[2020] VCAT 958
Victorian Civil and Administrative Tribunal
2020-09-04
Ms J
Original judgment source is linked above.
A 3D perspective view from the northeast (from Option A Plans TPA12a dated 8/7/2020)
In summary, Council was of the view that the proposed design will provide a suitable balance between activation and visual interest at ground level, while necessarily avoiding the provision of uses at ground level that would be at odds with the flood risk on the site.
Extract of LSIO map in Council's submission with site identified by red arrow
Extract from figure 3 in Melbourne Water's submission
Extract of plan prepared by Storm Consulting of flow of water
Flockhart Street - proposed vehicle crossing (south entrance)
Flockhart Street (aligned with northern boundary, middle of road)
The development expectations of the site given the flood hazard risk
The susceptibility of the development to flooding and flood damage.
The potential flood risk to life, health and safety associated with the development.
Flood risk factors to consider include [amongst others]:
Planning and responsible authorities should endeavour to integrate the range of planning policies relevant to the issues to be determined and balance conflicting objectives in favour of net community benefit and sustainable development for the benefit of present and future generations. However, in bushfire affected areas, planning and responsible authorities must prioritise the protection of human life over all other policy considerations.[4]
Support the development and growth of Metropolitan Activity Centres by ensuring they:
... In our view a balance is required between the constraints arising from the flood prone nature of the land and these other strategic planning outcomes. That balance, however, need not and should not compromise the proper management of the risks to property and human life. ...[6]
The proposed development acceptably manages the flood risk
Extract of Option A Ground Floor plan (TPA2a dated 8/7/20)
A 3D perspective view from the southeast (from Option A Plans TPA12a dated 8/7/2020)
The proposed land uses acceptably manage the flood risk
In accordance with the endorsed plans, the development of a five storey mixed use building with the following planning permissions:
(a) The removal of all notations regarding existing fencing and gates from the proposed ground floor plan;
(b) The incorporation of the ground floor floor levels and bollards on the proposed ground floor plan, the proposed elevations and sections as well as providing artists impressions of the bollards in accordance with the plans prepared by Petridis Architects dated 8 July 2020 numbered TPA02a, TPA09a, TPA10a, TPA11a, TPA12a - All Referenced 'For VCAT - Option A';
(c) The following dimensions on all relevant plans/elevations/sections:
Both vehicle crossings;
The southern entrance and aisle to meet the minimum dimensions of Clause 52.06-9;
The loading bay, along with a swept path diagram using an 8.8m long truck or equivalent vehicle, demonstrating ingress and egress movements into and out of this space, or modifications required to achieve this;
Headroom clearance to meet Design Standards of Clause 52.06-9;
The Accessible Parking space, with this space to comply with the Australian/New Zealand Standard AS/NZS 2890.6:2009;
Details of any boom gates or barriers or controlled entry to the car parking areas;
(d) Sight triangles at both entrances to comply with Design Standard 1 - Accessways of Clause 52.06-9. If adequate sight lines cannot be provided, convex mirrors are to be provided;
(e) The tandem parking spaces increased by 500mm in between spaces to meet Design Standard 2 of Clause 52.06-9;
(f) The proposed northern elevation (TPA10) amended to accurately depict the correct setback for the mandatory 18m section of building;
(g) The number of employee bicycle spaces shown on the plans to be contained within a maximum of 2 separate secure facilities, as per the requirements of AS2890.3. A minimum of 20% of these spaces must be provided as horizontal, at-grade spaces;
(h) The proposed 11 bicycle spaces located within the southern entry walkway to be designated as 'visitor bicycle spaces', with all of these provided as horizontal, at-grade spaces;
(i) Notations confirming that a 'minimum 40A single phase electrical sub-circuit' will be wired to the ground level for the future provision of Electric Vehicle charging;
(j) The Accessible car spaces relocated to be as close to the lift as possible;
(k) The objects shown in car space 22 and between car space 16 and 17 to be deleted, or notations added indicating the purpose of the objects;
(l) The allocation of the car parking as follows - 50 car spaces to the office land use, 10 spaces to the restricted retail land use, and two car spaces to the food and drink premises land use.
