PROPERTY LAW - Repudiation by anticipatory breach - Contract for sale of apartments - Where vendor and purchaser at impasse as to contractual requirements - Where purchaser sent email repudiating contract - Where vendor accepted purchaser's repudiation and terminated contract - Whether vendor was ready, willing and able to complete contract - Vendor was ready, willing and able notwithstanding unresolved dispute as to contractual requirements - Whether vendor should be estopped from accepting repudiation - No estoppel arises - Whether vendor made election to affirm the contract - Where vendor continued to build apartments after receiving repudiatory email - Vendor did not affirm contract - Vendor entitled to retain deposit - DTR Nominees Pty Ltd v Mona Homes Pty Ltd [1978] HCA 12; (1978) 138 CLR 423 - Foran v Wight [1989] HCA 51; (1989) 168 CLR 385 -
A party in order to be entitled to rescind for anticipatory breach must at the time of rescission himself be willing to perform the contract on its proper interpretation. Otherwise he is not an innocent party, the common description of a party entitled to rescind for anticipatory breach ...[3]
As Professor Carter notes, '[t]here is a fundamental distinction between a promisee who calls for performance by the promisor and a promisee who seeks to justify a decision to terminate performance of the contract'. In the case of the latter, 'it is not an element of proof of valid termination that the promisee was ready and willing to perform the contract at the time of termination. So much is obvious where the promisee terminates prior to the time for its performance'.[5]
B.2 Relevance of an ongoing dispute as to the contractual requirements
I conclude that the situation, by August 2020 was, in summary:
(a) LBA Capital wanted to proceed with the contract, but only [on] the basis that the building be built (in accordance with its view of the contract) as a 'Class 3 building' and the third floor be built to a boarding-house design; and
(b) Thousand Hills:
(i) did not consider itself obliged to build the third floor as a boarding-house design and did not consider that the building should be a 'Class 3 building'; and
(ii) did not want to continue with the contract if that were what it was required to build, or, perhaps, unless the purchase price paid by LBA Capital was adjusted to account for any increased costs.[8]
By early April 2020, Embrace Architects (for Thousand Hills) had prepared some amended plans for the first floor and sent them to Thomas Lui (for LBA Capital) for approval. Things seemed to be progressing. Then, on 26 May 2020, Embrace Architects advised Mario Charisiou and Thomas Lui by email that the building surveyor had taken the view that the building had to be a 'Class 3 building' (rather than a 'Class 2 building') because it provided accommodation for people with a disability, and asked Mario Charisiou to sign a letter that could be used by Thousand Hills to try to persuade the building surveyor that the building should instead be a 'Class 2 building'.
The evidence as to what the difference in classification meant to how the building had to be designed or constructed was lean, to say the least. As noted above, the NDIS requirements were not in evidence and no expert evidence was given as to the requirements. However, on the basis of an attachment to one of the emails from Thousand Hills, it seems that a 'Class 2' building is a building containing two or more sole-occupancy units, and a 'Class 3' building is a residential building providing long-term or transient accommodation for certain types of people and includes a 'boarding house', a residential part of a hotel, motel, school, detention centre or health-care building, and 'accommodation for the aged, children, or people with disability'. Again, neither party led any expert evidence on this point. Mario Charisiou said that if the building were treated as a 'Class 3 building' there would have to be some modifications to the common areas to improve accessibility. Scott Liu thought that the major difference was to do with 'fire protection'. Nicholas Sun thought more parking spaces might be required, and also said in his affidavit, after stating that the apartment layouts themselves would likely have been able [to] gain approval:
However, it is unclear if the project could have proceeded without major amendments and costs implications, if the level 1 and level 3 apartments had to be assessed as class 3 buildings by the building surveyor.[9]
In addition to relevant regulatory building requirements and good building practice the Vendors will provide the apartments and the outlined amendments identified to the Purchaser to comply with all
spatial parameters,
fixtures and fittings specifications
in accordance to NDIS (National Disability Insurance Scheme) SDA (Specialised Disability Accommodation) categories of
High Physical Support (highest disability category)
Platinum Level (highest standard)
The aforementioned categories and their criteria are to be current up until the issue of Building Permit (issued by Building Surveyor) or NDIS Pre-Construction Certificates (issued by LHA consultant)
Any variation cost (addition or subtraction) agreed between the Vendor's Project Architect and the Purchaser's Superintendent are to be agreed to within 14 days.
