The Directive’s compliance path is short and prescriptive: follow the Boeing Special Attention Service Bulletin named and respect the time limits set out.
Step 1 , Confirm applicability: Obtain Boeing Special Attention Service Bulletin 737‑28‑1225, Revision 1, dated 30 October 2006 and determine whether the specific aeroplane(s) under your control appear in the SB’s identification list (Applicability). The AD’s applicability is expressed with reference to that SB; the AD will apply only to aeroplanes that the SB identifies.
Step 2 , Schedule the required test within the compliance window: The AD requires Requirement 1 , testing the electrical resistance of the bond between the bulkhead fitting for the fuel feed line and the wing front spar on the left and right wings and performing a general visual inspection of adjacent bonding jumpers , to be completed "within 60 months after the effective date of this Directive" (Compliance; Requirement). The effective date is 15 March 2007; calculate the deadline accordingly and schedule maintenance tasks within the 60‑month window (Compliance). Note that the test must be performed on both left and right wings and must include the visual inspection of adjacent bonding jumpers.
Step 3 , Use the SB for test and inspection methods: The AD requires that Requirement 1 be accomplished "in accordance with SB 737‑28‑1225, Revision 1" (Requirement). Therefore, use the SB to determine the exact measurement method, resistance thresholds (if any), inspection criteria, required tools and any acceptable measurement tolerances.
Step 4 , If defects are found, apply corrective actions as per the SB before further flight: The AD requires "carry out all applicable corrective actions in accordance with SB 737‑28‑1225, Revision 1" (Requirement), and it specifies that corrective actions required as a result of the test must be done "before further flight after the Requirement 1 electrical resistance test" (Compliance). In plain terms, if the test or inspection identifies an issue the aircraft must not return to service until the applicable repairs per the SB are completed.
Step 5 , Determine whether prior work satisfies the AD: If the electrical-resistance testing and any corrective actions were done before 15 March 2007 in accordance with Boeing SB 737‑28‑1225 dated 12 January 2006, then those actions are "considered acceptable for compliance with the actions required by this Directive" (Requirement). Compile maintenance records to demonstrate this if relied upon.
Step 6 , Consider later SB revisions only with FAA AMOC approval: If you propose to comply using a later revision of the Boeing SB rather than Revision 1, confirm that the later SB revision has been approved by the FAA as an AMOC to FAA AD 2007‑02‑14; only then will the AD accept the later revision as an equivalent method of compliance (Requirement). Obtain and retain evidence of FAA AMOC approval.
Step 7 , Document compliance: While the AD does not prescribe record-keeping in its text, maintain complete maintenance records showing the test results, inspections, corrective actions, dates and referencing the SB revision used. If prior SB-based actions are relied upon for compliance, include the earlier SB reference and records demonstrating that work was done prior to the AD effective date (Requirement).
Step 8 , Coordinate operational decisions: Because corrective actions required after the test must be completed before further flight, coordinate scheduling to minimise disruption. For example, ensure spares, qualified maintenance personnel and repair times are planned if testing is performed late in the allowable window and an unexpected defect is found.
Step 9 , Check the FAA AD and AMOC status: Obtain FAA AD 2007‑02‑14 and any AMOC determinations that affect SB revisions to confirm the status of acceptable later SB revisions and ensure Australian compliance is aligned with FAA approvals as the AD requires (Note).
Step 10 , Keep the DAS/CAA delegate contacts and signatures accessible: The AD is issued by the CASA delegate (James Coyne) and contains an effective date (1 February 2007 signature; effective 15 March 2007). Retain the AD text and any relevant correspondence or approvals that demonstrate compliance in case regulatory authorities request verification.
In short, compliance requires identification of in-scope aircraft via the specified SB, performance of the electrical-resistance test and visual inspection per SB procedures within the 60‑month window, and completion of any corrective action per the SB before further flight. Prior actions done under the 12 January 2006 SB are acceptable, and later SB revisions are acceptable only if the FAA has approved them as AMOCs to the referenced FAA AD. The AD delegates technical particulars to the Boeing SB and to FAA AMOC approvals; operators must therefore obtain, follow and document the SB procedures and any FAA approvals relied upon.