(a) major structural issues had been detected in the Building;
(c) a meeting between the City and the Applicant would be urgently arranged.[17]
Hay Street is closed and the City obtains its own structural engineering advice
... whether it is possible and the methods by which parts of the Building and 440 Hay Street which preserve the heritage values of the buildings can be stabilised, remediated, made safe and retained in situ or deconstructed ... with a view to other parts of the buildings not required to stabilise or retain the façades being demolished.
... There is a low risk that part of the façade of 424-436 Hay Street may fail if subject to an adverse environmental event (high wind, earth tremor). Therefore, the façade should be propped as soon as is practicable to maintain its stability. Further survey measurements and investigation should be undertaken to determine whether or not the façade can be stabilised and remediated. From a heritage perspective, it is reasonable to assert that there is a strong likelihood that the façade can be remediated and retained.
(b) refer the application to the Western Australian Planning Commission (WAPC) for comment; and
(c) assess the application in accordance with the City's planning framework.
(a) appoint a qualified consultant to design and install an appropriately rated hoarding fronting the Building; and
(b) issue a Building Order in relation to the Building to:
(i) design and install a temporary support structure;
(ii) provide the City with written confirmation by a suitably qualified expert that the temporary support structure has been designed and installed and is fit for purpose; and
(a) Within 14 days of the service of this Order, arrange for a suitably qualified structural and heritage engineer to design a temporary support structure to support the Hay Street façade of the Building which can be installed through the awning on the Hay Street side of the Building and provide a copy of the design to the City; and
(b) Within 28 days of the service of this Order, install the temporary support structure referred to in paragraph (a) above and provide to the City written confirmation by a suitably qualified structural and heritage engineer that the temporary support structure has been installed as designed and is fit for purpose.
.... that the respondent would procure 'the design of a temporary support structure to support the Hay Street façade of the building at 424436 Hay Street, Subiaco that is acceptable to the respondent'.
(a) set aside the heritage conservation notice for the Building;
(b) affirmed the building orders for the Building; and
(c) varied the date for compliance with the Emergency Building Order.
The City obtains further structural engineering advice
Our assessment concluded that the structural integrity of the façade and the dividing walls was compromised, but could be reinstated by repairing the cracks, improving the material restraint to the façade and stiffening the foundation material.
The City issues a further building order and an order for a grout trial is agreed
(1) A full geotechnical investigation to be carried out. This was carried out by Galt Geotechnics (Galt) which produced the Galt Geotechnical Report.
(2) Excavation to measure the footing sizes for the piers and dividing walls, with a structural engineer to assess the findings and specify the requirement for stiffening the footings, for example by grout injection.
(a) On 18 January 2023, a joint statement by Mr Donald MacMillan of BG&E and Dr Katz of Keystone Structural;
(b) On 21 January 2023, a joint statement by Mr Owen Woodland of Galt and Mr Terry Waters of Local Geotechnics;
(c) On 4 August 2023, a joint statement by Mr Woodland of Galt and Mr Waters of Local Geotechnics (Geotechnical Joint Statement);
(d) On 29 August 2023, a joint statement by Mr Frank van de Ven of Shorepile and Mr Derek Craig of Advanced Ground Solutions, both of whom are grout injection contractors (Grouting Contractor Joint Statement);
(e) On 29 August 2023, a report to the Applicant titled '424-436 Hay Street - Recent Site Investigations' (BG&E August 2023 Report); and
(f) On 6 September 2023, an updated joint statement by Mr MacMillan of BG&E and Dr Katz of Keystone Structural (Engineering Joint Statement).
(a) an application for development approval lodged with the State Development Assessment Unit in July 2020, made pursuant to Pt 17 of the PD Act (SDAU Application); and
(b) an application for development approval dated 15 September 2023, made to the Metro Inner-North Joint Development Assessment Panel (JDAP Application).
(i) a lean of up to 160 millimetres towards Hay Street. The brick parapet wall has an outward bow associated with this lean;
(ii) not moved (outside the tolerance of the survey equipment) since survey measurements were recorded, commencing on 23 January 2023.