No doubt there are cases in which a party, by insisting on an incorrect interpretation of a contract, evinces an intention that he will not perform the contract according to its terms. But there are other cases in which a party, though asserting a wrong view of a contract because he believes it to be correct, is willing to perform the contract according to its tenor. He may be willing to recognize his heresy once the true doctrine is enunciated or he may be willing to accept an authoritative exposition of the correct interpretation. In either event an intention to repudiate the contract could not be attributed to him. As Pearson L.J. observed in Sweet & Maxwell Ltd. v. Universal News Services Ltd. (1964) 2 QB 699, at p 734:
"In the last resort, if the parties cannot agree, the true construction will have to be determined by the court. A party should not too readily be found to have refused to perform the agreement by contentious observations in the course of discussions or arguments..."[11]
B.3 Was Thousand Hills ready, willing and able?
... in the case of termination for anticipatory breach the plaintiff will generally be able to show at the time of termination that he would have been able to perform at the time for performance by demonstrating that he was not then disabled or incapacitated from such performance. As Dixon CJ noted in Rawson v Hobbs, one "must be careful to see that nothing but a substantial incapacity or definite resolve or decision against doing in the future what the contract requires is counted as an absence of readiness and willingness".[13]
(a) He had never previously been involved in the development of NDIS apartments or a 'Class 3' building;
(b) Mr Weng wanted LBA Capital to cancel the contract because the NDIS apartments were hard to deliver and Thousand Hills itself had no right to cancel the contract;
(c) The desire to cancel was reinforced, in effect, when Thousand Hills found out about the allegations of fraud made against LBA Capital and the Charisious; and
(d) He believed that he needed LBA Capital's architect, Mr Thomas Lui, to agree to the plans for the NDIS apartments.
Is it correct to say that you were willing to amend the plans to accommodate a boarding house, if that's what Mr Charisiou wanted?--- Um, yes. > > But you wanted LBA to pay for those amended plans?---Yes, but I recall initially develop the building class 3 is not actionable upon the building.
If Mr Charisiou was prepared to pay for it, you were prepared to change the plans for him?--- Well, I can't recall, but I don't think so cause they asked - in my - I just recall that the level 3 is not actionable as Building class 3.
You've never had discussions with [Mr Weng] about the difficulties?---Nah. Because I don't think it's very hard to difficult, it's really hard to deliver because very (indistinct words) which is done unapproved by the Thomas Liu, who's then, ah, special architect of the NDIS apartments engaged by Mario [Charisiou]. So once we get a drawing we can construct - construct as per drawing, whatever the - the width of door, the height of the (indistinct), whatever it is. So we just construct as per working drawing and that's all.
I'm trying to say the NDIS apartments requirement is not harder to deliver, in my opinion.
(a) did not want to build to a 'Class 3' standard if that was what was required;
(b) believed that any requirement to build to a Class 3 standard arose because of a demand by LBA Capital (that it was not entitled to make) that the third floor be built as a 'boarding house' rather than as individual apartments; and
(c) wanted LBA Capital to cancel the contract.
(a) The issue of building classification 'arose very late in the design process' and 'threatened to seriously derail' the project;
(b) The plans that had been prepared were never 'fully assessed' but the apartments as designed would have been approved;
(c) 'However, it is unclear if the project could have proceeded without major amendments and costs implication, if the level 1 and level 3 apartments had to be assessed as class 3 buildings by the building surveyor.' He later clarified that to convert the entire building from Class 2 to Class 3 would require further fire separation and engineering and an upgrade of the structure for 'consistent levelling of the floor'. This would be possible, but it would cost more;
(d) Turning the third floor into a 'boarding house' would entail an 'overall redesign of the entire floor' and more parking spaces;
(e) He (or his firm) had spent effort and time converting the first floor apartments to make them NDIS compliant and he 'more or less' knew what needed to be done 'to convert level 1 to class 3';
(f) He was prepared to turn the level three apartments into NDIS compliant apartments if needed; and
(g) If level three was to be converted into a boarding house, the additional parking requirements need to be satisfied either by car stackers or additional basement, and this was possible but would cost more.
that LBA Capital would send some form of correspondence proposing the rescission of the Contract and this would be used for the purpose of a mutual rescission of part or all of the Contract.
