[2016] NSWLEC 154
Land and Environment Court (NSW)
2016-09-23
Moore J
Original judgment source is linked above.
TABLE OF CONTENTS Introduction The role of the Planning Assessment Commission The nature of these proceedings The evidence The original scope of the current Proposal Reviewing a PAC report The first PAC review The PAC documents relevant to the application for the current Proposal The conclusion and recommendation of the Second Review Report Ground 1 Introduction State Environmental Planning Policy (Sydney Drinking Water Catchment) 2011 Relevant extracts from the Second Review Report and associated documents Executive Summary 2.3 Project Surrounds 4.1.1 Compatibility with Other Land Uses (Clause 12) 4.2 Water and Subsidence 4.3 Impacts on Upland Swamps 4.4 Socio-Economic Benefits and Impacts Second Review Report's Conclusion The transmission letter The fact sheet Wollongong Coal's position on Ground 1 The Minister's position on Ground 1 Ground 1 - The first element Ground 1 - The Second element Wollongong Coal's complaint The Minister's responses Minister's response 1 - the PAC's consideration of the Drinking Water SEPP was consistent with Wollongong Coal's invitation Minister's response 2 - the PAC's consideration did not suggest it was a mandatory requirement that the proposal satisfy cl 10(1) of the Drinking Water SEPP Minister's response 3 - the PAC's conclusions in the Second Review Report demonstrate that the Drinking Water SEPP was but one factor considered by the PAC in a proper evaluation process Conclusion on Ground 1 Ground 2 Introduction The Second Review Report The First Review Report The PAC report on Modification 1 (Preliminary Works Project) Applicant's background material Consideration of Ground 2 Conclusion on Ground 2 Severability Conclusion Ground 1 Ground 2 Orders
Introduction
The role of the Planning Assessment Commission
The nature of these proceedings
The evidence
The original scope of the current Proposal
Reviewing a PAC report
The first PAC review
The PAC documents relevant to the application for the current Proposal
The conclusion and recommendation of the Second Review Report
Introduction
State Environmental Planning Policy (Sydney Drinking Water Catchment) 2011
Relevant extracts from the Second Review Report and associated documents
Executive Summary
2.3 Project Surrounds
4.1.1 Compatibility with Other Land Uses (Clause 12)
4.2 Water and Subsidence
4.3 Impacts on Upland Swamps
4.4 Socio-Economic Benefits and Impacts
Second Review Report's Conclusion
The transmission letter
The fact sheet
Wollongong Coal's position on Ground 1
The Minister's position on Ground 1
Ground 1 - The first element
Wollongong Coal's complaint
The Minister's responses
Minister's response 1 - the PAC's consideration of the Drinking Water SEPP was consistent with Wollongong Coal's invitation
Introduction
Project Application's Environmental Assessment
Annex O to the Environmental Assessment
Consideration of Wollongong Coal's own documents
Conclusion on Minister's first response
Minister's response 2 - the PAC's consideration did not suggest it was a mandatory requirement that the proposal satisfy cl 10(1) of the Drinking Water SEPP
2.3 Project surrounds
4.1.1 Compatibility with Other Land Uses (cl 12)
4.3 Impacts on upland swamps.
Conclusion of the Second Review Report
The transmission letter
The fact sheet
Conclusion on Minister's second response
Minister's response 3 - the PAC's conclusions in the Second Review Report demonstrate that the Drinking Water SEPP was but one factor considered by the PAC in a proper evaluation process
Conclusion on Ground 1
Introduction
The Second Review Report
The First Review Report
The PAC report on Modification 1 (Preliminary Works Project)
Applicant's background material
Consideration of Ground 2
Conclusion on Ground 2
Severability
Ground 1
Ground 2
Orders
DISCLAIMER - Every effort has been made to comply with suppression orders or statutory provisions prohibiting publication that may apply to this judgment or decision. The onus remains on any person using material in the judgment or decision to ensure that the intended use of that material does not breach any such order or provision. Further enquiries may be directed to the Registry of the Court or Tribunal in which it was generated. Decision last updated: 02 December 2016
Wollongong Coal Pty Ltd
Minister for Planning and Environment
(2009) 172 LGERA 338
(1985) 79 LGERA 367
(1986) 162 CLR 24
(2013) 249 CLR 332
(2009) 178 LGERA 347
(2003) 129 LGERA 195
(1998) 194 CLR 355