(b) At some unknown point, before the surveying of the façade commenced, Pier 7 appeared to have rotated 0.043 degrees over a 23-month period. Other than Pier 7, the remaining façade has not undergone measurable movement (outside the survey tolerance) since the surveying commenced in February 2021.[45]
Works that are urgently necessary for any of the following -
The works are not located in a heritage-protected place of a kind referred to in cl 1A(1)(a), (b) or (d).
(a) that is entered in the State Register of Heritage Places under the Heritage Act 2018 section 42; or
(b) that is under consideration for entry into the State Register of Heritage Places as described in subclause (2); or
(c) that is the subject of an order under the Heritage Act 2018 Part 4; or
(d) that is the subject of a heritage agreement that has been certified under the Heritage Act 2018 section 90; or
(e) that is included on a heritage list as defined in clause 7; or
(f) that is within a heritage area as defined in clause 7.
public adjective 1. of, relating to, or affecting the people as a whole or the community, state or nation: public affairs.
safety noun 1. the state of being safe: freedom from injury or danger.
necessary adjective 1. that cannot be dispensed with: a necessary law
urgent adjective 1. pressing; compelling or requiring immediate action or attention; imperative [with 'urgently' being the adverb for 'urgent'].
(a) the only way to ensure public safety is to undertake the works; and
(b) the works need to be done without delay to ensure public safety.
(a) public safety can be ensured other than by undertaking the demolition works, as the works would not then be 'necessary' for public safety; and
(b) if the works do not need to be undertaken without delay in order to ensure public safety, as the works would not then need to be undertaken 'urgently'.
(a) there is a risk of imminent collapse of the façade notwithstanding the temporary support structure; and
(b) if there is an imminent risk of collapse, is there any alternative to demolition that would ensure public safety.
(a) while '[t]he masonry [façade of the Building leans] southwards towards Hay Street ... the [façades] are not at immediate risk of collapse'; and
(b) there 'is a low risk that part of the [Building façade] may fail if subject to an adverse environmental event (high wind, earth tremor). Therefore, the façade should be propped as soon as is practicable ...'.
Issue 1: Whether the Building is in an active state of rotation
So I took my computer model, which is - which started as a flat façade, and rotated it one degree or so, whatever the values were. 1.3 [degrees], worst case. I've also rotated it to two degrees, and - and it's not - it's not overturning. So, in my mind, it - it - it's not in an overturning mode.
That's not the - the key issue, and that's really - that's really why it's not explicitly stated because it's - it's just nowhere near - in a sense, that's an anecdotal or a qualitative statement. You know, I haven't tried to estimate what would it be involved to rotate it so far that it's now going to collapse. In other words, it's going to overturn. The centre of gravity is in front - is outside of the - of the support envelope ... You know, we - we were talking about this other concept of the middle third, but the centre of gravity that needs to be outside of the base before the thing falls over.
In the case of the tissue box, it's - it's quite a steep angle. I also think it needs to be quite a steep angle for the facade. But I haven't needed to go there because it's just not currently a risk in my calculations. Clearly, Mr MacMillan has come up with a very different approach that has justified that that could happen.
Pier 4 rotated, weight only, 12 kN resisting: 115kPa
Pier 4 rotated, weight, earthquake, 18 kN resisting: 132kPa
Pier 2 rotated, weight only, 12 kN resisting: 157kPa
Pier 2 rotated, weight, earthquake, 18kN resisting: 172kPa
I have examined the available quantitative and qualitative evidence of façade movement, including survey data, tell-tale crack gauges, onsite assessment of crack widths, and comparison of a current and historic photographs. I concluded that the façade has not been in an active state of movement since current measurements on 23 January 2023. Prior to that, Pier 7 appeared to have rotated by 0.043 degrees over 23 months. Other than at Pier 7, the remaining façade has not been in an active state of movement since survey records commenced in February 2021.