(a) An email from Mr Mario Charisiou (for LBA Capital) to Mr Scott Liu (for Thousand Hills) on 7 October 2020 at 7:28am indicating that he wished to cancel the contract 'because of the top floor' and to 'design' the first floor contracts as individual contracts, then 'sign' the apartments in another development. This conveyed to Thousand Hills that LBA Capital wanted to cancel the contract, enter into new contracts for the units on the ground floor, and enter into new contracts for units at another development;
(b) An email from Mr Scott Liu to Mr Mario Charisiou on 7 October 2020 at 9:20am indicating that he (Mr Charisiou) could 'send us the cancellation letter at first and request to change the name as well as nomination for the first floor'. This conveyed, as I read it, that Thousand Hills was open to receiving a letter cancelling the contract on the basis that LBA Capital would at the same time agree to purchasing the units on the first floor and units at the other development;
(c) An email from Mr Mario Charisiou on 7 October 2020 at 9:49am, in which he said 'great let's meet tomorrow' and expressed interest in the other development; and
(d) An email from Mr Mario Charisiou to Mr James Charisiou on 7 October 2020 at 12:23pm that said:
James
Can you email Scott below as the director of LBA Capital and advise that the contract of sale for the apartments can not be satisfied by the vendor and by mutual consent by both parties agree to terminate the contract and forgo the deposit. Can you do this today
Cheers
This was, clearly, a request that Mr James Charisiou, the sole director of LBA Capital, write to Thousand Hills inviting it to agree to a proposed cancellation of the contract and, although less obviously, a return of the deposit.[15]
Dear Scott
Unfortunately our company is in the process of winding down, as we are unable to continue operating. As such the company will not be in a position to settle on the contract.
My suggestion is that we rescind the contracts, and reach an agreement on how the deposit moneys are used to settle the matter.
Looking forward to your thoughts on this matter.
I mean, when I wrote that, that was in the context of - of my understanding that Mario had been having ongoing discussions with Scott, and Scott was communicating to him - I didn't speak to him directly - via Mario that ... they were unable to continue with the original terms of the agreement and were looking at alternative options ... I was wanting to clearly communicate that we weren't taking any new ventures. We were winding down anything to do with any growth or anything like that.
...
At the time, I was getting communications via Mario that Scott was wanting to vary the contract, ah, so that we could settle on the (indistinct) apartments as is without being upgraded to platinum. Ah, or be looking to vary it by substituting it with some other apartments. And I wasn't wanting to do that, but I do acknowledge that that's not clear.
...
But, at the time, because I clearly remember, ah, what I was thinking generally at the time was, ah - with all this disputed and it was current, my focus was, "How do I keep the existing contracts open? What are the contracts that we can maintain?" And absolutely not getting to any alternate contracts or variations. That was what was top of the mind, ah, of, ah - in regards to this.
...
Yes. Yes, I can't - I can't (indistinct words) of what I was thinking at the time, but the - ah, my general recollection is that at the time ..., I was told that the contracts were - couldn't be fulfilled, and either were ... - and the only ... options are either to agree to the suggested variation of going into another, um-purchasing a different set of apartments or agreeing to the apartments as is, or to close them down completely and - and get the deposit money back, and I assume there would be costs associated with that.
(a) Thousand Hills continued to work on the development after the 7 October 2020 email; and
(b) Thousand Hills continued to communicate about LBA Capital potentially purchasing apartments in another development instead of at the Burwood development.
Can you please provide your client's instructions as to whether or not they still intend to proceed with the purchase.
As discussed, we have been advised that your client does not wish to proceed with the purchase of some of the lots and seek your assistance in determining which Lots (Level 3?) in particular.
Once we have confirmation we can seek our clients instructions for a Deed of Cancellation.
