[2025] VCAT 467
General information, not legal advice.
Victorian Civil and Administrative Tribunal
2025-05-27
Original judgment source is linked above.
Construct a building and construct or carry out works
(a) Location of a minimum 3,000 litre rainwater tank to be installed on each dwelling to collect stormwater from the roof and must be connected to supply water to at least one toilet within each of the dwellings.
(b) Bollard lighting at driveway must be provided for safe night time traffic movement to the satisfaction of Responsible Authority.
(c) The exact location of Melbourne Water's underground drain must be located by a licensed surveyor as per Melbourne Water's Asset Proving Standard (to quality level B or higher as per AS5488) and results of drain survey must be included on plan drawings noting setbacks to all works (dwellings, sheds and any other works) from the outside edge of Melbourne Water's drain. For more information on asset proving please refer to: https://www.melbournewater.com.au/planning-andbuilding/work-or-build-near-our-assets-oreasements/check-if-assetsare-near-your-0
(d) Currently shown 2.5 metre wide drainage easement must be widened to be a 6.5 metre wide easement noted to be in favour of Melbourne Water. Melbourne Water's underground asset following the drain survey must be shown centrally located within the new 6.5 metre wide easement.
(e) Finished ground floor level of proposed dwellings (Unit 1 & 2) must be shown no lower than 32.9 metres to Australian Height Datum (AHD) which is 300mm above the applicable flood level of 32.6 metres to AHD.
(f) Finished surface level of Unit and 2 garages must be shown no lower than 32.6 metres to AHD.
(a) A survey (including botanical names, trunk location, trunk diameter and canopy spread) of all existing vegetation. The survey must clearly mark existing vegetation to be retained and removed. The survey must also include any street trees.
(b) Buildings and trees (including botanical names, trunk location, trunk diameter and canopy spread) on neighbouring properties where the Tree Protection Zones of such trees fall within the subject site as calculated in accordance with Australian Standard 4970-2009 or its successor.
(c) Details of surface finishes of pathways and driveways.
(d) A planting schedule of all proposed trees, shrubs and ground covers, including botanical names, common names, pot sizes, sizes at maturity, and quantities of each plant. All species selected must be to the satisfaction of the Responsible Authority.
(e) Landscaping and planting within all open areas of the site including:
- A landscaping strip a minimum of 3 metres wide along the Carluke Close frontage.
- Landscaping and planting on both sides of each driveway.
- A landscaping strip a minimum of 1 metre wide where possible along southern boundary.
- A landscaping strip a minimum of 1 metre wide where possible along the northern boundary. The strip must be planted with shrub and groundcover species suitable for planting within easements and must have a natural growing height of no more than 5 metres.
(f) Landscaped areas must be planted with shrub and groundcover species capable of achieving a minimum density of at least 85 per cent coverage 12 months after planting.
(g) Landscaping must demonstrate the use of sustainable practices and if irrigation is to be provided it must not use potable water.
(h) Any planting within an easement must utilise species suitable for planting within easements and must have a natural growing height of no more than 5 metres.
(i) All garden beds adjoining turf or gravel surfaces must have hard garden edging.
(j) Trees in the following locations:
- A minimum of two canopy tree (2 metres high at the time of planting) reaching a minimum mature height of 6 metres within the Carluke Close frontage. AND
- A minimum of one canopy tree (2 metres high at the time of planting) reaching a minimum mature height of 7 metres within the secluded private open space of each dwelling.
(k) 1200mm organic mulch diameter around any retained or proposed trees in lawn areas.
(l) The provision of notes regarding site preparation, including the removal of all weeds, proposed mulch, soil types and thickness, subsoil preparation and any specific maintenance requirements.
(m) The location of any tree protection zones and protection measures including for street trees accurately drawn to scale, labelled and notations referring to any endorsed Tree Management and Protection Plan, or Arboricultural Report.
(a) The Tree Protection Plans (drawing) for each stage of the development (Demolition, Construction and Landscaping) and must be drawn to scale, appropriately notated and reference the Tree Management Plan (report) and provide details of:
- The Tree Protection Zone (TPZ) and Structural Root Zone (SRZ), calculated in accordance with Australian Standard 4970-2009 or its successor, for all trees to be protected on site or neighboring properties where the TPZ falls partially within the subject site.
- Tree protection fencing, or ground protection where required, provided in accordance with Australian Standard 4970-2009 or its successor.
- Any other specific measures such as site access points or material storage areas as required in the Tree Management Plan (report).
(b) The Tree Management plan (report) must be prepared by a suitably qualified arborist, reference the Tree Protection Plan (drawing) and provide details of:
- All tree protection and management actions required during each stage of the development (Demolition, Construction and Landscaping).
- How excavation impacts, including soil level changes, within the TPZ of trees to be retained will be managed or minimised.
- Proposed tree protection measures including fencing or ground, trunk or branch protection as required during each stage of the development.
