General information, not legal advice.
Fair Work Commission
2024-07-04
Original judgment source is linked above.
s.424 - Industrial action
Automotive, Food, Metals, Engineering, Printing and Kindred Industries Union" known as the Australian Manufacturing Workers' Union; and Communications, Electrical, Electronic, Energy, Information, Postal, Plumbing and Allied Services Union of Australia
Application to suspend or terminate protected industrial action (endangering life etc) - s.424 threatened, impending or probable - significant damage to an important part of the Australian economy - application granted - orders issued - written reasons
(a) A copy of the letter of instructions provided by the Australian Sugar Milling Council to Lawrence Consulting in respect of the February 2022 report 'Economic Impact of Queensland Sugar Manufacturing Industry 2020/2021'.
(b) A copy of the letter of instructions, including any associated materials or documents, provided to Lawrence Consulting in respect of the report 'Economic Impact of Wilmar Sugar and Qld Sugar Manufacturing Industry'.
(c) The data sources relied on in creating the above report.
(d) The modelling used in creating tables 11 and 12 of the above report.
(a) 24-hour full work stoppages on 9 May, 13 May, 21 May and 23 May 2024;
(b) During the week commencing 27 May 2024, there were one-hour stoppages at each mill, each day, which continued for approximately a week and a half;
(c) Partial day stoppages due to one-hour stoppages;
(d) Bans on the performance of overtime;
(e) Partial work bans; and
(f) A Technology ban at one of the eight mills.
Impacts of Protected Industrial Action in the Crushing Season
(a) The need to process all of the sugar juice through the factory until it has been converted into syrup due to the rapid deterioration of the juice when it contains a lot of water or impurities whereas the syrup can be stored in the medium term with minimal risk of degradation.
(b) During the processing of the sugar there is a substance called "massecuite" that requires specialist pumps to get it around the factory and when there is a shut down if it is not completely processed it can harden similar to cement and if it is not flushed out properly can cause damage to the equipment and is also a safety risk for staff who are required to remove the material from choked pipes or vessels.
Overview of the sugar industry in Australia and Queensland
(a) Crop crushed each year - approximately 32 million tonnes;
(b) Sugar produced each year - approximately 4.5 million tonnes;
(c) Sugar allocated to domestic consumption - approximately 1.0 million tonnes;
(d) Sugar allocated to export - approximately 3.5 million tonnes; and
(e) Industry revenue - historically this has been $1.5 billion to $2.5 billion (including coproduct sales). However, at prices for the 2024/25 season, industry revenue is likely to exceed $3.5 billion.[65]
Impacts of Protected Industrial Action in the Crushing Season
"the expert's contribution should not have the effect of supplanting the function of the tribunal deciding the issue before it, and the admissibility of the evidence depends upon proof of the factual basis of the opinion"
(f) He stated that depending upon how long the stop is going to be determines how long it takes to shut down the mill. For example, if it is going to be a short stop of an hour or two, then it can be shut down quickly. They are able to leave the product as is and then start it back up to continue crushing again. The startup could take from four to eight hours depending on whether the boilers have shut down and how much they cooled down;
(h) He provided the following rough estimates for the relevant steps in shutting down a mill:
- Workforce stops tipping bins into milling train and crushes the remaining product (approximately 25 minutes);
- Shut down the #2 boiler and drop off the #3 alternator (approximately 1 hour)
- Process the product in the evaporator vessels (approximately 2 hours);
- Process the products in the pans and shut down the injection water (approximately 2 hours);
- Process the products in the centrifugal (approximately 1 hour); and
(b) He provides the following information on shutting down the boilers:
- Once all the processes and necessary tasks are completed and the alternator is offline, the boiler station would take a maximum of 4 hours to cool down;
- A boiler can remain on idle for a few hours with a boiler operator and operator assistant;
- It takes approximately 4 hours to ensure a safe shutdown;
Significant Damage to the National Economy or an Important Part of It - Legal Principles and Case History
1. of much significance or consequence; an important event.