Please advise
(a) Thousand Hills was 'ready, willing and able' when it accepted LBA Capital's repudiation of the contract; and
(b) Thousand Hills was not estopped from treating the repudiatory email as a repudiation.
Upon rescission, the purchasers were entitled to obtain restitution of the deposit which they had paid. Their claim for the return of the deposit was not founded on the rescinded contract. Nor did it represent a claim for damages for the vendors' breach of its terms. It was a claim founded in the equitable notions of fair dealing and good conscience which require restitution of a benefit received as, or as part of, the quid pro quo for a consideration which has failed.... If it be necessary to clothe that claim in a nomenclature, the appropriate one in a modem context is "restitution" for, or of, "unjust enrichment".[18]
[1] Thousand Hills Property Pty Ltd v LBA Capital Pty Ltd [2024] VSC 597.
[2] Thousand Hills Property Pty Ltd v LBA Capital Pty Ltd [2025] VSCA 115.
[3] [1978] HCA 12; (1978) 138 CLR 423, 433 (Stephen, Mason and Jacobs JJ, Aickin J agreeing).
[4] See eg: Foran v Wight [1989] HCA 51; (1989) 168 CLR 385 at 437-8 per Deane J: '...I do not accept the proposition that a party must incur the expense necessary to put himself in a position where he can positively demonstrate actual or potential readiness and willingness to perform a contract before he can accept the repudiation of the other party and thereby rescind. In my view, that proposition is unjustified by either principle or common sense. Absence of actual or potential readiness or willingness to perform a contract will prima facie preclude a successful action against the other party for specific enforcement of the contract or for the recovery of damages for its breach. It does not, of itself, preclude recission of the contract by acceptance of the other party's repudiation.... Put differently, it is difficult to see why the law should insist that, even though both parties to a contract have repudiated it, the contract must hang like an albatross around their necks unless and until they can reach a new agreement about its termination.' His Honour made it clear later at 438 that this should be the approach in circumstances where a party was claiming the return of a deposit, not as a result of any alleged breach, but as restitution of a benefit received for a consideration that has failed.; Highmist Pty Ltd v Tricare Ltd [2005] QCA 357, [60]-[62] (Keane JA).
[5] Willis v Crosland (2021) 65 VR 1, 16 [60] (Sifris, Walker JJA, Macaulay AJA), footnotes omitted.
[6] Thousand Hills Property Pty Ltd v LBA Capital Pty Ltd [2025] VSCA 115, [29].
[8] Thousand Hills Property Pty Ltd v LBA Capital Pty Ltd [2024] VSC 597, [33].
[9] Ibid [22], [23], footnotes omitted.
[10] By Special Condition 10.2, Thousand Hills covenanted that it would cause the entry into of the Building Contract and by Special Condition 10.1(b) LBA Capital acknowledged that the building would be 'generally in accordance with the Building Plans'. 'Building Contract' was defined to be a contract under which the Builder would build the building. 'Building' was defined to be a building constructed in accordance with the Building Plans.
[11] [1978] HCA 12; (1978) 138 CLR 423, 432 (Stephen, Mason and Jacobs JJ, Aickin J agreeing).
[12] [1989] HCA 51; (1989) 168 CLR 385, 408.
[13] Ibid, 408-9, footnote omitted. Rawson v Hobbs is reported at [1961] HCA 72; (1961) 107 CLR 466 and the passage extracted is at page 481. See also Dawson J at 453.
[14] To avoid confusion I will include the first names of Mr Scott Liu, Mr Mario Charisiou and Mr James Charisiou.
[15] Mr Mario Charisiou and Mr James Charisiou gave evidence that 'forgo the deposit' was intended to mean, and was understood to mean, a return of the deposit.
[16] DPP v Charisiou [2024] VSC 303.
[17] Sargent v ASL Developments Ltd [1974] HCA 40; (1974) 131 CLR 634, 646.
[18] [1989] HCA 51; (1989) 168 CLR 385, 438.
Thousand Hills Property Pty Ltd
LBA Capital Pty Ltd [2025] VSC 768
(1978) 138 CLR 423
(1989) 168 CLR 385
(2021) 65 VR 1
(1961) 107 CLR 466