[2020] QCAT 428
General information, not legal advice.
Queensland Civil and Administrative Tribunal
2020-11-12
Stone Homes P
Original judgment source is linked above.
CONTRACTS - BUILDING, ENGINEERING AND RELATED CONTRACTS - PERFORMANCE OF WORK - REMEDIES FOR BREACH OF CONTRACT - DAMAGES - MEASURE OF - where builder performed unlicensed building work - defective work - whether homeowner was owner/builder - whether compromise with insurer - effect of unlicensed building work on assessment of damages.
Queensland Building and Construction Commission Act 1991 (Qld), s 42, s 77(2), s 77(3)(h), Schedule 1B, Schedule 2
Queensland Building and Construction Commission Regulation 2003 (Qld), repealed, Schedule 1AA
Bellgrove v Eldridge [1954] HCA 36; (1954) 90 CLR 613
Bocquee v Baltus [2019] QCAT 280
Commonwealth v Amann Aviation Pty Ltd [1991] HCA 54; (1991) 174 CLR 64
Commonwealth Development Bank of Australia Ltd v Kok, in the matter of Kok [2003] FCA 90
Cook's Construction Pty Ltd v Stork Food Systems Australasia Pty Ltd [2009] QCA 75
Grant v John Grant and Sons Pty Limited [1954] HCA 23; (1954) 91 CLR 112
Gunn v Steain [2003] NSWSC 1076
Mertens v Home Freeholds Co. [1921] 2 KB 526
Robinson v Harman [1848] EngR 135; (1848) 1 Ex 850
Williams v Stone Homes P/L & Anor [2014] QDC 64
Yongwoo Park v Betaland Pty Ltd [2017] QCAT 228
(a) Quote on letterhead bearing the name Chad John Kirby dated 8 January 2017 (sic: 2018):
(b) Quote by Chad John Kirby dated 22 January 2017 (sic: 2018):
(c) Quote by Chad John Kirby dated 24 January 2017 (sic: 2018)
(a) The Releasor has made a claim against the Releasee (hereinafter called "the claim"), in relation to loss and damage suffered by the Releasor as a result of an incident (hereinafter called "the incident"), which occurred on or about the 1 February 2018 when Faulty workmanship caused loss of rent to the third party.
(a) AS3740-2010: Waterproofing of Domestic Wet Areas;
(b) AS3958-2007: Ceramic Tiles - Guide to installation of ceramic tiles;
(c) Queensland Building and Construction Commission Standards & Tolerances Guide May 2019; and
(d) National Construction Code/Building Code of Australia 2016.
(a) uneven tiling throughout all wall and floors of the bathroom, laundry and kitchen with tolerances in excess of the maximum as specified in the relevant controls;
(c) joint lines not uniform or even width and do not align and are not on the same plane.
(d) chipped tiles, rough and flakey cuts and sharp edges throughout;
(e) sharp tiled edges around the bathtub and along the nib wall in the bathroom;
(f) gradients around the bathroom floor wastes drain away from the floor waste, posing a risk to surrounding areas and allowing the pooling of water;
(g) no waterstop at the doorway thresholds of the bathroom and laundry as prescribed by AS3740, posing a hazard to building elements;
(h) chipped tiles, rough and flaky cuts and sharp edges at the doorway threshold to the bathroom and laundry floor. Sharp exposed edge abuts the carpet at a slightly higher level, posing a trip and cut risk;
(i) drummy tiles in the bathroom indicating tiles not adhered to the substrate;
(j) tiling overlapping the bathtub lip is chambered significantly and not plumb/square with the remainder of the wall, causing concerns with waterproofing;
(k) grout, flexible sealant and movement/perimeter joint were not installed as specified by the relevant controls throughout the bathroom walls and joints;
(l) movement/perimeter joints were filled with grout in lieu of flexible sealant as prescribed by AS3958.1, which will result in cracking along the joint or potentially cracking/delaminating the tiles;
(m) wall tiles are not racked to achieve a straight edge;
(n) excess grout and sealant has been left throughout the recently completed works;
(o) additional damage was caused to other building elements:
(i) grout/adhesive was splashed throughout the kitchen area including along the kitchen bench top, floor vinyl covering, cabinets and the like. The kitchen joinery and floor are otherwise new and recently installed;
(ii) damaged/chipped paint surrounding the tiled areas including architraves and corridor walls;
(iii) the area left unclean with grout, dust, splattered materials and the like throughout the work areas;
(iv) finger marks and dirt present along the portion of the corridor at the doorway to the bathroom and laundry.
(a) the Stevanovics' claims were compromised by the payment made by Allianz recorded in the Form of Release signed by Mrs Stevanovic.
(b) The Stevanovics were owner builders and it was their responsibility to supervise Mr Hale and ensure the work he performed was not defective.
(c) He was denied the opportunity to conduct rectification work.
(d) He should not be responsible for the cost of any work which was not of the type he had contracted to perform.
(e) Account should be taken of the contract price which had never been paid to Mr Kirby, even though he had attended to payment of Mr Hale for the work.
(f) Some of the claimed items of damage should not be recoverable.
(g) He was refused access to the site to have his expert measure the rectification work performed.
(i) engage one or more licensed contractors to carry out building work;
(ii) provide building work services that would usually be carried out by a licensed contractor in the course of the contractor's business; or
Examples of an owner providing building work services -
Denied the opportunity to conduct rectification work
(a) make arrangements for an assessment and quote by a qualified builder and make payment for all of the claims or arrange for Mr Kirby's insurer to do so within seven days; or
(b) agree in writing to immediately commence rectification of the defects.
