[2014] VCAT 1558
General information, not legal advice.
Victorian Civil and Administrative Tribunal
2014-12-16
Original judgment source is linked above.
The practice of VCAT is to designate cases of interest as 'Red Dot Decisions'. A summary is published and the reasons why the decision is of interest or significance are identified. The full text of the decision follows. This Red Dot Summary does not form part of the decision or reasons for decision.
H. McM. Wright QC, Senior Member and Elizabeth Bensz, Member
REASONS WHY DECISION IS OF INTEREST OR SIGNIFICANCE
Interpretation of legislation which expropriates an interest in land without compensation.
LEGISLATION - interpretation or application of statutory provision
Section 60(2) Planning and Environment Act and cl.52.02 Port Phillip Planning Scheme
PLANNING SCHEME - interpretation or consideration of VPP provision
ANALYSIS - exposition of how to asses an issue or matters to consider
APPLICATION - significant, interesting or unusual use or development; application of policy, provision or principle; or circumstances
Section 79 Planning and Environment Act 1987; complex case; application to remove or vary restrictive covenants; tests under clause 60 (2) and clause 52.02, impact to beneficiaries of removal of covenant; planning history; status of amendment C104.
Patricia Goldie, William DeBruyn, David Viney, Jillian Maddox, Roger Joyce, Ian and Sue Whiting, Trevor Nink, Lloyd Bunting, Kevin and Stephanie Armstrong, Sally Cessford, William Warren Fisher, Eddie Micallef, Gerhard Correa, Ian Close, The T Group Pty Ltd, Elizabeth and Glen Morrison Mirvac Victoria Pty Ltd, Mirvac (Beacon Cove) Pty Ltd and others
Waterfront Place Pty Ltd v Port Phillip CC (Includes Summary) (Red Dot) [2014] VCAT 1558
Mr Adrian Finanzio, SC with Ms Maria Foley instructed by Rigby Cooke Lawyers. They called;
Mr Ian Pitt SC of Best Hooper, solicitors. He called :
For Mirvac Victoria Pty Ltd and Mirvac (Beacon Cove) Pty Ltd:
Ms Susan Brennan SC and Ms Jennifer Trewhella instructed by Norton Rose Fulbright.
The other respondents appeared in person with Mr Gerhard Correa representing himself, Mr William DeBruyn, Mr David Viney, and Ian and Sue Whiting.
To vary or remove restrictive covenants that apply to 1-5 Waterfront Place (Lot 3) and 7-9 Waterfront Place (Lot 2).
Application under section 79 Planning and Environment Act 1987 to review the failure of the responsible authority to grant a permit within the prescribed time.
Clause 37.02 Comprehensive Development Zone Schedule 1
Clause 42.01 Environmental Significance Overlay Schedule 4
Nos. 1-9 Waterfront Place are located near the entrance to the Beacon Cove Estate from Beach Street and comprise two lots (Lot 2 and Lot 3) on Plan of Subdivision No. 344 341D with a total area of 5,487 square metres.
The site is currently occupied by a single storey brick building with terracotta tiled roofing, two outdoor tennis courts and some car parking. The buildings that are currently vacant were previously used a child care centre and gymnasium including an indoor pool. However having been damaged by fire this part of the building has been removed.
To the west the site is adjacent to the historic Port Melbourne Railway Station building that is used as a medical centre, the light rail tram terminus at Station Pier, local shops and restaurants the Bay Trail and Port Melbourne Beach.
Further to the west on the waterfront there are five apartment buildings ranging in height between 10 and 14 stories.
North of the site on the opposite side of Beach Street are a row of dwellings ranging from one to three storeys in height which form part of the Beacon Cove Estate.
To the east along Beach Street are a number of high rise apartment buildings up to ten storeys which comprise mixed use developments within the Port Melbourne mixed use area.
To the south on the foreshore is Station Pier, the berthing point of the Spirit of Tasmania and cruise ships from overseas.
An independent Tribunal inspection was undertaken by the members on 16 November and 6 December 2014.