(a) there was 'observed movement' in the Building as well as cracking;
(b) the soil beneath the façade foundation is very loose (poorly compacted);
(c) surveying of the façade indicates ongoing movement;
(d) the tell-tales indicate movement up to 12.5 mm;
(e) the centre of mass of the piers is, in places, outside of the middle third and are at risk of overturning; and
(f) the temporary building support will not prevent further rotation of the piers onto Hay Street.[96]
(a) there is no integrated foundation system below the Building;
(b) the basis upon which Keystone Structural had previously assessed the foundations is not valid as no concrete strip footings have been located; and
(c) the calculated bearing pressure on the measured pad footings below the pier footings exceed the ultimate bearing capacity of a loose sand foundation.
(c) the soils at the site are assessed as loose extending to around 0.45 metres to 1.65 metres below the bases of the pier footings;
(d) differential settlement of the pier and cross-wall footings, due to the foundational material, is the key contributing factor to the observed movements of the Building;
(e) the Galt Geotechnical Report described the soil as unpredictable and with minimal external influence (vibration or introduction of water) may lead to uncontrolled settlements and an extreme risk of collapse;[105]
(f) the Horizon Surveys results show there is continued and ongoing settlement and Building movement;
(g) the existing façade is considered to be active, unstable and, due to the risk of unpredictable settlements, at risk of collapse;
(h) the propping that has been installed in the Building is ineffective and will not prevent or contain a collapse. There is a trend, which is ongoing, of outward and downward movements;[106]
(i) the masonry is brittle and there is no redundancy or alternative load paths available in the building structure; and
(j) the Building façade presents an extreme risk to safety.[107]
(a) Swanston Street wall collapse, Melbourne (2013);
(c) Matilda Bay Brewery, Perth façade parapet collapse (2017); and
(d) Westralia Square, Perth pedestrian footbridge collapse (2019).
The Building has moved well outside of the acceptable structural limits resulting in large cracks and defects in the building fabric. ... The masonry is brittle in nature and there is no redundancy or alterative load paths available. The supporting soil is loose and highly stressed and there is an ongoing trend of vertical settlement. Given these observations, the behaviour of the building in its current state and during any proposed remediation works cannot be predicted. There would be a lack of warning of any partial or full collapse[.]
(a) the supporting sand beneath the Building is loose and is subject to ongoing and unpredictable settlement;
(b) the Building façade has settled and significantly rotated;
(c) the bearing capacity of the sand has been exceeded;
(d) the rotation of the Building has resulted in walls becoming unstable;
(e) the remedial works proposed for the Building address the consequence of the façade's movement, but do not address the cause;
(f) the existing propping of the Building is ineffective in addressing the potential for ongoing settlement and rotation;
(g) BG&E's calculations demonstrate that a limited amount of further settlement and rotation would result in the collapse of the façade;
(h) grouting is not a safe option to stabilise the façade and may cause instability and induce a collapse;
(i) the large sinkhole that opened adjacent to 440 Hay Street indicates the presence of very loose material which may result in sudden and significant ground movement;
(j) the façade can barely be justified to stand on its own. Significant wind or seismic events would theoretically overstress them, with a consequent risk of collapse;
(k) the reports prepared by Keystone Structural/Quoin appear to make overly simplified and erroneous assumptions relating to the geometry of the walls, the nature of the foundations and the capacity of the soil as well as ignoring significant events such as the appearance of the sinkhole and the advice from grouting contractors that their operations would destabilise the façade further;
(l) the building order issued by the Respondent, the subject of the Building Order Review, is ineffective at addressing the concerns of the moving façade and the order relating to grouting could trigger the collapse of the Building; and
(m) further monitoring between late 2022 and late 2023 indicate that the façade continues to move towards the point of collapse.
(a) the Building includes masonry piers which sit on concrete pad footings (of unknown strength). The piers are the dividing walls between the tenancies;
(b) there are no concrete strip footings below the tenancies dividing walls. The walls widen at base and are constructed directly on top of natural soil;
(c) the soil below the foundations is natural sand;
(d) there are vertical cracks in six of seven of the cross-walls which are typically wider at the top;
(e) there has been rotation of the façade towards Hay Street caused by differential settlement of the pier and cross-wall footings due to the foundation material;
(f) the structural integrity of the façade wall is compromised;
(g) soil bearing pressure is higher than would be allowable for soil of this nature with the consequence being there is potential for greater settlement; and
(h) there is no evidence that the grout injections recommended in the Pritchard & Francis Report were ever carried out.
