Step 1 , Confirm applicability and operational status: Determine whether each aeroplane in the fleet is within the AD’s applicability (“AIRBUS A330 series aircraft”). For each aeroplane, establish whether the aircraft is being operated under MMEL item 24-22-01 or MMEL item 36-11-01 at the relevant times, since that determines whether Requirement 2 applies. For relief under MMEL 36-11-01, confirm whether the APU generator has been physically removed or deactivated.
Step 2 , Obtain and review the referenced Airbus AOT and EASA approvals: Secure a copy of AIRBUS All Operators Telex A330-24A3042 dated 22 March 2007 and check for any later EASA-approved revisions. The AD requires compliance “in accordance with the instructions” of that AOT or later EASA-approved revisions for both the one-time inspection and the differential pressure indicator checks. Do not attempt to substitute an unapproved internal procedure for the AOT without prior regulatory approval.
Step 3 , Plan the one-time inspection (Requirement 1): Schedule the one-time inspection of the inlet screen (last chance filter) for the APU generator scavenge-oil pump at a convenient maintenance opportunity, ensuring it is completed “no later than 31 May 2007” unless already accomplished. Coordinate availability of certified maintenance personnel, tooling and any parts that Airbus AOT specifies as necessary for corrective action.
Step 4 , Execute corrective actions per AOT: If the inspection reveals debris or other defects, apply the corrective actions exactly as set out in the Airbus AOT (Requirement 1). Ensure that maintenance release and certification procedures are followed for any corrective action that affects airworthiness.
Step 5 , Implement Requirement 2 where applicable: For aircraft operating under the specified MMEL items, implement the pre-flight differential pressure indicator button check on the lube filter and generator scavenge filter as a pre-flight task, as required by the AD, until 31 May 2007. Ensure relevant flight crew and ground crew are trained or briefed on how to perform and log the check in accordance with the AOT instructions. If relying on the relief for MMEL 36-11-01 via removal or deactivation of the APU generator, document the physical removal/deactivation and ensure the configuration is recorded in aircraft records.
Step 6 , Document everything contemporaneously: Even though the AD text does not specify record retention, contemporaneous entries in maintenance logs, maintenance release documentation and flight logs will be the primary evidence an operator can use to demonstrate compliance. Record the date and serial number of the inspected component, the findings of the inspection, any parts changed, and the references to the Airbus AOT revision used to perform the work.
Step 7 , Communicate with stakeholders: Notify lessors, customers, and other stakeholders of inspection status for particular airframes where contracts require status reporting. For operations relying on MMEL relief and the AD’s conditional exemption, ensure that documentation demonstrating removal or deactivation of the APU generator is available to auditors and lessor representatives.
Step 8 , Verify regulatory expectations post-action: Given the AD’s reliance on EASA ADs and Airbus AOTs, confirm with CASA or through your continuing airworthiness contact point whether any registration- or operator-specific reporting is required beyond the maintenance records,especially if corrective action has led to extended grounding or parts replacement. If in doubt about the adequacy of corrective actions relative to the AOT, seek clarification from CASA or the type certificate holder.
Step 9 , Consider risk to operations and plan minimisation: Because the compliance window is short, sequence inspections to minimise fleet downtime. Prioritise aircraft with heavier APU usage or those that have reported APU anomalies. For aircraft subject to Requirement 2, incorporate the pre-flight check into the normal dispatch checklist for the AD’s duration to avoid last-minute delays.
Step 10 , Maintain traceability to the AOT and EASA approvals: Keep a copy of the specific Airbus AOT revision used and any EASA approval record as part of the maintenance file for each aircraft inspected. If Airbus issues further revisions to the AOT that are EASA approved, track whether any further actions are required and whether CASA issues any supplementary guidance or further ADs.
Practical compliance note: The AD requires actions “in accordance with” the AOT and sets firm dates. Operators should treat the AOT plus the AD compliance schedule as the binding technical standard for the tasks described. If an operator believes an alternative method of compliance is justified, that pathway is not set out in the AD; any request for an alternative means of compliance should be made through the regulator using established CASA processes that are external to this AD text.