[2012] VCAT 815
Victorian Civil and Administrative Tribunal
2012-06-15
Original judgment source is linked above.
Application under section 77 of the Planning and Environment Act 1987 to review a decision to refuse a permit. Mornington Peninsula Planning Scheme. Residential 1 zone. Land Subject to Inundation Overlay. Flood Overlay. Subdivision and development of land that is subject to flooding. Melbourne Water Guidelines. Flood hazard and risk assessed. Floodplain management principles discussed.
M & H Curren Investments Pty Ltd v Mornington Peninsula SC [2012] VCAT 815
Mr Joseph Alesci, a solicitor from Urban Lawyers. He called the following witnesses:
Mr Rory O'Connor, a solicitor from Norton Rose Lawyers. He called the following witnesses:
A two storey dwelling is proposed to be constructed to the rear of an existing lot and the land subdivided. The subdivision would create a lot of 859m2 that would contain two double storey dwellings that have existing planning approval. A lot of 552m2would be created to the rear of this lot to contain the additional dwelling. The subdivision would create common property of 230m2 along the southern edge of the front lot to provide access to the approved two dwellings and the rear lot.
The additional dwelling would be supported by a series of pylons in order to sit above flood water levels. A garage attached to the dwelling and access would be similarly elevated.
Refusal to grant a permit pursuant to Section 77 Planning and Environment Act 1987.
Zone and Overlays applying under the Mornington Planning Scheme
Vegetation Protection Overlay (Clause 42.02 & Schedule 1).
Design and Development Overlay (Clause 43.02 & Schedule 1).
Planning permissions required under the Mornington Planning Scheme
Construction of two or more dwellings on a lot (Clause 32.01-4).
Construct a building and carry out works (Clauses 43.02-2, 44.03-1 and 44.04-1).
Subdivision of land (Clauses 32.01-2, 44.03-2, 4.04-2).
The subject land has an eastern frontage to Marchington Avenue of 20.8m, while the southern and northern boundaries are approximately 80m deep. The western boundary is along the banks of Tanti Creek. The lands lopes from east to west.
Surrounding land is residential with development to the north and south along Marchington Avenue.
A single storey dwelling currently occupies the eastern portion of the site, with a bungalow located on the lower, flat western portion near the creek.
PLANNING AND OTHER GUIDANCE FOR THE USE AND DEVELOPMENT OF FLOOD PRONE LAND
To implement the State Planning Policy Framework and the Local Planning Policy Framework, including the Municipal Strategic Statement and local planning policies.
To provide for residential development at a range of densities with a variety of dwellings to meet the housing needs of all households.
To implement the State Planning Policy Framework and the Local Planning Policy Framework, including the Municipal Strategic Statement and local planning policies.
To identify waterways, major floodpaths, drainage depressions and high hazard areas which have the greatest risk and frequency of being affected by flooding.
To ensure that any development maintains the free passage and temporary storage of floodwater, minimises flood damage and is compatible with flood hazard, local drainage conditions and the minimisation of soil erosion, sedimentation and silting.
There are other relevant purposes about environmental and water quality matters, that are not substantive to the issue of flood risks and hazards. I have therefore not considered these aspects of the controls further.
To ensure that development maintains the free passage and temporary storage of floodwaters, minimises flood damage, is compatible with the flood hazard and local drainage conditions and will not cause any significant rise in flood level or flow velocity.
Any floodplain management manual of policy and practice, or catchment management, river health, wetland or floodplain management strategy adopted by the relevant responsible floodplain management authority.
Flood risk and guidance from the VPP Practice Notes
Flood risk must be considered in planning decisions to avoid intensifying the impact of flooding through inappropriately located uses and developments.
Land use planning is one mechanism that is used to minimise the risk of flooding to life and property.....
Each of the flood provisions provides differing degrees of flexibility for the development of flood-affected land directly related to the flood risk.
Where possible, floodway land should be maintained in large parcels and not be fragmented by multiple property boundaries. The subdivision provisions aim to achieve this objective by not allowing new lots to be created in the UFZ or FO, other than to realign the boundaries of existing lots.
The creation of lots that are wholly within the UFZ or FO is also discouraged.
Subdivision provisions for the LSIO and the SBO are less stringent than for floodway areas. However, the intensification of development in flood storage areas or natural habitats should be discouraged. Any subdivision that could result in longterm intensification of development in flood-storage areas should be carefully assessed.
Necessary Requirements - As per Section 5
Smaller urban resubdivisions (i.e. two-lot subdivisions; unit developments) and smaller urban developments.
Development must not be allowed on properties where the depth and flow of floodwaters would create a hazard.
The product of depth (in m) and velocity of flow (in m/s) should be no more than 0.35m2/s.
• building entrance/exit points and their surrounds;
• connecting routes to outbuildings or car parking areas; and
Good planning is the key to minimising long-term risks of damage from flooding. The principle is simple - plan and develop properties, buildings and structures so that they are safe from flooding from the outset without compromising the safety of other properties. Prevention is far cheaper than the cure.
[1] Permit No P08/1870 issued on 25 June 2009.
[2] As per Clauses 66.01 & 66.03 of the Mornington Planning Scheme and s. 52 of the Planning and Environment Act 1987.
[5] Applying the flood provisions in planning schemes - A guide for councils Victorian Planning Practice Note 12, August 2000.
[8] In planning policy terms flood prone is land which may be subject to inundation up to and including a 1:100year ARI event.
[9] Victorian Planning Practice Note 11, August 2000.
[10] Version 1.1, October 2008. Melbourne Water
[11] CSIRO Publishing acting on behalf of the Agriculture and Resource Management Council of Australia and New Zealand - Standing Committee on Agriculture and Resource Management.
[12] As per ss.60(1A) (g) and 84B of the Planning & Environment Act 1987.
[14] While referring to necessary requirements as being under section 5 of the document, it is clear that this is a reference to the 'core requirements' of section 4.
[15] At s.4.2 (p10) of the MW Guidelines.
[17] Around 3.6m in the south-west corner.
[19] The application plans showed the access and garage to be placed on filled land. Mr Powell recommended that a suspended slab arrangement as a better response over filling the land.
[20] The plans show an access level of 5.64m AHD.
[21] Email from Keith Boniface of Melbourne Water to David Kotsiakos dated 29 September 2010.
[22] The specific value advised by Melbourne Water is 1.07m/s. I have rounded this value, given the likely levels of accuracy in the modelling which relay upon a range of ground conditions being maintained along the creek valley.
[24] I note that these criteria are not hard and fast rules. The MW Guidelines direct attention to the 'Floodway Safety Criteria Guidelines ...documented...in Appendix G of the Design Guide in Melbourne Water's Land Development Manual'. Neither expert referred to the Floodway Safety Criteria Guidelines but preferred to rely on the calculation of depth and velocities as I have set out.
[25] Whelan v Maribyrnong CC [2009] VCAT 2681, Davies v Moira SC [2011] VCAT 452 and Lourey v Yarra CC (Application P1365/2011 - 1 December 2011).
M & H Curren Investments Pty Ltd
Mornington Peninsula SC [2012] VCAT 815