(m) A schedule of materials, finishes and colours including details of tinted or reflectivity of glass.
(n) Any changes required by the amended Sustainable Management Plan at Condition 3;
(o) Any changes required by the Green Travel Plan at Condition 5;
(p) Any changes required by the amended Waste Management Plan at Condition 7;
(q) Any changes required by the amended Landscape Plan at Condition 9.
(r) Any changes required as a result of the Flood Emergency Response Plan approved under condition 37.
(a) Details of the hot water system type and efficiency and whether any solar thermal boost is provided, with best practice to be achieved;
(b) Provision for electrical bicycle charging;
(c) Additional planters/vegetation on the roof terrace;
(d) The removal of all 'non-committal language'.
(a) Employee welcome packs (e.g. provision of Myki/transport ticketing).
(b) Details of bicycle parking.
(c) The types of bicycle storage devices proposed to be used for employee, resident and visitor spaces (i.e. hanging or floor mounted spaces).
(d) The types of lockers proposed within the change room facilities, with at least 50 per cent of lockers providing hanging storage space.
(e) Security arrangements to access the employee bicycle storage spaces.
(f) Signage and wayfinding information for bicycle facilities and pedestrians pursuant to Australian Standard AS2890.3.
(g) Provisions for the green travel plan to be updated not less than every five years.
(a) Details of how e-waste will be managed;
(b) The management of food waste diversion;
(c) Details of how any revisions will be managed;
(d) The location of the hard waste storage area within the bin storage area;
(e) Details of bin washing procedures.
(a) The bollards required by condition 1(b);
(b) The surface treatment of the section of exposed car parking (not within the undercroft). This area is to include surface treatment to soften the appearance of the parking area (bonded gravel etc). White line-marked bitumen surfaced parking is not to be provided in this area;
(c) A specification of works to be undertaken prior to planting;
(d) A plant schedule, including the botanical name, common name, mature height, and spread, installation size, planting spacing's, locations and quantities of each plant. The plant species must reflect the landscape character as outlined in the Significant Landscape Overlay (Schedule 1) and the Ecological Vegetation Class for this location - EVC 56 Gippsland plain bioregion - Floodplain Riparian Woodland;
(e) A legend containing key features and materials;
(f) Proposed levels including top of walls;
(g) Details of any planter beds including height, width and materials;
(h) Information on irrigation and drainage systems;
(i) Notes on the maintenance schedule, tasks and maintenance period;
(j) Notes on irrigation if included;
(k) The following details for planter and raingarden design;
Planter material and dimensions.
Mulch layer.
Growing media
Filter media
Irrigation method / stormwater inlet
Drainage system
Root barrier / water proofing layer
(l) The location and site area percentage of all existing and proposed hard or impermeable surfaces;
(m) The inclusion of local indigenous shrubs and grasses in the rock revetment;
(n) Clarification as to whether any existing trees within five metres of the site boundaries will be removed or pruned. If so, the following details will be required;
- A plan showing the existing trees and those to be removed or pruned;
- A schedule of the trees to be removed;
- An impact statement in relation to the development and the impact on the existing vegetation;
- The provision of native vegetation offsets.
(a) implementing and complying with the provisions, recommendations and requirements of the endorsed Landscape Plan;
(b) not using the areas set aside on the endorsed Landscape Plan for landscaping for any other purpose; and
(c) replacing any dead, diseased, dying or damaged plants,
(a) the protection of any trees within 5m of the northern boundary:
pre-construction;
during construction; and
post construction
(b) the provision of any barriers;
(c) any pruning necessary; and
(d) watering and maintenance regimes,
(a) Office - 8am to 5pm - Monday to Friday;
(b) Food and drink premise - 7am to 6pm - Monday to Friday and 7am to 3pm - Saturday and Sunday;
(c) Restricted retail premise - 9am to 5.30pm - Monday to Friday.
(a) The transport of materials, goods or commodities to or from land;
(b) the appearance of any buildings, works or materials;
(c) the emission of noise, artificial light, vibration, smell, fumes, smoke, vapour, steam, soot, ash, dust, waste water, waste products, grit or oil, or
(d) the presence of vermin.
