[2015] VCAT 1638
General information, not legal advice.
Victorian Civil and Administrative Tribunal
2015-10-14
Original judgment source is linked above.
Does the development respond to its built form and policy contexts?
Notwithstanding the word existing in the objective at clause 22.07-2, where an application triggers Clauses 54 or 55, the relevant Neighbourhood Character Precinct Statement is directed to be considered by Clause 22.07-3. Further in many instances the aim in many of the statements is to maintain valued features of an area, not to steer a new character. Therefore I do not consider that the NCSPS are limited to a reference document. Rather they are given a role in terms of the purpose of the NRZ, application of clause 22.07 and consideration of the objectives of clause 55.
Would the development impose unacceptable amenity impacts on its neighbours?
Would the development provide acceptable amenity for its future residents?
(a) A survey (including botanical names) of all existing trees to be retained and of those to be removed. The intended status of the trees shown on the landscape plan must be consistent with that depicted on the development layout plan;
(b) Details of the surface finish of all pathways, paved areas and accessways;
(c) A planting schedule of all proposed trees, shrubs and ground covers including botanical names, common names, pot sizes, sizes at maturity and the quantities of each plant;
(d) One canopy tree (planted at 2 metres high and capable of reaching a height of 8 metres at maturity) in each dwelling's front setback;
(e) Appropriate screen planting, capable of reaching a mature height of at least 4 metres at maturity) along the rear (western) boundary. Such planting must be of a species with non-invasive roots;
(f) Landscaping and planting within all open areas of the site.
The recommendations contained in the approved tree management plan must be implemented to the satisfaction of the responsible authority.
The responsible authority may extend the times referred to if a request is made in writing before the permit expires or:
(i) within six (6) months afterwards if the development has not commenced; or
(ii) within twelve (12) months afterwards if the development has not been completed.
Council and the Victorian Civil and Administrative Tribunal are unable to approve requests outside of the relevant time frame.
[1] I have considered the submissions of all the parties that appeared, all the written and oral evidence, all the exhibits tendered by the parties, and all the statements of grounds filed. I do not recite or refer to all of the contents of those documents in these reasons.
[2] Clause 21.07 Framework Plan Residential
Tzanatos
Boroondara CC [2015] VCAT 1638