(a) there has been no discernible movement of the Building outside of the limits of the measuring capabilities of the Total Station[111] that was used for the surveys (the tolerances being +/- 5mm); and
(b) any 'lean' in the Building will be discernible in changes to the 'Northing' co-ordinates. The survey results indicate that aside from one (anomalous) reading, any movement of the façade falls within about + or - 2 mm of the mean of all measurements (also being the limit of accuracy of the Total Station).[112]
Disposition of Issue 1: the Building is not in an active state of rotation
All witnesses must tell the whole truth, not just those parts of the truth that are consistent with a particular narrative. Expert witnesses also owe an ethical obligation to assist the decision maker, whether it is a court or tribunal, come to the correct decision.
BECKETT, MR: So do you have categoric evidence that the building moved between 1989 and 2021?
WITNESS, MACMILLAN: No, we don't. No.
BECKETT, MR Isn't it then possible that the building, on your interpretation, it has been urgently necessary to demolish it since 1989?
WITNESS, MACMILLAN: Yes, you could say that. Yes.
BECKETT, MR: That's okay. Mr MacKerron, you've got any evidence that the building has moved since 1989?
WITNESS, MACKERRON: No. No. But again - - -
BECKETT, MR: No, no. It's just no.
WITNESS, MACKERRON: No.
BECKETT, MR: So, and do you have any evidence that in 2021 it was any different from 1989?
WITNESS, MACKERRON: No.
BECKETT, MR: Any evidence that it was any different now from 1989?
WITNESS, MACKERRON: So the - I know there was an event in 2021 that precipitated this current discussion, and that was bricks falling off a wall inside. Something happened to cause that. So that - that, in itself, suggests some form of movement, some form of something changing, but there's - in terms of measured data there isn't.
Issue 2: Whether demolition is urgently necessary as a matter of public safety
While there has been some historic rotation; the Building is stable
The choice between conflicting experts may have to be a matter of judgment and not of detailed reasoning.
Expert opinion evidence is needed to enable decision-makers to understand evidence before them and to make their decisions about disputed facts. Judges and tribunal members need to be able to understand the expert evidence and be confident about relying upon it. Decision-makers need to look for touchstones of reliability, the indicia being impartiality, pertinent prior experience, a disinclination by the expert to step beyond their limits of expertise, and familiarity with the facts. In short, the decision[-]maker needs to feel secure that the application of expert opinion to the facts in dispute is truly fair and reasonable.
So, the calculations that I described before demonstrated that with additional rotation the bearing pressure doesn't increase very suddenly or very much or exponentially or even kind of linearly, an increase if you like, a doubling of one to two degrees of rotation doesn't equate to anything like that kind of change. So, I would say that we will start to see that movement in the survey before any kind of sudden collapse. I also said that the building isn't near this tipping point or this overturning point where that results in centre of gravity is near the toe of the footing.
There's some way to go before that ...
The continued movement recorded compaction results and geotechnical commentary highlighting the risk of unpredictable and uncontrolled settlement show that the soil materials are not adequate to support the load of the face wall.
BECKETT, MR: So we were told it's moving. We discussed the Peter Bonus evidence. There was cross-examination about the graphs and the outliers. There were then some concessions on day 2 that maybe the results don't show what it said - sorry, what they said it initially showed, and then we had a strange - again, repeated this yesterday. So we've got Mr MacMillan saying that the building is in an active state in his reports.
He also states it specifically at item 5 of the joint report, so the most recent relevant thing he has filed was still up until that point relying on an assumption that the building is active. When confronted with the evidence that it might not be active, he said it didn't matter. It's not relevant. Mr MacKerron didn't quite go that far, but he made a similar remark - it doesn't matter whether it's moving or not.
It was remarkable to hear that, after so much of their evidence and their conclusions was entirely predicated as that being a key factor behind the instability of the building. It doesn't matter. It's not relevant, but we will produce cherrypicked graphs to show what we want it to show, that apparently do show movement. But then when we're confronted on that we say that we didn't actually rely on those at all. And it's just a fact, and it's just part of what was put to the Tribunal.
