[2025] VCAT 552
General information, not legal advice.
Victorian Civil and Administrative Tribunal
2025-06-23
Original judgment source is linked above.
APPENDIX A - RESPONSIBLE AUTHORITY STATEMENT OF GROUNDS
Construct a building, or construct or carry out works associated with a child care centre
(a) The render wall cladding replaced with weatherboard, timber shiplap or cement sheet with vertical or horizontal grooves no more than 200mm apart.
(b) Elevations of the store and waste areas to include a material and colours schedule.
(c) The location of the footpath along the Peady Street frontage with a pram crossing on the corner of Peady Street and Trethowan Street as required by Condition 40.
(d) The marked centre line at the corner of Peady Street and Trethowan Street accurately annotated on all relevant plans.
(e) Location of HVAC and any other plant and associated visual and acoustic screening in accordance with the Acoustic report required by Condition 23.
(f) A dimensioned fencing plan to include but not be limited to the following:
- The location of all fencing and retaining walls.
- Acoustic fencing as required by Condition 24. The acoustic fencing to include:
(1) A 2 metre high acoustic fence (inclusive of any retaining walls) alongside the north west boundary adjacent the building and outdoor play area
(2) A 1.5 metre high acrylic acoustic barrier along the north west edge of the deck, adjacent child care room 3 (extending to the corner of the deck).
(g) Landscape Plans as required by Conditions 8.
(h) Height of fill.
(i) Car parking spaces 9 to 15 annotated as staff car parking.
(j) Cross sections (southwest to northeast) at the following intervals (approximate) measured from Cobden Street boundary:
- 17.5 metres (within the building)
- 30.0 metres (entry of building)
- 37.0 metres (rear of building)
- 44.0 metres (approximate centre of outdoor space)
- 52.0 metres (rear of outdoor space/car park area)
- 57.0 and 63.0 metres (rear of waste area and either side of driveway)
- 68.0 metres (within the carpark)
All to the satisfaction of the Responsible Authority.
(a) The childcare centre: Monday to Friday; 6.30am to 6.30pm.
(b) The outdoor play areas between 8.00am to 6.00pm.
(a) 9:00am and 8:00pm Monday to Saturday
(b) 10:00am and 7:00pm Sunday and Public Holidays
(a) A layout consistent with the architectural drawings prepared by Petridis Architects, dated 2 April 2025 and any changes required by Condition 1.
(b) Any landscaping that is in the location of the swept paths of vehicles to be plants no higher than 120mm from the finished surface level of accessway on the northern side of the car park.
(c) The location of all trees along the boundary of the adjoining lots.
(c) Details of surface finishes of pathways and driveways;
(d) A planting schedule of all proposed trees, shrubs and ground covers, including botanical names, common names, pot sizes, size at planting, sizes at maturity, and quantities of each plant.
Completion and Maintenance of Landscaping Works
(a) Provide a Tree Protection Management Plan (TPMP), to be developed by a suitably qualified minimum AQF Level 5 arborist, to ensure successful retention of street tree/s and trees on adjoining properties.
Once endorsed this SDA will then form part of the permit and the development must be constructed in accordance with it unless otherwise agreed in writing by the Responsible Authority.
(a) Hours of demolition and construction to accord with Local Laws;
(b) Management of surrounding streets to ensure all are kept free of parked or standing vehicles or any other obstruction, including building materials, equipment, etc. to maintain free vehicle passage to abutting benefitting properties at all times, unless with the written consent of the Responsible Authority;
(c) Methods to contain dust, dirt and mud within the site and the method and frequency of clean up procedures, including the management of on-site waste storage construction bins and vehicle washing. If dust is created by construction and/or demolition works, appropriate measures must be immediately taken to suppress dust movement off site;
(d) Management of parking of construction machinery and workers vehicles to prevent adverse impacts to nearby properties;
(e) Management of heavy vehicles, site deliveries and unloading and lifting points and expected frequencies and traffic management in the vicinity of the site to ensure routes to and from the land minimise disruption to nearby residential properties;
(f) The measures to minimise disruption to pedestrian movements along adjacent footpaths;
(g) Measures to minimise noise and other amenity impacts from mechanical equipment, including idling trucks and construction activities, especially outside of daytime hours where this is permitted. Construction and/or demolition works must comply with the requirements specified in the Environment Protection Authorities, Noise Control Guidelines Publication 1254.