Account taken of the cost of the contract works/ Some claims not recoverable
s 42(4) of the QBCC Act an unlicensed contractor is entitled to reasonable remuneration for carrying out building work, but only if, relevantly, the amount claimed is not more than an amount paid by a person in supplying materials and labour for carrying out the building work and does not include the supply of his own labour or any profit.
(c) Landscaping due to property being uninhabited when unable to rent - $600
(d) Flights for Anthea Stefanovic to inspect work on 31 January 2018 - $149.49
(f) Flights to meet assessor from Allianz 14 May 2018 - $204.00
(h) Flights for Aleksandar Stevanovic to inspect rectification by Roulstone Renovations 20 to 22 May 2018 - $339.35
(k) Cost of preparation of building report - $1,980.00
(l) Cost of flights to attend QCAT Directions Hearing 23 May 2019 - $145.40
(p) Time to re-paint damaged areas and cost of materials (performed by applicants) $200.00.
(q) Flights to attend directions hearing 9 March 2020 - $143.42.
(a) Mr Obradovic records and Mr and Mrs Stevanovic claim that the premises were left in a dirty and damaged state by Mr Hale. A quote from Absolute Cleaning Solutions dated 29 May 2018 is in evidence in the sum of $907.50 inclusive of GST. I accept that the site was not left clean, which is what one would expect if works were carried out with due care and skill. I allow the sum of $907.50 for cleaning.
(b) It is said that because rental of the property was delayed by dealing with Mr Kirby's insurer and attending to rectification, additional costs were incurred at the property including landscaping. I am not prepared to allow an amount for this item. I consider the cost is part of the cost of maintaining a property for investment purposes and that it forms part of the loss of rental claim otherwise compromised by the Stevanovics.
(c) Claims are made for flights on 31 January 2018 and car hire. I do not allow that claim because those are costs which would have been met by Mrs Stevanovic in any event as part of conducting a renovation when she and her husband live interstate.
(d) I disallow, as too remote, the cost of flights and car hire to meet the insurance assessor on 14 May 2018, on the basis that these costs are not a naturally occurring consequence of the defective work which should have been in the contemplation of the parties.
(e) I allow the cost of flights and a taxi for Mr Stevanovic to inspect the rectification work in May 2018 in an amount of $389.35 as arising naturally out of the need for rectification and finalisation by the owners of the property.
(f) At the hearing Mrs Stevanovic revised the claim for the cost of repair of damaged paint work to just the cost of materials in the sum of $200.00. I allow that amount.
(c) Cost of expert witness attending hearing: $1,600.00
[1] Section 77(2), Queensland Building and Construction Commission Act 1991 (Qld) (QBCC Act); letter QBCC to Anthea Stevanovic dated 22 June 2018 - attachment 15 to Application filed 29 January 2019.
[2] Schedule 1B and Schedule 2, QBCC Act: definitions of 'building dispute'; 'domestic building dispute'; 'reviewable domestic work'.
[4] Section 13 of Schedule 1B, QBCC Act; section 14, Electronic Transactions (Queensland) Act 2001 (Qld).
[7] Statement of Chris Roulstone made 9 July 2019, attachment A (Exhibit 16).
[9] Commonwealth Development Bank of Australia Ltd v Kok, in the matter of Kok [2003] FCA 90, [34], citing Grant v John Grant and Sons Pty Limited [1954] HCA 23; (1954) 91 CLR 112, 126.
[10] Gunn v Steain [2003] NSWSC 1076.
[11] Statement of Aleksandar Stevanovic dated 10 July 2019 (Exhibit 2) attachment 9.
[12] Statement of Aleksandar Stevanovic dated 10 July 2019 (Exhibit 2) at para 9.
[13] Damien J Cremean, Michael H Whitten and Michael F Sharkey, Brooking on Building Contracts (LexisNexis, 6th ed, 2020), 62-63.
[14] Section 22 of Schedule 1B, QBCC Act.
[15] Robinson v Harman [1848] EngR 135; (1848) 1 Ex 850, 855; Commonwealth v Amann Aviation [1991] HCA 54; (1991) 174 CLR 64.
[18] Schedule 1AA, Queensland Building and Construction Commission Regulation 2003 (Qld), now repealed, but current as at the date the work was performed.
[19] Schedule 2, QBCC Act: definition of "value".
[21] Yongwoo Park v Betaland Pty Ltd [2017] QCAT 228, [9] - [13], [17] and Williams v Stone Homes P/L & Anor [2014] QDC 64.
[22] Bellgrove v Eldridge [1954] HCA 36; (1954) 90 CLR 613.
[23] Commonwealth v Amann Aviation Pty Ltd [1991] HCA 54; (1991) 174 CLR 64.
[24] Mertens v Home Freeholds Co. [1921] 2 KB 526, 535.
[25] Cook's Construction P/L v Stork Food Systems Australasia P/L [2009] QCA 75, [57].
[26] Yongwoo Park v Betaland Pty Ltd [2017] QCAT 228; Bocquee v Baltus [2019] QCAT 280.
Stevanovic & Anor
Kirby [2020] QCAT 428
(1954) 90 CLR 613
(1991) 174 CLR 64
(1954) 91 CLR 112