(a) located;
(b) directed;
(c) shielded; and
(d) of limited intensity,
(a) constructed and available for use in accordance with the endorsed plans;
(b) formed to such levels and drained so that they can be used in accordance with the endorsed plans;
(c) treated with an all-weather seal or some other durable surface; and
(d) line-marked or provided with some adequate means of showing the car parking spaces;
(a) at the permit holder's cost; and
(b) to the satisfaction of the Responsible Authority.
(a) at the permit holder's cost; and
(b) to the satisfaction of the Responsible Authority.
(a) at the permit holder's cost,
(b) to the satisfaction of the Responsible Authority.
(a) in accordance with any requirements or conditions imposed by Council;
(b) at the permit holder's cost; and
(c) to the satisfaction of the Responsible Authority.
(a) at the permit holder's cost; and
(b) to the satisfaction of the Responsible Authority.
(a) a pre-conditions survey (dilapidation report) of the land and all adjacent Council roads frontages and nearby road infrastructure;
(b) works necessary to protect road and other infrastructure;
(c) remediation of any damage to road and other infrastructure;
(d) containment of dust, dirt and mud within the land and method and frequency of clean up procedures to prevent the accumulation of dust, dirt and mud outside the land;
(e) facilities for vehicle washing, which must be located on the land;
(f) the location of loading zones, site sheds, materials, cranes and crane/hoisting zones, gantries and any other construction related items or equipment to be located in any street;
(g) site security;
(h) management of any environmental hazards including, but not limited to,:
contaminated soil;
materials and waste;
dust;
stormwater contamination from run-off and wash-waters;
sediment from the land on roads;
washing of concrete trucks and other vehicles and machinery; and
spillage from refuelling cranes and other vehicles and machinery;
(i) storage of materials outside of the riparian zone on the site;
(j) the construction program;
(k) preferred arrangements for trucks delivering to the land, including delivery and unloading points and expected duration and frequency;
(l) parking facilities for construction workers;
(m) measures to ensure that all work on the land will be carried out in accordance with the Construction Management Plan;
(n) an outline of requests to occupy public footpaths or roads, or anticipated disruptions to local services;
(o) an emergency contact that is available for 24 hours per day for residents and the Responsible Authority in the event of relevant queries or problems experienced;
(p) the provision of a traffic management plan to comply with provisions of AS 1742.3-2002 Manual of uniform traffic control devices - Part 3: Traffic control devices for works on roads;
(q) a Noise and Vibration Management Plan showing methods to minimise noise and vibration impacts on nearby properties and to demonstrate compliance with Noise Control Guideline 12 for Construction (Publication 1254) as issued by the Environment Protection Authority in October 2008. The Noise and Vibration Management Plan must be prepared to the satisfaction of the Responsible Authority.
In preparing the Noise and Vibration Management Plan, consideration must be given to:
(a) any stormwater discharged into the stormwater drainage system must be in compliance with Environment Protection Authority guidelines;
(b) stormwater drainage system protection measures must be installed as required to ensure that no solid waste, sediment, sand, soil, clay or stones from the land enters the stormwater drainage system;
(c) vehicle borne material must not accumulate on the roads abutting the land;
(d) the cleaning of machinery and equipment must take place on the land and not on adjacent footpaths or roads; and
(e) all litter (including items such as cement bags, food packaging and plastic strapping) must be disposed of responsibly.
(a) Monday-Friday (excluding public holidays) before 7 am or after 6 pm;
(b) Saturdays and public holidays (other than ANZAC Day, Christmas Day and Good Friday) before 9 am or after 3 pm;
(c) Sundays, ANZAC Day, Christmas Day and Good Friday at any time.
The FERP must be prepared by a suitably qualified person and must be generally in accordance with the draft FERP prepared by Storm Consulting dated 8 July 2020 but modified to include:
(a) A definition of 'operational hours' in section 1.3 that is the hours of operation contained in this permit.
(b) The responsibility of the Flood Warden in Table 1-1 (on page 6) modified to 'maintain currency of FERP for tenancy' and the associated key tasks to include:
Reporting changes to Property Manager to give examples such as identifying staff with special needs (e.g. a disability), changes to the flood tenancy or staff numbers that might be relevant to the flood risk.
