compliance paragraph and indicates the documentation and procedural actions required.
Immediate preparatory steps (before or at the effective deadline)
-
Identify affected aircraft
- Check each Model 407 airframe for tailboom part number. The AD applicability is limited to tailboom PNs 407-030-801-107 and 407-530-014-101/-103 (Applicability).
- Make the required record entry in the helicopter technical records stating the applicable tailboom part number (Part I(b)). If the tailboom is not one of the affected PNs, annotate the records accordingly (Part I(c)).
-
Timely execution of Part I
- For each affected helicopter, perform the verification and make the records entry within 10 flight hours after 15 February 2008 (Compliance).
Obtain and confirm the correct ASB revision
3. Acquire BHTC ASB 407-07-80
- Obtain the original issue of BHTC ASB 407-07-80 and confirm whether any later revision is Transport Canada approved. The AD requires compliance with the ASB original issue or any later Transport Canada approved revision (Parts II-IV).
- Confirm Transport Canada approvals
- Verify that any ASB revision intended for use has Transport Canada approval. Only Transport Canada approved revisions are incorporated by the AD (Parts II-IV).
Execute Part II , surface preparation and initial inspection
5. Timeframe for Part II
- Perform Part II within 25 flight hours or 30 days after 15 February 2008, whichever occurs first (Compliance).
-
Surface preparation per ASB
- Prepare the tailboom surface for the “Daily Visual Check” in accordance with Part II paragraph (1) items (a) to (e) of ASB 407-07-80 original issue or later Transport Canada approved revision (Part II).
-
Magnified inspection of the “Daily check area”
- Inspect both areas indicated as “Daily check area” on Figure 2 of the ASB using a 10x magnifying glass (Part II). If a crack is detected, replace the tailboom with a serviceable part before further flight (Part II).
-
Record remedial surface protection
- If no crack is detected, ensure both surfaces are dry and protect each reworked area with a thin coat of clear coating as instructed in the applicable paragraph of Part II of the ASB (Part II).
Execute Part III , Daily Visual Inspection
9. Daily pre-flight inspections
- Include the Daily Visual Inspection described in Part III of the ASB in the pre-flight checklist and ensure it is performed before the first flight of the day (Part III, Compliance). The AD requires performing the daily check “before the first flight of the day, during the pre-flight check.”
- Actions if a crack is found during daily checks
- If the daily check detects a crack, the AD requires replacement of the tailboom with a serviceable part before further flight. If the replacement tailboom is one of the PNs identified in the AD applicability section, the AD requires continuation of the inspections (Part III).
Execute Part IV , 100-hour inspection
11. Timing and intervals
- Perform the initial 100-hour inspection within 100 flight hours after 15 February 2008 and thereafter at intervals not to exceed 100 flight hours (Part IV, Compliance).
- Inspection procedures
- Conduct the 100-hour inspection in accordance with Part IV of ASB 407-07-80 original issue or later Transport Canada approved revision (Part IV). If the inspection detects a crack, the tailboom must be replaced with a serviceable part before further flight (Part IV). Continue inspections if the replacement tailboom is identified in the AD applicability.
Part V , terminating action
13. Terminating replacement options
- If the operator elects to remove ongoing AD obligations by replacing the affected tailboom, the AD specifies that replacement with part number 407-030-801-201/-203/-205, or later part numbers, constitutes terminating action to this Directive (Part V). Confirm that the replacement PN is one of those listed or a later PN recognised by the AD.
- Documentation of terminating action
- Record the installation of the terminating tailboom PN in the helicopter technical records and retain the installation documentation to demonstrate that the Directive no longer applies.
Operational and supply planning
15. Parts availability and serviceable parts
- Because the AD requires replacement “before further flight” in the event of a crack, plan parts inventories or supplier lead times to avoid extended grounding. The AD does not provide interim repair options or temporary flight restrictions beyond the replacement requirement (Parts II-IV).
- Maintenance organisation readiness
- Ensure maintenance personnel are trained in the ASB procedures and have the required tools (for example a 10x magnifying glass) and materials (clear coating specified by ASB Part II) to conduct the inspections and protective work.
Record-keeping and evidence
17. Maintain clear technical records
- Record initial verification (Part I), each Part II surface preparation and inspection result, daily check records (Part III), 100-hour inspection findings (Part IV), and any replacement actions, including dates and part numbers installed. These records are the compliance evidence auditors will examine.
Monitoring and future revisions
18. Monitor Transport Canada approvals and related ADs
- Because the AD incorporates “later Transport Canada approved revisions” of the ASB and references Transport Canada AD CF-2008-04, regularly check for Transport Canada approvals or related ADs that could change the required inspection method or intervals (Parts II-IV, Note).
- Reconcile with previous amendments, life limits or modifications
- If the helicopter has been modified under prior amendments (for example modifications that introduced life limitations or changed inspection intervals per Amendment 2), reconcile those records with the current AD obligations documented here (Background).
Checklist summary (immediate to ongoing)
- Within 10 flight hours of 15 Feb 2008: verify tailboom PN and record it (Part I).
- Within 25 flight hours or 30 days of 15 Feb 2008: perform Part II surface prep and initial inspection using 10x magnification and apply clear coating if no cracks (Part II).
- Before first flight each day: perform the Daily Visual Inspection as per ASB Part III (Part III).
- Within 100 flight hours and then every 100 flight hours: perform Part IV inspection per ASB (Part IV).
- If any inspection reveals a crack: replace tailboom with a serviceable part before further flight (Parts II-IV).
- To terminate AD obligations: install PN 407-030-801-201/-203/-205 or later part numbers (Part V).
All actions must be documented in the helicopter technical records, and ASB procedures must be the original issue or a Transport Canada approved revision (Parts I-V, Compliance, Note). The AD became effective 15 February 2008 (Compliance), and Amendment 3 implements the changes described in the document (Background).