What it does
Airworthiness Directive AD/B737/293 mandates a physical wiring modification to the Master Dim and Test System on specific Boeing 737 series aeroplanes registered in Australia. The directive requires operators to modify the wiring for the master dim test system on the flight deck, following the detailed instructions in Boeing Special Attention Service Bulletin (SB) 737‑33‑1132, Revision 2 (dated 8 September 2005) for 737‑300, ‑400 and ‑500 models, and Boeing SB 737‑33‑1133, Revision 3 (also dated 8 September 2005) for 737‑600, ‑700, ‑700C, ‑800 and ‑900 models. Where the aircraft is classified under specific group numbers in those service bulletins, the operator must also accomplish certain prior or concurrent actions set out in Table 1 of the directive. For example, Group 57 aeroplanes (‑300/‑400/‑500) must have an engine instrument system (EIS) installed and the advisory system for that EIS modified, both done in accordance with Boeing service bulletins dating back to 1989. Group 37 and 46 aeroplanes require the installation of wiring for the test system of the audio control panel lamp under SB 737‑33‑1121 Revision 1. Group 2 aeroplanes must have splice SP896 installed per SB 737‑26A1083 Revision 1. Group 39 requires installation of a smoke detection and fire‑extinguishing system in the cargo compartment per the same SB. Group 59 requires replacement of VHF and HF communications panels with radio control panels per SB 737‑23‑1102 dated 3 June 1999. The underlying safety concern, as explained in the Background section, is that the master dim and test system circuit lacks wiring separation for the test ground signal of redundant equipment. A single fault failure could simulate a test condition and display test patterns on communications panels instead of selected radio frequencies, thereby inhibiting communication between flight crew and air traffic control. The core requirement (Requirement 1) must be met within 48 months after the effective date of 28 September 2006. Requirement 2 (the prior or concurrent actions) must be satisfied before or at the same time as Requirement 1. In economic terms, this directive imposes a substantial, non‑optional engineering cost on Australian operators of affected 737 airframes. The 48‑month compliance window recognises that the modification can be scheduled during major maintenance checks, but the prior‑action requirements introduce sequencing constraints that raise the risk of unexpected downtime if parts are not sourced in time. The directive is an Australian adoption of an FAA Airworthiness Directive (FAA AD 2006‑15‑18, Amendment 39‑14699), so the technical solution and timetables mirror the American rule, reducing scope for divergent standards but also limiting flexibility for smaller Australian operators with different fleet‑utilisation patterns.