Participating in FERP training on an annual basis as a minimum.
(c) Table 2-2 first row description of relevant site levels amended to state that flood water will begin inundating Flockhart Street to the north of the Site .... (etc).
(d) The 'relevant site levels' text should be added to the 1% Flood AEP row, which will be similar to the text for the 2% Flood AEP.
(e) In Table 3-1:
The third row management measure should cross-reference to the page where the 'defined trigger' is identified.
Review whether to fourth row management measure of evacuating staff and visitors at RL8.0m AHD to RL7.52m (as per page 16 second warning and page 22 Table 5-1) if there is no specific warning at RL8.0m.
Provide examples of 'appropriate emergency provisions' in fourth row redundancy column, e.g. water, types of foods, medical kit, etc and state where it will be housed.
Change eighth row management measure column to refer to 'first floor level' rather than 'design floor level'.
Review ninth row management measure column about back up power necessary if sheltering in place.
(f) Section 3.2.2 paragraph 3, second sentence to refer to 'Flood Wardens' rather than floor wardens.
(g) Change the note at the end of section 5.1 to be a dot point at the end of the dot points already included in that section.
(h) In section 5.3.1:
- Change the last dot point under the heading Vehicles to state:- Property Manager will confirm that all vehicles have been removed or what vehicles remain and record their details on their final inspection before closing the site.
Maintenance of flood warning system and bollards
(a) The owner(s) of the land to implement the Flood Emergency Response Plan (or any updated version) endorsed under this permit, which has been approved by the Responsible Authority and Melbourne Water Corporation.
(b) The owner(s) of the land to maintain all flood related measures identified in the FERP and this permit in good working condition.
(a) the development is not commenced within two years of the date of this permit;
(b) the development is not completed within four years of the date of this permit.;
(c) the uses are not commenced within five years of the date of this permit.
In accordance with section 69 of the Planning and Environment Act 1987, an application may be submitted to the responsible authority for an extension of the periods referred to in this condition.
APPENDIX B - EXTRACT OF TABLE OF CONTENTS IN DRAFT FLOOD EMERGENCY RESPONSE PLAN
[1] The submissions and evidence of the parties, and the supporting exhibits provided before and during the hearing have all been considered in the determination of the proceeding. In accordance with the practice of the Tribunal, not all of this material will be cited or referred to in these reasons.
[2] Figure 1 of Water Technology's flood report dated 2007. Mr Wiese's expert statement contains the Flood Management Plan that explains at section 1.3.1 an expert report was prepared by Water Technology for a proposed warehouse development on the site on 15 November 2004; and a supplementary report on flooding issues at the site was prepared by Water Technology on 10 August 2007.
[3] Permit PL06/0431 issued on 7 January 2008
[4] Extract from clause 71.02-3 of the planning scheme
[5] No. 8 River Street Pty Ltd v Stonnington CC (Corrected) [2019] VCAT 2058 (No. 8 River Street)
[6] Extract from paragraph 29 of No. 8 River Street
[7] Guidelines for Development in Flood Affected Areas. February 2019
[8] E.g. Whelan v Maribyrnong CC [2009] VCAT 2681; M & H Curren Investments Pty Ltd v Mornington Peninsula SC [2012] VCAT 815; and Core Mentis v Yarra CC [2005] VCAT 2538
[9] The applicant relied on Benedetti v Moonee Valley City Council [2005] VSC 434 that a permit condition has ongoing effect whilst the benefit of the permit continues to be enjoyed.
[10] For example, such a condition would be worded along the lines of:
If any term or condition of the Statement requires any ongoing maintenance or monitoring, the owner of the land (or another person in anticipation of becoming the owner of the land) must enter into an agreement with the Responsible Authority pursuant to section 173 of the Planning and Environment Act 1987 (Agreement). The Agreement must:
(i) provide for the undertaking of the ongoing maintenance and monitoring as required by the Statement; and
(ii) be executed before the sensitive use for which the land is being developed commences.
Stock Corporation Pty Ltd
Yarra CC [2020] VCAT 958