Wollongong Coal Pty Ltd v Minister for Planning and Environment
[2016] NSWLEC 154
At a glance
Source factsCourt
Land and Environment Court (NSW)
Decision date
2016-09-23
Before
Moore J
Catchwords
- [1986] HCA 40 Minister for Immigration and Citizenship v Li (2013) 249 CLR 332
- [2013] HCA 18 Rivers SOS Inc v Minister for Planning (2009) 178 LGERA 347
- [2009] NSWLEC 213 Terrace Tower Holdings Pty Ltd v Sutherland Shire Council (2003) 129 LGERA 195
Source
Original judgment source is linked above.
Catchwords
Judgment (56 paragraphs)
TABLE OF CONTENTS Introduction The role of the Planning Assessment Commission The nature of these proceedings The evidence The original scope of the current Proposal Reviewing a PAC report The first PAC review The PAC documents relevant to the application for the current Proposal The conclusion and recommendation of the Second Review Report Ground 1 Introduction State Environmental Planning Policy (Sydney Drinking Water Catchment) 2011 Relevant extracts from the Second Review Report and associated documents Executive Summary 2.3 Project Surrounds 4.1.1 Compatibility with Other Land Uses (Clause 12) 4.2 Water and Subsidence 4.3 Impacts on Upland Swamps 4.4 Socio-Economic Benefits and Impacts Second Review Report's Conclusion The transmission letter The fact sheet Wollongong Coal's position on Ground 1 The Minister's position on Ground 1 Ground 1 - The first element Ground 1 - The Second element Wollongong Coal's complaint The Minister's responses Minister's response 1 - the PAC's consideration of the Drinking Water SEPP was consistent with Wollongong Coal's invitation Minister's response 2 - the PAC's consideration did not suggest it was a mandatory requirement that the proposal satisfy cl 10(1) of the Drinking Water SEPP Minister's response 3 - the PAC's conclusions in the Second Review Report demonstrate that the Drinking Water SEPP was but one factor considered by the PAC in a proper evaluation process Conclusion on Ground 1 Ground 2 Introduction The Second Review Report The First Review Report The PAC report on Modification 1 (Preliminary Works Project) Applicant's background material Consideration of Ground 2 Conclusion on Ground 2 Severability Conclusion Ground 1 Ground 2 Orders