Tulk v Moxhay (1948) 41 ER 1143
Hill v Campaspe Shire Council [2011] VCAT 949
271 William Street Pty Ltd v City of Melbourne [1975] VicRp 15; 1975 VR 156
Briginshaw v Briginshaw [1938] HCA 34; (1938) 60 CLR 336
Pletes v City of Knox and Minister for Planning (1993) 10 AATR 155
McFarlane v City of Greater Dandenong [2002] VCAT 696
Carabott v Hume City Council (1992) 22 AATR 261
Giosis v Darebin City Council [2013] VCAT 825
Charan v Wyndham City Council [2014] VCAT 219
A & K Corporation Pty Ltd v Darebin City Council [2014] VCAT 178
Tsourounak Ice v Darebin City Council [2014] VCAT 224
Singh v Darebin City Council [2014] VCAT 1169
Imbrogno v Boroondara City Council [2014] VCAT 163
Vrakas and Mills (2006) VSC 463
Lento v Whittlesea City Council [2004] VCAT 2101
Kyriacko v Law Institute of Victoria Limited (2014) VSCA 322
Neat Holdings Pty Ltd v Karajan Holdings Pty Ltd [1992] HCA 66; (1992) 67 ALJR 170
shall not, except with the written consent of Mirvac (Beacon Cove) Pty Ltd ACN 066 913 497 (Mirvac) or its nominee:
(a) demolish or permit to be demolished any building or part of a building or improvement or part of an improvement on the Burdened Land constructed by or for Mirvac unless the building or part of the building or improvement or part of the improvement is replaced by a building or part of a building or improvement or part of an improvement respectively built in accordance with the plans and specifications prepared by H.P.A. Architects Pty Ltd ("Mirvac's Architects") and lodged with the City of Port Phillip as at the date hereof;
(b) erect or permit to be erected on the Burdened Land any building or improvement where a building or improvement has been erected by or for Mirvac other than in accordance with existing plans and specifications prepared by Mirvac's Architects and lodged with the City of Port Philip as at the date hereof;
(c) add or permit to be added any extension or make or permit to be made any structural alteration to any building or improvement constructed on the Burdened Land by or for Mirvac other than in accordance with existing plans and specifications prepared by Mirvac's Architects lodged with the City of Port Phillip as at the date hereof;
(d) paint, render or otherwise alter or permit to be painted, rendered or otherwise altered the external facade of any building or improvement on the Burdened Land other than in colours the same or similar to those which any such building or improvement on the Burdened Land was painted, rendered or otherwise finished by or for Mirvac;
(e) permit any laundry or other clothing to be dried or aired on the Burdened Land other than within the building constructed on the Burdened Land by or for Mirvac;
(f) except as required by law, place, erect or in any way affix, or permit to be placed, erected or in any way affixed on or to any part of the Burdened Land any advertising, hoarding or other structure which is intended or is suitable for the display of advertisements or notices nor use or permit the Burdened Land to be used for display of advertising or notices unless the advertising, hoarding or other structure:
(i) is no greater than 1300mm in width and 550mm in height; and
(ii) is erected or affixed above the entrance to the building on the Burdened Lot and at a height not exceeding 4000mm above the ground; and
(iii) is to the satisfaction of the authority responsible or (sic)administering the planning scheme applying in relation to the Burdened Land;
(g) subdivide or permit the subdivision of the Burdened Land; and
(h) use or permit the Burdened Land to be used as a dwelling or for the habitation or accommodation of persons otherwise.
PRO VTDED THAT none of the foregoing restrictions are intended nor shall they be construed as preventing any internal modifications to the building referred to therein which do not alter or affect the external appearance of any such building.
VARIATION OF COVENANT-COUNCIL ADOPTION ALTERNATIVE
That the restriction contained in Plan of Subdivision PS344341D be modified as follows:
"4. The Covenantor shall not construct any building on the Burdened Lot which is not in accordance with clause 3(a) to (g) hereof UNLESS such building is contained wholly within the building envelopes depicted in the plans annexed hereto and prepared by Bosco Jonson Pty Ltd dated 22/9/2014. For the avoidance of doubt, if the Covenantor elects to construct a building in accordance with this clause, no other restriction contained in this instrument applies including, but not limited to, the requirement to obtain Mirvac's consent."
VARIATION OF COVENANT - COUNCIL ADOPTION ALTERNATIVE
That the restrictive covenant contained in Instrument of Transfer W413729L, be modified as follows:
"Amendment A The Covenantor shall not construct any building on the Burdened Land which is not in accordance with paragraph (a) to (h) hereof UNLESS such building is contained wholly within the building envelopes depicted in the plans annexed hereto and prepared by Bosco Jonson Pty Ltd dated 22/9/2014. For the avoidance of doubt, if the Covenantor elects to construct a building in accordance with this clause, no other restriction contained in this instrument applies including, but not limited, to the requirement to obtain Mirvac's consent."
VARIATION OF COVENANT - COUNCIL AOOPTION ALTERNATIVE
That the restrictive covenant contained In Instrument of Transfer V074097S be modified as follows:
"Amendment A The Covenantor shall not construct any building on the Burdened Land which is not in accordance with paragraph (a) to (g) hereof UNLESS such building is contained wholly within the building envelopes depicted in the plans annexed hereto and prepared by Bosco Jonson Ply Ltd dated 22/9/2014. For the avoidance of doubt, if the Covenantor elects to construct a building in accordance with this clause, no other restriction contained in this Instrument applies including, but not limited, to the requirement to obtain Mirvac's consent."