But that didn't stop there. ...- they say they didn't rely on it at all. Yesterday under cross-examination, or reexamination, I should say, Mr MacMillan said he didn't even use that information in any of his conclusions. And then again, confronted with his own report, his own calculations that clearly shows the 2024 surveys factor in movement - and this is evidence he has given for four days as to his conclusions about the safety of the building, and then at the end of the final hearing he says yes, okay, I did have regard to those assumptions.
He initially denied it. Ultimately said that that is part of what he took into account. It's in the preamble to the risk assessment he prepared. It's referenced in the 2022 BG&E report. It's littered throughout their evidence. And then strangely, when confronted with the possibility that maybe the building is not moving, they're response is that it doesn't matter anyway, and it's not relevant. We don't understand it.
Simple calculations indicate that an additional horizontal movement of 20 mm at the top of the façade piers could increase the load bearing value up 290 - 300 kPa. In such an instance, demolition would likely be required to ensure safety. This is the main reason why vertical propping is essential until foundation consolidation is carried out.
Simple calculations.... could increase the load bearing value up 290 - 300 kPa. In such an instance, demolition would likely be required to ensure safety. This is the main reason why vertical propping is essential until foundation consolidation is carried out.
Meaning of the phrase 'urgently necessary' for 'public safety'
Disposition of Issue 2: demolition of the Building is not necessary nor urgent
The reviewable decision does not extend to making a determination as to whether the Building can, in fact, be saved
Is demolition urgently necessary for public safety?
Why I am satisfied that there is a risk of collapse that needs to be urgently addressed
Why I believe demolition is the only available course of action
Why I believe that failure constitutes a risk to public safety
...
(b) To encourage high quality, pedestrian friendly, street-oriented development that integrates with surrounding areas.
...
(e) To ensure that building frontages at the street level assist in the creation of safe built environments.
I certify that the preceding paragraph(s) comprise the reasons for decision of the State Administrative Tribunal.
[1] Sanur Pty Ltd and City of Subiaco [2021] WASAT 90; (2021) 103 SR (WA) 1 (Sanur No 1); see also Sanur Pty Ltd and City of Subiaco [2021] WASAT 90 (S); (2021) 103 SR (WA) 67 (Sanur No 2).
[2] Building Regulations 2012 (WA), reg 19(1).
[3] The deemed provisions are made pursuant to s 257B of the PD Act.
[4] More precisely, item 18 of the Table in cl 61(1).
[7] Pritchard & Francis Pty Ltd Consulting Engineers, 'Report on Cracking of Dividing Walls to Shops at 424 Hay Street, Subiaco', 1989.
[14] Exhibit 4, para 12 and Exhibit 5, item 27.
[36] Together with matters DR 50 of 2021 and DR 52 of 2021 which related to 440 Hay Street; Exhibit 1, para 95.
[39] Being a device to measure or detect cracks in buildings.
[46] Building Act, s 10. Demolition work relevantly means the 'demolition, dismantling or removal of a building or an incidental structure': Building Act, s 3.
[51] Newco Mills Pty Ltd and Presiding Member of the Metro Outer Joint Development Assessment Panel [2021] WASAT 160 (Newco Mills) [31] - [32].
[53] Agricorp Australia Pty Ltd t/as VMS Contractors and Shire of West Arthur [2025] WASAT 40 [116]; Landcorp and City of Stirling [2011] WASAT 202 [44].
[55] Harvis Capital Pty Ltd v Mid-West/Wheatbelt Joint Development Assessment Panel [2020] WASC 205 [77] - [78], [80] (Allanson J).
[56] ts 224, 232, 233, 29 October 2024.
[59] Exhibit 9, para 20, Exhibit 13 (Joint Report).
[63] ts 342, 30 October 2024; see also Exhibit 5, DM005.
[69] kN is a kilonewton, a unit of force in the International System of Units (SI) that equals 1,000 newtons. A 'newton' is a SI defined as the force required to accelerate a one-kilogram mass at a rate of one metre per second squared.