2. mattering much (fol. by to): details important to a fair decision.
3. of more than ordinary title to consideration or notice: an important example.
5. of considerable influence or authority, as a person, position, etc.[290]
"[40] ... Damage to the sugar industry cannot simply be measured in terms of the lost time related to the particular hours of the stoppage in the mills. Halting the crush has a domino effect that threatened to cause further unrecoverable losses. The sugar industry is seasonal and as such is dependent on perishable cane to be harvested and crushed in a specific time period for its optimal return. The flow-on effects from the sugar industry, being the major agricultural industry and employer in the area has considerable impact on that part of the economy and communities as was provided in the economic analysis presented. The proposed industrial action threatened to cause 'significant damage' to the seasonal employment, the completion of the crushing season and the associated contractual implications.
[44] On the evidence I was satisfied that the protected industrial action was threatening or would threaten significant damage on an important part of the Australian economy by compromising the crushing season at these mills. The impact of the industrial action would reduce the ability to harvest all of the season's cane at the required time at the optimum CCS, prior to the very real threat of rain shortening the available harvesting and crushing period. I have taken into account the very real possibility that the industrial action in combination with the impending weather conditions may result in cane being left in the fields unharvested, the crushing season being cut short and the implications of such for growers not being able to meet their contractual obligations and the potential for further losses to all parties being substantial."
"[7] Qantas produced material indicating that the protected action taken by the unions prior to 29 October had affected 70,000 passengers, led to the cancellation of 600 flights, the grounding of 7 aircraft, $70 million in damage. That protected action was associated with significant reductions in forward bookings and decline in market share."
"[9] We heard unchallenged evidence from Mr Mrdak, Secretary, Department of Infrastructure and Transport and Mr Clarke, Secretary, Department of Resources, Energy and Tourism as to the importance of airline passenger and cargo transport to the economy and the effect of the grounding of the Qantas fleet on the aviation and tourism industries. The tourism industry, including aviation, was estimated as contributing 2.6 per cent to GDP and as having 500,000 employees. The value of inbound tourism is estimated at $24 billion per year."
Minister for Industrial Relations for the State of Victoria and the AWU
"Although there has been limited analysis of the economic impact of the industrial action, the impact is quite clear. Ms Lourey estimates that each day's loss of gas production would cost the Victorian economy alone at the upper end of the range of $5-15m. If the industrial action continues for the period of the Notices, the loss to the Victorian economy is estimated to be in excess of $1.2b. These estimates are based on an estimated loss to Esso of $4.7m per day and a loss to gas consumers involved in manufacturing basic chemicals, glass and glass products, ceramic products, plaster and cement products of a further $9m."
Minister for Industrial Relations for the State of Victoria and AGL Loy Yang
"[41] The evidence establishes the fundamental importance and significance of AGL Loy Yang's Loy Yang A Power Station and Mine to Victoria's power supply. The combined generation of Loy Yang A and Loy Yang B, which is also supplied by the Mine, regularly meets over 50% of Victoria's power needs in Winter. The industrial action in the ETU Notice and the AGL Notice would almost immediately impact the power supply to Victoria and have implications for South Australia. Additionally, the reliability and resilience of the Victorian system would be compromised. The fundamental importance of the power supply to the operation of Victoria's economy is self-evident. Businesses rely on a secure energy supply, and the transportation system depends on reliable power. The supply of power is vital to the operation of the hospital and broader healthcare system, as was highlighted in the evidence of Dr Romanes and Mr Robinson."
"[46] This finding was supported by the NSW Treasury modelling that estimated that the cost to the NSW economy would have been in the order of $90 million. I note that this figure assumed no impact at all on the output of public sector workers, nor on the output of private sector workers who do not usually travel to work by train, even though many of them would have been affected by increased congestion on the roads. It also assumed that the output of the majority of private sector workers who do normally travel by train would have been unaffected. Moreover, the modelling only estimated the cost of the threatened overtime bans until 31 January 2018, even though they were of an indefinite nature. It is quite likely, in my opinion, that the cost to the economy, if the industrial action had gone ahead, would have been significantly more than $90 million modelled by Treasury. Such a loss of output would represent - in absolute terms - significant economic damage."
