ties: SafeWork NSW (Prosecution) Investa Asset Management (Defendant) Representation: Counsel: J Agius SC with M Moir (Prosecution) P Strickland SC with D Nagle and J Adamopoulos (Defendant)
Solicitors: SafeWork NSW (Prosecution) Allens (Defendant) File Number(s): 2017/96205 Publication restriction: None
Judgment
Facts
The elements of the offence
The relevant law
consideration
Issues of credit relating to the lay witnesses
Element 3 - Did the defendant fail to comply with its health and safety duty by failing to take the steps particularised in [6] of the Summons?
(a) In accordance with AS 2550.13-1997 and AS 2550.1-2011, arrange for a 10-year major inspection of the BMU, including strip-down inspection and non-destructive testing, to be conducted by a competent person for assessment of suitability for continued safe operation.
(b) Implement the recommendation for a 10-year major inspection of the BMU to be conducted when the defendant was notified by Building Maintenance Unit Service Pty Ltd on or around 2 April 2015 that the inspection was due.
(d) Require that documentary evidence verifying that the BMU had undergone and passed 10-yearly non-destructive testing be produced before permitting the BMU to be operated at the premises.
The risk
The likelihood of the risk occurring
The degree of harm
The defendant's knowledge of the risk and the ways of eliminating or minimising the risk
Contractual obligations of BMUS and reliance on it as a specialist contractor
The defendant's knowledge of the need for a major inspection of the BMU
The availability and suitability of ways to eliminate or minimise the risk
Was the cost involved disproportionate to the risk?
(c) Refuse to permit the BMU being operated at the premises until the 10-year major inspection, including non-destructive testing was completed.
Conclusion on Element 3
Element 4 - Did the defendant's breach of duty expose Mr Wilson and Mr Castellanos to a risk of death or serious injury?
Does the determination of causation involve an analysis of what would have occurred if a major inspection had been carried out?
What was the cause of the failure of the right hand stud and when could it have been noticed?
The evidence of Dr Casey
The evidence of Mr Kirszman
Consideration
Conclusion on Element 4
Conclusion
DISCLAIMER - Every effort has been made to comply with suppression orders or statutory provisions prohibiting publication that may apply to this judgment or decision. The onus remains on any person using material in the judgment or decision to ensure that the intended use of that material does not breach any such order or provision. Further enquiries may be directed to the Registry of the Court or Tribunal in which it was generated. Decision last updated: 27 March 2019
SafeWork NSW
Investa Asset Management Pty Ltd
[2016] VSCA 55
[2012] WASC 99
[2011] WASCA 117
[1999] NSWIRComm 453
(2012) 246 CLR 92
(1985) 11 IR 467
(1952) 87 CLR 313
(2006) 225 CLR 553
(2010) 239 CLR 531
(2008) 232 CLR 397
(1991) 172 CLR 378
(2001) 205 CLR 304
(1957) 97 CLR 337
(2010) 78 NSWLR 94
(1985) 8 FCR 27
(2004) 135 IR 166
(1998) 82 IR 80