(h) The provision of adequate environmental awareness training for all on-site contractors and sub-contractors; and
(i) A liaison officer for contact by the public and the Responsible Authority in the event of relevant queries or problems experienced.
(j) Prior to the commencement of any works on site, a Waste Disposal and Management Plan shall be submitted to the Responsible Authority for approval. The plan must detail:
- Where all building rubble and materials including soil is to be removed to off site. Note all materials must be taken to approved waste receiving sites or recycling centres. The site soil may be contaminated and should be disposed to an authorised facility in accordance with EPA regulations.
- Provision for materials recycling and collection during site construction.
- All necessary approvals shall be gained prior to materials being handled and disposed of in accordance with the Disposal Plan to the satisfaction of the Responsible Authority.
All works on the land must be undertaken in accordance with the endorsed Construction Management Plan to the satisfaction of the Responsible Authority.
(a) Objectives / purpose.
(b) Management Plan
(c) Hours of operation including:
- staff arrivals and departures
- family and children arrivals and departures
(d) Capacity of the centre
(e) Staffing
(f) Car parking
(g) Managing traffic and parking, including measures to discourage patron car parking in the adjoining streets and preclude staff parking in designated patron car parking areas.
(h) Deliveries
(i) Noise management
(j) Safety and security
(k) Emergency procedures
(l) Waste management
(m) Centre maintenance
(n) Complaint management
(o) Collection of rubbish from road reserves and car park area in the vicinity of the premise and external areas used by children and carers of the centre.
All to the satisfaction of the Responsible Authority.
The waste management must be undertaken in accordance with the endorsed Waste Management Plan to the satisfaction of the Responsible Authority.
(a) Constructed with asphalt or concrete;
(b) Properly formed to such levels that they can be used in accordance with the plans;
(c) Drained;
(d) Line-marked to indicate each car space and all access lanes;
(e) Clearly marked to show the direction of traffic along access lanes and driveways.
(a) The reshaping of the nature strip following the new crossing in Peady Street top dressing the area with a 75 mm rolled depth of good quality loamy topsoil free of any weed or seed.
(b) Seeding the area with an appropriate seed mix.
All works shall be completed in accordance with Council's Landscape Design Manual to the satisfaction of the Responsible Authority prior to the use approved commencing.
(a) The development is not started within two years of the issue date of this permit.
(b) The development is not completed within four years of the issue date of this permit.
(c) This use does not commence within two (2) years after the completion of the development.
In accordance with section 69 of the Planning and Environment Act 1987 (Vic), an application may be submitted to the responsible authority for an extension of the periods referred to in this condition.
[1] The submissions and evidence of the parties, any supporting exhibits given at the hearing and the statements of grounds filed have all been considered in the determination of the proceeding. In accordance with the practice of the Tribunal, not all of this material will be cited or referred to in these reasons.
[2] Practice Note of the Victorian Civil and Administrative Tribunal that sets out the process when an applicant wants to amend the application.
[3] 25 Waters Pty Ltd v Maroondah City Council [2024] VCAT 942 at [38].
[4] [2024] VCAT 711 at [102] and [103].
[5] [2020] VCAT 45, [74].
[6] [2024] VCAT 781, [33]-[34].
[7] [2020] VCAT 767, [22]-[27].
[9] [2018] VCAT 937 at [34].
[10] Accompanying photo on Plan TPA02 shows metal picket fence.
[11] Noting that Mr Spaull's evidence is based on landscape design, not arboriculture.
[12] [2021] VCAT 1191 at [68] and [69].
[14] A B99 vehicle represents the largest class of passenger and light commercial vehicles, representing the 99 percentile of vehicles in terms of size and turning path under the relevant Australian Standard.
[16] Page 26 of Statement to the Victorian Civil and Administrative Tribunal by Matthew Woollard dated 12 May 2025.
Sangireddy
Ballarat CC [2025] VCAT 552