[2026] VCAT 144
General information, not legal advice.
Victorian Civil and Administrative Tribunal
2026-02-26
Original judgment source is linked above.
(a) carried out in a proper and workmanlike manner and in accordance with the plans and specifications set out in the building contract;
(b) that all material to be supplied for use in the Works will be good and suitable for the purpose for which they are used and that, unless otherwise stated in the contract, those materials will be new;
(c) carried out in accordance with, and will comply with, all laws and legal requirements;
(d) carried out with reasonable care and skill; and
(e) the Works would result in a home that was suitable for occupation at the time the Works were completed ('Warranties').
In considering whether it would be unreasonable to award the cost of rectification, the Tribunal should consider all the circumstances of the case before it. The nature and significance of the breach should be looked at in terms of the bargain the parties had and the relative importance of the breach within the context of the contract as a whole. The decision in Ruxley[4] suggests that account can be taken of the following matters at least:
(i) Whether and to what extent the work, although not in conformity with the contract, is nonetheless serviceable;
(ii) Whether and to what extent the defect has affected the value of the work or the building as a whole;
(iii) The cost of rectification, the proportion that the breach bears to the cost of rectification and whether the cost of rectification would be wholly disproportionate to the real damage suffered by reason of it;
(iv) The likelihood that, if rectification cost is awarded, the sum so ordered will actually be spent on rectification. Obviously, a successful plaintiff can spend his damages as he sees fit but this may be a useful indicator of whether the amount sought is greater than the real loss suffered.
Quite obviously, this list is by no means exhaustive ...
As stated in Bellgrove, the question of reasonableness is one of fact. Mr Sedal submitted, correctly I think, that the Builder bears the onus of proof that it would be unreasonable to award the full rectification cost. That was the view taken by Rares J of the Federal Court in Tabcorp and I respectfully agree.[5]
6 December 2015 Soil and geotechnical investigation report
February 2016 Architectural drawings, engineering drawings and computations
September 2016 Engineering drawings and certification
13 September 2016 Building contract between Builder and previous owner / developer
October 2016 Town planning permit issued and endorsed drawings
11 October 2016 Building permit issued for 4 town houses on Property
3 February 2017 Building permit varied - change of slab design to waffle slab
April 2018 Rear deck at north side of Unit 3 constructed
25 May 2018 Occupancy permit issued for building work, including Unit 3
(a) the Builder failed to construct the garage slab with a 600 mm edge beam as required by the engineering design ('edge beam defect');
(b) the Builder failed to ensure the edge beam of the garage slab was founded into the appropriate founding material required by the engineering design, being a minimum of 100 mm into clay and not fill ('foundation defect');
(c) the Builder failed to construct deepened footings along the northern boundary when the engineering design required this to be done due to the neighbouring apple tree being within the zone of influence ('deepened footing defect');
(d) other building defects to the northern deck, articulation joints to the garage door, articulation between the wall with Unit 4 and the garage brick piers ('other building defects').
(b) More importantly, Mr Irwin's evidence as to the height of the tree should be treated with caution by the Tribunal because:
- The estimate was based upon viewing from inside Unit 3;[48]
(ii) A photograph taken from that location and angled downward showed the majority of the tree;[49]
(iii) The height of Unit 3 meant that the highest the photograph could have been taken from was 4.7 m; and
(iv) Mr Jeffery disagreed with Mr Irwin's observations as to the height of the tree.
CAUSATION OF DAMAGE - REMOVAL OF TREES ON SITE AND/OR DEFECTIVE ENGINEERING DESIGN
I do not accept that the engineering design should have called for bored piers under the nearby garage wall in the same way as that specified for the wall on the western side of Unit 4. The design of bored piers on the western side of the Property was in response to the proximity of Unit 4 to a water or sewage easement along the western boundary;
The engineering design contained recommendations for design and construction of the footings to the dwellings, including the garages to each unit, where on site trees were removed before construction; and
I find the Builder was aware or ought have been aware of the removed tree and its likely impact on the foundations of the garage and failed to follow the design recommendations in this regard.
ISSUE 3 - SCOPE OF RECTIFICATION WORK AND COST - GARAGE DEFECTS
(a) it is significantly more costly than the alternative rectification methodology proposed by the Builder (i.e. resin injection or normal underpinning);
(b) assuming further movement is prevented, the only reason for demolition over underpinning is one of aesthetics and not performance or function;
(c) the Owners did not lead evidence that the current occupier of Unit 3 was unable to use the garage or insisted on its repair, or that the movement had disrupted keeping the property tenanted;
(d) the Owners did not lead any evidence about their intention to demolish and re-build the garage.[73]
[3] (Domestic Building) [2010] VCAT 1202, [165] (d).
[4] Ruxley Electronics and Construction Ltd v Forsyth [1994] 1 WLR 650.
[5] [2010] VCAT 1202, at [163].
[37] Transcript, 16 April 2025, page 114.
[41] Engineering drawings - Founding Note Due To Trees, Sheets 2, 3, 4 & 8 of 18.
[42] Where existing or proposed trees are within the zone of influence of any footing (ie. Within 1.0 x their mature height, within 1.5 x their mature height for group of trees), then the footings are to be deepened and founded directly onto weathered bedrock if present or 2.5 m below natural ground level, whichever is shallower. Alternatively these trees could be removed and soil re-moisturised, or alternative tree root barriers placed, then tree root barrier details provided can be omitted. N.B. arborist advice and/or council permit may be required prior to placement of tree root barriers, cutting tree roots, or removing trees.
[57] Jeffery supplementary report, TB 478 & 479.
[73] The Builder submits the Courts have held that lack of evidence of intent to carry out the works is of significant importance to establishing reasonableness: see Ruxley Electronics and Construction Ltd v Forsyth [1995] All ER, in particular at 288.
[79] Jeffery costings at TB 288 - $26,476, less cost to rectify rear deck ($5,773.75).
Scott
Seascape Constructions Pty Ltd [2026] VCAT 144
(2009) 236 CLR 272
(1954) 90 CLR 613