[2018] VCAT 1531
General information, not legal advice.
Victorian Civil and Administrative Tribunal
2018-10-09
Mr J
Original judgment source is linked above.
Domestic building - section 9 Domestic Building Contracts Act 1995 - warranties provided by a builder to subsequent owners - whether warranties may be limited by liability of original owner to builder under original building contract - whether the builder may elect to set off amounts owed by original owner against any breaches of warranties under section 9 - interpretation of section 9 - Delic & Ors v Yahome Pty Ltd [2012] VCAT 752 - Owners of Strata Plan 80458 v TQM Design & Construct Pty Ltd [2018] NSWSC 1304 - breach of natural justice to make a determination affecting the rights of a non party - failure to prove on the balance of probabilities that the original owner was liable to the builder - claims for defective work - Multipanel Balcony Substrate Waterproofing System - requirements for thermal breaks in the Building Code of Australia.
JG King Project Management Pty Ltd (ACN 095 695 079)
16, 17, 18, 20 July and written submissions received 24 July, 13 August, 13 and 20 September 2018
Waddell v JG King Project Management Pty Ltd (Building and Property) [2018] VCAT 1531
The interpretation of section 9
In addition to the building owner who was a party to a domestic building contract, any person who is the owner for the time being of the building or land in respect of which the domestic building work was carried out under the contract may take proceedings for a breach of any of the warranties listed in section 8 as if that person was a party to the contract [emphasis added].
40. In my view, a settlement agreement between an original owner and its contracting builder could affect the rights of a subsequent owner. Although s.9 of the Act gives a subsequent owner rights commensurate with the rights of the original contracting party, it does not create rights greater than the rights of that original contracting party. Therefore one must look at the rights of the original contracting party to determine the rights of the current applicants.
41. If the vendor compromised her rights with respect to certain defects, then I do not accept that a subsequent owner is able to reignite those rights in reliance upon s.9 of the Act. In my view, the final words in s.9 of the Act, which state "as if that person was a party to the contract" are words which limit the operation of s.9 to effectively put a subsequent owner into the shoes of the original contracting party. Therefore if the original contracting party has compromised its ability to claim for breach of a warranty, then subject to s.10 of the Act, no further action lies against a builder in respect of that particular breach. To construe s.9 in any other way would, in my opinion, be tantamount to restricting rights which crystallise upon there being an accord and satisfaction of a suit. Those rights comprise the right to be free of liability in respect of the matters so compromised. Had the legislature intended s.9 to take away or alter those common law rights, it could have drafted s.9 with clear and express words to that effect."
Therefore if the original contracting party has compromised its ability to claim for breach of a warranty, then subject to s.10 of the Act, no further action lies against a builder in respect of that particular breach.
10. Person cannot sign away a right to take advantage of a warranty
A provision of an agreement or instrument that purports to restrict or remove the right of a person to take proceedings for a breach of any of the warranties listed in section 8 is void to the extent that it applies to a breach other than a breach that was known, or ought reasonably to have been known, to the person to exist at the time the agreement or instrument was executed.
Owners of Strata Plan 80458 v TQM Design & Construct Pty Ltd
(1) A person who is a successor in title to a person entitled to the benefit of a statutory warranty under this Act is entitled to the same rights as the person's predecessor in title in respect of the statutory warranty.
(1A) A person who is a non-contracting owner in relation to a contract to do residential building work on land is entitled (and is taken to have always been entitled) to the same rights as those that a party to the contract has in respect of a statutory warranty.
(1B) Subject to the regulations, a party to a contract has no right to enforce a statutory warranty in proceedings in relation to a deficiency in work or materials if the warranty has already been enforced in relation to that particular deficiency by a non-contracting owner.
(2) This section does not give a successor in title or non-contracting owner of land any right to enforce a statutory warranty in proceedings in relation to a deficiency in work or materials if the warranty has already been enforced in relation to that particular deficiency, except as provided by the regulations.
"202. TQM puts that where s.18D(1) provides that the plaintiffs, as successors in title to the benefit of the statutory warranties, are entitled to the same rights as PVD in respect of the statutory warranties, this means that the plaintiffs are put in the same position as PVD under the contract between them which incorporates the statutory warranties.
b) Should the glass sliding doors be removed and replaced?
c) and d) How to treat the upright support posts, and how to rectify the span of the balustrades?
3) External rear garage wall and ceiling - flashing missing
c) The cause of the moisture damage inside bedroom 3
5) Water damage plasterboard wall lining garage door opening
Garage door opening repair, less cost of door removal
(i) has lightweight external cladding such as weatherboards, fibre cement or metal sheeting fixed to the metal frame; and
(ii) does not have a wall lining or has a wall lining that is fixed directly to the metal frame,
must have a thermal break, consisting of a material with an R-Value of not less than 0.2, installed between the external cladding and the metal frame.