"The anchor term in s.424(1)(d) is "the Australian economy" - which directs the Commission's inquiry to whether there is a threat of damage to the whole Australian economy, or to a significant part of the Australian economy, or not.
The Commission must start with an economy-wide perspective. If necessary the inquiry might then narrow to only a "part" of the economy. In the authorities cited above the Commission considered the impact of protected industrial action nationally[304], across whole states[305], whole major cities[306] and across whole industries.[307]
Even though bargaining representatives have standing to make applications under s.424(1)(d)[308], including standing to apply for orders terminating their own conduct[309], the individual interests of the bargaining parties are secondary considerations at best. So much can be seen from the fact that relevant Commonwealth, State or Territory Ministers have standing to make an application under s.424.
In taking an economy-wide, state-wide or even industry-wide view the Commission must nonetheless hold to the objects of the FW Act generally, including "achieving productivity and fairness through an emphasis on enterprise level collective bargaining underpinned by simple good faith bargaining obligations and clear rules governing industrial action" (s.3(f))."
"In my view not all of the Full Bench's approach to s.426 applications in Woodside Burrup[310] is readily transposable to s.424 applications. If the "harm that might ordinarily flow from industrial action" or the "harm that is not out of the ordinary" nonetheless threatens to cause significant damage to the Australian economy or a significant part of it, then s.424 requires the Commission to make an order. There is no consideration of whether it is "appropriate" to do so (cf s.426(5)).
The observations in Woodside Burrup are apposite to circumstances where the damage caused by protected industrial action is likely to be large. Viewed in isolation, amounts measured in tens or hundreds of millions are substantial. Viewed in the context of the wider Australian economy and the context of the FW Act, such amounts may or may not be "significant".
Predictions and estimations of likely damage might have to be considered in both absolute and relative terms, depending on the circumstances and the available evidence. In most of the cases referred to above the estimated damage, in monetary terms, was very large - in fact multiples of $10M and even $100M. Damage might not be 'significant' even if it is large in absolute terms, because it might be only a minute fraction of a much larger economy, state or industry. Conversely, a large quantum of damage might nonetheless be seen as 'significant damage' even if the damage is small in relative terms. Ultimately such assessments can only be made on the material available.
It is also helpful to recognise the very tight timeframe within which the Commission must operate when determining applications under s.424. Section 424(3) requires the Commission to determine each application "as far as practicable" within five days after it is made.
In this regard the Commission's role is vastly different to a judicial body assessing [actual] damages. In almost all cases protected industrial action will cause damage. The Commission does not need to precisely quantify the likely damage, but there must be some proper basis upon which it can be satisfied that the damage would be significant (or not), over and above generalised predictions.[311] In assessing whether damage is "significant" the Commission can make an assessment of the order of magnitude of the potential damage.[312]"[313]
Has Threatened, is threatening or would threaten significant damage to ...
Significant damage to the Australian economy or an important part of it: the impact of the industrial action
"...It is an unremarkable feature of expert economic evidence that estimations and assumptions are applied to large sums of money..."[323] and
" ...There is no evidence to contradict or support Mr Houston's estimate that 5-10% of trade will be lost, and I am in no better position to provide an estimate than he is. In fact, in light of Mr Houston's experience and expertise, I am in a markedly inferior position to make such an estimate...."[324] and
"... However, I am able to forensically assess whether Mr Houston's estimate is a sufficiently sound basis to determine Svitzer's application under s.424. I do not have to determine the actual value of the threatened losses in the same way that a judge might have to calculate actual loss. From Mr Houston's evidence I can comfortably assess the order of magnitude of the potential damage.[325]..".[326]
(a) The meaning of the word probable, on its plain meaning means more than something that is already known but rather something that is likely to be;
Lost Revenue to Wilmar $3.754 million per day (approximately)
Loss Revenue to Canegrowers $5.405 million per day (approximately)
Total Lost Revenue $9.159 million per day (approximately)
Is the damage to an important part of the Australian economy?