Where relevant, planning and responsible authorities must consider and apply the strategy 'Plan Melbourne'; metropolitan planning strategy (Department of Transport Planning and local infrastructure 2014).
(2) The responsible authority must not grant a permit which allows the removal or variation of a restriction (within the meaning of the Subdivision Act 1998) unless it is satisfied that the owner of any land benefited by the restriction (other than an owner who, before or after the making of the application for the permit but not more than three months after its making, has consented in writing to the grant of the permit) will be unlikely to suffer -
(c) loss arising from change to the character of the neighbourhood; or
as a consequence of the removal or variation of the restriction.
To enable the removal and variation of an easement or restrictions to enable a use or development that complies with the planning scheme after the interests of affected people are considered.
Before deciding on an application, in addition to the decision guidelines in clause 65, the responsible authority must consider the interests of affected people.
Except upon criminal issues to be proved by the prosecution, it is enough that the affirmative of an allegation is made out to the reasonable satisfaction of the tribunal. But reasonable satisfaction is not a state of mind that is attained or established independently of the nature and consequence of the fact or facts to be proved. The seriousness of an allegation made, the inherent unlikelihood of an occurrence of a given description, or the gravity of the consequences flowing from a particular finding are considerations which must affect the answer to the question whether the issue has been proved to the reasonable satisfaction of the tribunal.
Nevertheless, those principles reflect common sense notions of probability with respect to human conduct and it is entirely proper for the Tribunal to take them into account when considering allegations of serious misconduct.
[T]he strength of the evidence necessary to establish a fact or facts on the balance of probabilities may vary according to the nature of what it is sought to prove.
The expression "any other material detriment" in Section 60(2)(d) qualifies the loss mentioned in each of the sub-sections (a), (b) and (c) with the result that the loss referred to in each means material loss. (Russel, Crimmin, Harvey). Further the word "material" in this section means "important detriment, detriment of such consequence viewed on an objective basis. It does not include trivial or inconsequential detriment" (Russell, Harvey). We add that the word conveys to us the connotation of "real and not fanciful detriment" (Stokes). It is to be contrasted with the somewhat wider meaning of the use of the word "material" in Section 52 of the Act (Tjorpatsis).
In performing the exercise required by Section 60(2) it seems to us essential to look at the purpose and effect of the covenant as one of the factors relevant in determining the likelihood of any loss or detriment in the event of removal or variation.
[17] Unlike many applications for a variation of a restrictive covenant the present applicant has not concurrently sought approval for any particular form of development. This makes it difficult for the responsible authority to be satisfied as required by paragraph (a) because it must consider all possible forms of three unit multi-dwelling development and conclude that it is unlikely that any of them would cause detriment to a benefitting owner.
[14] The Applicant has not persuaded me that the removal of the covenant will satisfy the requirements of section 60(2) of the Act. This is because an application for the complete removal of a restrictive covenant places in issue "every possible detriment of every possible development enabled by the removal". The absence of a concurrent development makes it very difficult for me to be satisfied that every possible form of development will be unlikely to cause the types of losses specified in section 60(2) of the Act. Accordingly, I consider that the removal application is barred by section 60(2).
Loss Arising From a Change of Neighbourhood Character
To enable the removal and variation of an easement or restrictions to enable a use or development that complies with the planning scheme after the interests affected people are considered.
To have regard to any amendment to a planning scheme which has been adopted by the planning authority but not, as at the date on which the application for review is determined, approved by the Minister or the planning authority.
1.1 delete the words "except with the written consent of Mirvac (Beacon Cove) Pty Ltd ACN 066 913 497 (Mirvac) or its nominee";
1.2 delete paragraphs (a) to (h) inclusive and the proviso and substitute the following:
(a) construct, add to or extend any building on the Burdened Land unless such building is contained wholly within the building envelopes depicted in the plans annexed hereto and prepared by Bosco Jonson Pty Ltd Ref. 26828 dated 19 September 2014;
(b) permit any laundry or other clothing to be dried or aired on the Burdened Land other than within a building constructed on the Burdened Land.
2.1 delete the words "except with the written consent of Mirvac (Beacon Cove) Pty Ltd ACN 066 913 497 (Mirvac) or its nominee";
2.2 delete paragraphs (a) to (g) inclusive and substitute the following:
(a) construct, add to or extend any building on the Burdened Land unless such building is contained wholly within the building envelopes depicted in the plans annexed hereto and prepared by Bosco Jonson Pty Ltd Ref. 26828 dated 19 September 2014;
(b) permit any laundry or other clothing to be dried or aired on the Burdened Land other than within a building constructed on the Burdened Land.
Waterfront Place Pty Ltd
Port Phillip CC
(1938) 60 CLR 336
(1992) 67 ALJR 170