A thermal break may be provided by materials such as timber battens, plastic strips or polystyrene insulation sheeting. The material used as a thermal break must separate the metal frame from the cladding and achieve the specified R-Value.
For the purposes of 3.12.1.4(b)(ii), expanded polystyrene strips of not less than 12 mm thickness ... are deemed to achieve an R-Value of not less than 0.2. [Emphasis added]
For reasons which will be provided in due course, I determine that the Building Code of Australia 2009 (which is the applicable Code for this property) requires there to be a "thermal break" in the areas of the two skillion roofs. The parties have agreed that a reasonable cost to remedy this item is $3484.35 (excluding margin, contingency, GST).
(i) is required to achieve a minimum Total R-Value; and
(ii) has metal sheet roofing fixed to metal purlins, metal rafters or metal battens; and
(iii) ... has a ceiling lining fixed directly to those metal purlins, metal rafters or metal battens (see Figure 3.12.1.1(b)),
must have a thermal break, consisting of a material with an R-Value of not less than 0.2, installed between the metal sheet roofing and its supporting member.
(d) A roof, or roof and associated ceiling, is deemed to have the Total R-Value required by Table 3.12.1.1 if it complies with Figure 3.12.1.1.
Irrespective of the framing material used, the minimum added R-Value specified in Figures 3.12.1.1, ... is deemed to include the effect of thermal bridging created by framing members in situations other than described in 4.
Because of the high thermal conductance of metal, a thermal break is to be provided where the ceiling lining of a house is fixed directly to the underside of the metal purlins or metal battens of a metal deck roof... The purpose of the thermal break is to ensure that the thermal performance of this form of roof construction is comparable to that of a similar roof with timber purlins or timber battens.
A thermal break may be provided by materials such as timber, expanded polystyrene strips, plywood or compressed bulk installation. The material used as a thermal break must separate the metal purlins or metal battens from the metal deck roofing and achieve the specified R-Value.
Diagrams in the Housing Provisions are used to describe specific issues reference [sic] in the associated text. They are not to be construed as containing all design information that is required for that particular building element or situation.
Diagrams are used to explain the requirements of a particular clause. To ensure the context of the requirement is clearly understood, adjacent construction elements of the building that would normally be required in that particular situation are not always shown. Accordingly, aspects of a diagram that are not shown should not be interpreted as meaning these construction details are not required. [Emphasis added]
"...the interpretation of BCA diagrams is often problematic. In regards to the BCA interpretation hierarchy, a diagram is used to explain the requirements of a particular clause. The diagrams cannot be interpreted in isolation of the initiating clause. The correct steps for reading a diagram are as follows:
Step 2 refer to the diagram to interpret the requirements of that clause..."[16] [Emphasis added]
"The BCA requirements for roofs include a number of important concepts that must be understood as follows: ...
(c) subclause (c) introduces a requirement for a thermal break when a metal roof is fixed directly to a metal frame. This is to reduce the effect of thermal bridging which travels through the metal components and can have a significant impact on the effectiveness of the roof insulation. The thermal break material must achieve the required R-Value and essentially acts as a buffer to slow the transfer of heat from the inside to outside of the building. A thermal break is not required where a suspended ceiling lining has been installed or the ceiling lining is fixed to timber battens."[17] [Emphasis added]
These elements of the Housing Provisions are non-mandatory. They are used to provide additional guidance on the application of the particular Parts and clauses and do not need to be followed to meet the requirements of the Housing Provisions. The ABCB gives no warranty or guarantee that the Explanatory Information is correct or complete..." [Emphasis added]
Accordingly, to the extent that the Explanatory Information contradicts he clause, I prefer the meaning of the clause.
7) Sarking membrane - inadequate installation
Gas supply pipe, exhaust fans in bathroom and toilet, rangehood
Gas supply pipe, exhaust fans in bathroom and toilet, rangehood
[1] I use the word "novel" to mean new and original, not in the sense of fictional
[2] Mr Waddell witness statement at [90]
[3] Respondent's opening submissions and written submissions received prior to the decision in Owners of Strata Plan 80458 v TQM Design & Construct Pty Ltd [2018] NSWSC 1304 referred to below
[10] Mr Maher and Mr Ryan also gave extensive evidence about the doors, subsills, flashings and membranes if the traditional method of rectification using a liquid membrane were adopted. I have not considered this evidence further, as I have not accepted that method of rectification.
[13] BCA volume 2 definition of "envelope"
[14] [1954] HCA 36; (1954) 90 CLR 613 at p.620
[18] As a separate amount has been allowed as the contingency for this item, I have not used the agreed figure of 41%, but instead used the experts' original figure for margin and overheads of 35%.
Waddell
JG King Project Management Pty Ltd
(1954) 90 CLR 613