- Any pruning to be undertaken being in accordance with Australian Standard 4373-2007 or its successor.
- How the canopy of trees nominated on the Tree Protection Plan will be protected or managed during each stage of the development.
- Appropriate signage on any tree protection fencing.
- Any non-destructive root investigation previously undertaken to determine the location and distribution of roots of trees nominated on the Tree Protection Plans.
- Proposed footings and construction methods for any buildings or structures (including but not limited to, driveways, paths retaining walls or other hard infrastructure) within the TPZs nominated on the Tree Protection Plans.
- Details of suitable driveway/path materials and construction methods (i.e., permeable paving above grade) and the timing of works within the TPZs.
- Stages of development at which inspections are required to ensure tree protection measures are adhered to must be specified.
- Appropriate methods of certification by a suitably qualified Arborist of the required tree protection measures during the development including details of site visits, actions and photographic evidence.
- The process that will be followed if any damage occurs to a protected tree, including reporting of damage for any Council owned tree.
- Any other measures required to demonstrate the successful ongoing retention and viability during and post-construction of any trees nominated on the Tree Protection Plan.
Contact to Implement Tree Management and Protection Plan
Adherence to Tree Management and Protection Measures
(a) The fencing is to be a 1.8-metre-high temporary fence constructed using steel or timber posts fixed to a concrete pad, with the fence's side panels to be constructed of cyclone mesh wire or similar strong metal mesh or netting.
(b) The fencing is to encompass the entire nature strip area (between any footpath and kerb and channel) and must extend to the identified tree protection radial distance.
(c) The fencing can be moved to the edge of any existing crossover(s) for site access.
(d) The fencing may only be moved to construct any approved crossover.
(a) Transport of materials, goods or commodities to or from the land.
(b) Inappropriate storage of any works or construction materials.
(c) Hours of construction activity.
(d) Emission of noise, artificial light, vibration, smell, fumes, smoke, vapour, steam, soot, ash, dust, waste and storm water runoff, waste products, grit or oil.
(e) Presence of vermin.
(a) The premises are connected to reticulated water supply, sewerage, drainage and underground electricity to the requirements of the relevant servicing authority.
(b) The areas set aside for car parking and access lanes on the endorsed plan have been:
- Constructed with an all-weather seal coat.
- Properly formed to such levels that they can be used in accordance with the plans.
- Drained.
- Linemarked to indicate each car space and all access lanes.
(c) All landscaping works have been completed generally in accordance with the endorsed plan.
(d) A letter box and street number have been provided to the satisfaction of the responsible authority.
(e) The land must be cleared of all excess, unused building materials or debris.
"...that they will not construct or place upon the Lot hereby transferred at any time any building or structure other than no more than two dwelling houses (with usual outbuildings)."
(a) The development of the land must be undertaken and completed in accordance with the plans endorsed under Planning Permit PA23-0521 issued on Day Month Year, or any amended or subsequent permit; or
(b) A restriction on the plan of subdivision must be created requiring the development of all the land in the subdivision must be in accordance with Planning Permit PA23-0521, issued on Day Month Year, or any amended or subsequent permit.
(a) Details to be submitted for permanent structures must include:
- Plans showing the lateral relation of the proposed works to the Melbourne Water Asset;
- The building/structure including footings, eaves etc. must be set outside the required 6.5 metre wide easement (with drain located in the centre) NOTE: No overhangs or eaves are permitted within the easement;
- The depth of the footings must be adequate to satisfy the angle of repose relative to the drain as per Melbourne Water's specification. See attached Standard Drawing: 'Angle of Repose - Footing Design' http://www.melbournewater.com.au/Planningand-building/Forms-guidelinesandstandarddrawings/Documents/Angle-of-repose-diagram.pdf
- A work method statement or an arborist report is required for any proposed tree removal within 5m laterally of any Melbourne Water asset;
- A work method statement from a suitably qualified engineer will be required if any demolition is proposed and should include details of machinery access;
- Note no additional loading is to be placed on the asset.
(b) Details to be submitted for temporary structures (e.g.: Light weight sheds, fences, paving) must include:
- Structures are to be designed as a simple pinned connection that facilitates for ease of removal within a reasonable time of 2. Method for removal of the structure must not require the use of plant and equipment such as cranes, scaffolding or elevated work platforms;
- Footings must not exceed a 600mm x 600mm square pad footing, and maintain a minimum lateral clearance of 500mm from the outside edge of the drain;
- Footings must be independent and self-supporting;
- Following are classified as Permanent structures and not permitted in the lateral clearance zone: water tanks, airconditioning units, hot water systems. For more information please refer to: https://www.melbournewater.com.au/planning-andbuilding/workor-build-near-our-assets-or-easements/building-requirements
(a) A minimum 850mm vertical cover is to be maintained over the pipeline;
(b) The manhole/junction pits located on Melbourne Water's drain must not be covered over by the proposed works;
(c) Any new landscaping within 5 metres of the asset will need to comply with Melbourne Water's Planting Guidelines. A Plant near sewers, drains, waterways and water mains application detailing of any landscaping will need to be submitted. Details to be submitted shall include:
- Species and locations of trees to be planted;
- Details of any hardstand areas, including paved and concrete areas;
- Fencing details including footings/posts. For more information please refer to Melbourne Water's website.