[82] The BG&E Report 1 was prepared in September 2022; the BG&E Report 2 Rev A was prepared in July 2023 and the BG&E Report 2 Rev B in August 2023.
[88] ts 431, 432 and 454, 2 December 2024.
[99] Applicant's Bundle, pages 291 and 299.
[103] Exhibit 13, pages 11 and 12, DM004/DM005.
[110] kPa means kilopascal being a unit of pressure widely used in the metric system.
[111] A Total Station is a surveying instrument which integrates an electronic theodolite with an electronic distance measurement. The instrument used was a Topcon GT 603.
[118] Harper Investments WA Pty Ltd and Presiding Member of the Metro Inner-North Joint Development Assessment Panel [2023] WASAT 130 [51].
[119] Jones v Dunkel [1959] HCA 8; (1959) 101 CLR 298.
[122] At the resumed hearing on 2 December 2024; see also ts 554 - 555, 3 December 2024.
[125] Housing Commission of New South Wales v Tatmar Pastoral Co Pty Ltd (1983) 3 NSWLR 378, 381.
[126] Lombardi Investments (WA) Pty Ltd and City of Cockburn [2009] WASAT 65 [43].
[127] Darling Downs Estate Pty Ltd and WAPC [2016] WASAT 76 [26] see also Cockatoo Blue Pty Ltd and Metropolitan Central Joint Development Assessment Panel [2017] WASAT 59 [28].
[133] Although some extracts of that modelling were included. Refer [161] above.
[134] ts 248, 29 October 2024; Exhibit 2, page 752.
[141] ts 436, 2 December 2024; Exhibit 13, pages 10 - 13.
[144] Zorzi and Town of Cambridge [2025] WASAT 77 [157].
[149] Citta Hobart Pty Ltd v Cawthorn [2022] HCA 16; (2022) 276 CLR 216 [17] (Kiefel CG, Gageler, Keane, Gordon, Stewart and Gleeson JJ).
[150] Presiding Member of the Southern Joint Development Assessment Panel v DCSC Pty Ltd [2018] WASCA 213; (2018) 54 WAR 89 [76] - [80] (Buss P, Murphy and Mitchell JJA); The Match Group v Metropolitan South West Joint Development Assessment Panel [2014] WASCA 50; (2014) 2000 LGERA 227 [20] - [23] (Pullin JA, Newnes JA, Murphy JA).
Agricorp Australia Pty Ltd t/as VMS Contractors and Shire of West Arthur [2025] WASAT 40
Citta Hobart Pty Ltd v Cawthorn [2022] HCA 16; (2022) 276 CLR 216
Cockatoo Blue Pty Ltd and Metropolitan Central Joint Development Assessment Panel [2017] WASAT 59
Darling Downs Estate Pty Ltd and WAPC [2016] WASAT 76
Harper Investments WA Pty Ltd and Presiding Member of the Metro Inner-North Joint Development Assessment Panel [2023] WASAT 130
Harvis Capital Pty Ltd v Mid-West/Wheatbelt Joint Development Assessment Panel [2020] WASC 205
Jones v Dunkel [1959] HCA 8; (1959) 101 CLR 298
Landcorp and City of Stirling [2011] WASAT 202
Lombardi Investments (WA) Pty Ltd and City of Cockburn [2009] WASAT 65
Newco Mills Pty Ltd and Presiding Member of the Metro Outer Joint Development Assessment Panel [2021] WASAT 160
Presiding Member of the Southern Joint Development Assessment Panel v DCSC Pty Ltd [2018] WASCA 213; (2018) 54 WAR 89
Sanur Pty Ltd and City of Subiaco [2021] WASAT 90 (S); (2021) 103 SR (WA) 67
The Match Group v Metropolitan South West Joint Development Assessment Panel [2014] WASCA 50; (2014) 2000 LGERA 227
Zorzi and Town of Cambridge [2025] WASAT 77
(2022) 276 CLR 216
(1983) 3 NSWLR 378
(1959) 101 CLR 298
(2018) 54 WAR 89
(2014) 2000 LGERA 227