"On many occasions the Commission has formulated orders under s.424 by reference to the history of bargaining between the parties and predictions or concerns about future bargaining. That is, in formulating orders under s.424 the Commission has considered matters well beyond the avoidance of the dangers described in s.424(1)(c) and well beyond the prevention of the damage described in s.424(1)(d)."[348]
"The suspension of the industrial action on the basis of the legislative criteria in s.424(1)(d) provides a cooling off period in this now protracted dispute. The short period of the suspension allows for the parties to have what now must be termed final negotiations in this matter, but also relieves the pressure on the employees (many of whom are particularly dependant on this seasonal employment), the growers to harvest their cane and the millers to progress the crush at this important stage whilst the CCS content is still maintained at suitable levels and prior to the prospect of rainfall. The leverage of the employees to then continue to take protected industrial action is maintained and it is anticipated that in this four week period, urgent discussions without the threat of industrial action from both sides, will bring about an agreement on the very few remaining issues between the parties."[350]
Mr J Murdoch KC for Wilmar. Instructed by Minter Ellison Lawyers
Mr C Massey for the CEPU, instructed by Hall Payne Lawyers
Mr L Saunders for the AMWU, instructed by Maurice Blackburn Lawyers
[3] Ibid s.424(1)(d).
[5] Transcript Day 2, Friday 28 June 2024, PN1719.
[7] [2021] FWCA 3319, AE511778
[16] Transcript Day 1, Thursday 27 June 2024, PN124.
[18] Transcript Day 1, Thursday 27 June 2024, PN129.
[38] Transcript Day 1, Thursday 27 June 2024, PN129-PN144.
[40] Exhibit A1 at [10]-[11], DCB p.252.
[53] Transcript Day 1, Thursday 27 June 2024, PN129-PN227, PN253 - PN259.
[54] Exhibit A2, DCB p.17 and Exhibit A3, DCB p.446.
[57] Ibid at [27] and EM10, DCB p.23 and 227-228.
[60] Transcript Day 1, Thursday 27 June 2024, PN129-PN227, PN306-PN322.
[62] Transcript Day 1, Thursday 27 June 2024, PN344.
[64] Ibid, DCB p.260 and DCB p.266 at [4] and MG1.
[77] Ibid [21]. See also Transcript Day 1, Thursday 27 June 2024, PN384.
[79] Transcript Day 1, Thursday 27 June 2024, PN370-372.
[81] Ibid MG3 as tended at hearing day 1 titled "The Bureau moves to La Nina watch".
[83] Ibid at [26] - [27], DCB p.263-264.
[84] Transcript Day 1, Thursday 27 June 2024, PN364.
[89] DCB p842. Exhibit A4 at [35] MG-5
[90] DCB p842-843 Exhibit A4 at [36]-[37]
[91] Transcript Day 1, Thursday 27 June 2024, PN387.
[94] Transcript Day 1, Thursday 27 June 2024, PN409.
[101] Transcript Day 2, Friday 28 June 2024, PN507.
[105] Transcript Day 2 28 June 2024 PN1396-PN1420.
[109] Ibid PN1489-PN1492, PN1513-PN1514.
[110] Closing submissions of the AWU at [61].
[111] Mineralogy Pty Ltd v Sino Iron Pty Ltd and Ors [2015] FCA 825; 329 ALR 1 {32].
[112] Construction, Forestry, Maritime, Mining and Energy Union, Mt Matthew Howard v Mt Arthur Coal Pty Ltd T/A Mt Arthur Coal [2021] FWCFB 6059; (2021) 310 IR 399 (Mt Arthur Coal). At [37].