(a) a telecommunications network or service provider for the provision of telecommunication services to each lot shown on the endorsed plan in accordance with the provider's requirements and relevant legislation at the time; and
(b) a suitably qualified person for the provision of fibre ready telecommunication facilities to each lot shown on the endorsed plan in accordance with any industry specifications or any standards set by the Australian Communications and Media Authority, unless the applicant can demonstrate that the land is in an area where the National Broadband Network will not be provided by optical fibre.
(a) telecommunications network or service provider that all lots are connected to or are ready for connection to telecommunications services in accordance with the provider's requirements and relevant legislation at the time; and
(b) a suitably qualified person that fibre ready telecommunication facilities have been provided in accordance with any industry specifications or any standards set by the Australian Communications and Media Authority, unless the applicant can demonstrate that the land is in an area where the National Broadband Network.
(a) The plan of subdivision is not certified under the Subdivision Act 1988 within two (2) years after the issue of the permit; or
(b) The plan of subdivision is not registered within five (5) years after the certification of the plan of subdivision under the Subdivision Act 1988.
The Responsible Authority may extend the commencement periods referred
to if a request is made in writing before the permit expires or within six (6)
(a) The development is not started within two years of the date of this permit, or
(b) The development is not completed within four years of the date of this permit.
The responsible authority may extend the periods referred to if a request is made in writing before the permit expires, or within six months of expiry of permit. An extension of time to complete the development or a stage of the development may be requested if:
(c) The request for an extension of time is made within 12 months after the permit expires, and
(d) The development or stage started lawfully before the permit expired.
[1] The submissions and evidence of the parties, any supporting exhibits given at the hearing and the statements of grounds filed have all been considered in the determination of the proceeding. In accordance with the practice of the Tribunal, not all of this material will be cited or referred to in these reasons.
Singh
Casey CC [2025] VCAT 467
7.5 Although the objector does not reside in the immediate vicinity and lives in a different street, the objection cannot be given less weightage as mentioned in Edwards v Maroondah CC [2011] VCAT 1316. The objector purchased the property within the estate due to special character of the area ensured by the covenant. > > 7.6 The purpose of the covenant is to protect the amenity and neighbourhood character of the area. In Hill v Campaspe SC (includes Summary) (Red Dot) [2011] VCAT 949, the tribunal considered general amenity of the properties of the objectors and did not disregard their objection in the context of considering section 60(5). > > 7.7 The council does not consider that the objection should be considered vexatious as discussed in Castles v Bayside CC [2004] VCAT 864. The objection is directly related to the covenant. The objector is concerned that removal of covenant will result in trend of multi- unit development and ultimately will impact the amenity of the area which council considers that is the ultimate motive of the covenant. > > 7.8 It was made clear in Slaveski v Darebin CC (Red Dot) [2006] VCAT 593 that one genuine objection is enough to prevent the grant of permit. The council cannot ignore the objection as the objector has concerns that approving this application will result in trend of similar development and will change the neighbourhood character. > > 7.9 Out of 548 beneficiaries, remaining 1 beneficiary still stands with his objection against removal of the covenant. As in Vivarini v Whittlesea CC [2011] VCAT 217 weightage is given to the only objection based on fact that the test of Section 60(5) is to determine if any owner is unlikely to suffer any detriment of any kind including perceived detriment. The word 'any' is repeatedly used and it gives no room to move. The owner of 28 WillSlie Crescent has objected based on the grounds of amenity and character of the area. Although there are no other objections, no other owner except 10 Carluke Close has consented in writing. The net is cast much wider than the only objector. > > The test required by Section 60(5) sets a high bar and clearly states that permit must not be granted unless the Council officers are satisfied that no owner of land benefiting from the covenants will be likely to suffer any detriment of any kind. > > 7.10 The different concerns raised by the objector include neighbourhood character and traffic congestion during peak hours. Based on the fact that ground of the objection related to traffic issues might be weak, the objection by the beneficiary cannot be considered vexatious based on one weak ground, as mentioned in Trajkovski v Wyndham CC [2009] VCAT 1231. The objector has stated that one of the reasons they decided to purchase the property within the estate was the Covenant inhibiting subdivision. The council cannot overrule this objection in context of section 60(5) of the act. > > 7.11 Except few multi-unit development, the neighbourhood is dominated by single unit development surrounded by green environment due to the covenant restriction on the title.
(1998) 14 NSW LR 481