[113] See paragraph [9] of this decision. See also Transcript Day 2 28 June 2024 PN474-PN489.
[116] Transcript Day 2, 28 June 2024 PN1170.
[148] Transcript Day 2, Friday 28 June 2024, PN590-PN591.
[154] Ibid at PN632 and PN664 and PN690.
[172] Transcript Day 2, Friday 28 June 2024, PN869-PN872.
[184] Transcript Day 2, Friday 28 June 2024, PN922-923
[203] Transcript Day 2, Friday 28 June 2024, PN974-979
[216] Transcript Day 2, Friday 28 June 2024, PN1036-1048
[221] Exhibit R5 at [1]-[3], DCB p.566.
[230] Exhibit R5, DCB p.979 at [10].
[231] Transcript Day 2 28 June 2024, PN 513-517.
[235] Exhibit R5, MM3 at [27] to [33], DCB pp.982-983. See also Exhibit A5 at [20(b)], DCB p.16.
[244] Transcript Day 2, Friday 28 June 2024, PN1616-1620.
[252] Exhibit R11 at [18(a)] -[18(h)], DCB p.478 and Exhibit R11 at [21], DCB pp.479-480.
[257] Transcript day 2, 28 June 2024, PN1738
[263] DCB, p226-227, last full sentence.
[264] Exhibit R12, DCB p 462 at [1]-[4].
[272] Transcript Day 2, Friday 28 June 2024, PN1884-1886.
[278] Transcript Day 2 28 June 2024 at PN1959.
[287] Ambulance Victoria v Liquor, Hospitality and Miscellaneous Union [2009] FWA 44 (Kaufman SDP, 3 August 2009) [29], [(2009) 187 IR 119].
[288] State of Victoria - Department of Human Services v Health Services Union [2012] FWA 8376 (Gregory C, 4 October 2012) [80], [(2012) 225 IR 306].
[289] Sucrogen Australia Pty Ltd v The Australian Workers' Union; "Automotive, Food, Metals, Engineering, Printing and Kindred Industries Union" known as the Australian Manufacturing Workers' Union (AMWU); Communications, Electrical, Electronic, Energy, Information, Postal, Plumbing and Allied Services Union of Australia [2010] FWA 6192 (Spencer C, 27 August 2010) [10] (Sucrogen); citing The New Shorter Oxford English Dictionary.
[290] BHP Coal Pty Ltd; Hay Point Services Pty Ltd v Construction, Forestry, Mining and Energy Union; Communications, Electrical, Electronic, Energy, Information, Postal, Plumbing and Allied Services Union of Australia; and Automotive, Food, Metals, Engineering, Printing and Kindred Industries Union PR903492 (AIRC, Bacon C, 17 April 2001) [38]; citing the Macquarie Dictionary (2nd Revised Edition).
[293] Transcript Day 3, Sunday 30 June 2024, PN2024.
[294] See Sucrogen at [7] and Exhibit A at [3] DCB p.252.
[295] Ibid at [18] - [19] and Exhibit A4 at [4]-[9] DCB p.260-261.
[297] On judicial review in Australian and International Pilots Association v Fair Work Australia (2012) 202 FCR 200, [2012] FCAFC 65 at [67]- [70], [129] and [176]-[180] the Full Court found that on the Full Bench's findings "no order could be made terminating or suspending the protected industrial action being engaged in by any of the unions." The Full Court ultimately did not disturb the Full Bench's order because they found that the order terminating Qantas' protected industrial action was properly made, and by reference to s.413(7) found that "the effect of the FWA order meant that neither side was able to engage in the industrial action which it had with the immunity offered by s 415" (at [90]).
[299] Esso Australia Pty Ltd v Australian Manufacturing Workers' Union (2018) 281 IR 147, [2018] FWCFB 4120.
[301] Re Sydney Trains (2018) 277 IR 389, [2018] FWC 632.
[304] Re Minister for Tertiary Education, Skills, Jobs and Workplace Relations (2011) 214 IR 367, [2011] FWAFB 7444.
[305] Minister for Industrial Relations for the State of Victoria v Australian Workers' Union & Ors [2016] FWC 8826, Minister for Industrial Relations for the State of Victoria v AGL Loy Yang Pty Ltd & Ors [2017] FWC 2533 and Application by BP Refinery (Kwinana) Pty Ltd [2019] FWC 68.
[306] Sucrogen Australia Pty Ltd v The Australian Workers' Union and others [2010] FWA 6192 and Re Sydney Trains (2018) 277 IR 389, [2018] FWC 632.
[307] Sucrogen Australia Pty Ltd v The Australian Workers' Union and others [2010] FWA 6192 and Re Minister for Tertiary Education, Skills, Jobs and Workplace Relations (2011) 214 IR 367, [2011] FWAFB 7444.
[309] Australian and International Pilots Association v Fair Work Australia (2012) 202 FCR 200, [2012] FCAFC 65 at [93]- [94] and [173] and Schweppes Australia Pty Ltd v United Voice (2011) 214 IR 282 at 294, [2011] FWA 9329 at [57].
[311] Coal and Allied Operations Pty Ltd v AIRC (2000) 203 CLR 194 at 208, (2000) 99 IR 309 at 317, [2000] HCA 47 at [28].
[312] See by analogy Construction, Forestry, Mining and Energy Union v Woodside Burrup Pty Ltd [2010] FWAFB 6021; (2010) 198 IR 360 at 376-377, [2010] FWAFB 6021 at [47].
[313] [2022] FWC 493 [55]-[58] and [63]-[67].
[314] Exhibit A2, EM14, DCB pp.233-241.
[315] Exhibit A4, MG3, see also my assessment of the evidence of Mr Greenwood at [54].
[316] Exhibit R1, referenced in this decision at [67](d) to (f).
[318] Mr Bryce Caltabiano Transcript Day 2, Friday 28 June 2024, PN936; see also Mr Scott Power Transcript Day 2, Friday 28 June 2024, PN596-PN600.
[320] BHP Coal Pty Ltd & Anor v CFMEU & Ors at [40]
[325] See by analogy Construction, Forestry, Mining and Energy Union v Woodside Burrup Pty Ltd [2010] FWAFB 6021; (2010) 198 IR 360 at 376-377, [2010] FWAFB 6021 at [47].
[326] [2022] FWC 493 [81].
[327] Transcript Day 3, 30 June 2024 at PN2012
[328] Exhibit A2 at [16]-[22], DCB p.22.
[329] See paragraph [42] in this decision in respect of Mr Motti's evidence.
[330] Motti A2 [13(z)] DCB p.21 and A2 at EM11 DCB p.227-228. See also Email from Mr Marano DCB p.547.
[331] Exhibit R1 at [44], DCB p.559.
[332] Exhibit A1 at [25], DCB p.257.
[333] Exhibit A1 at [25], DCB p.257.
[335] Transcript Day 1, Thursday 27 June 2024, PN428.
[341] ExhibitA4 at [18], DCB pp.262-263.
[342] Australian and International Pilots Association v Fair Work Australia [2012] FCAFC 65 [92].
[343] Transcript Day 3, Sunday 30 June 2024, PN2213-2215.
Printed by authority of the Commonwealth Government Printer
Wilmar Sugar Pty Ltd
Australian Workers' Union; Automotive, Food, Metals, Engineering, Printing and Kindred Industries Union" known as the Australian Manufacturing Workers' Union; and Communications, Electrical, Electronic, Energy, Information, Postal, Plumbing and Allied Services Union of Australia [2024] FWC 1767
(2011) 214 IR 367
(2021) 310 IR 399
(2009) 187 IR 119
(2012) 225 IR 306
(2012) 202 FCR 200
(2018) 281 IR 147
(2018) 277 IR 389
(2011) 214 IR 282
(2000) 203 CLR 194
(2000) 99 IR 309
(2010) 198 IR 360