(a) Full work schedule/construction management plan for each individual stage to ascertain impacts on surrounding properties.
(b) Public/worker access and safety issues;
(c) Hours of construction activity (including at what stage "out of hours works" are proposed and what type of works are to be conducted outside the hours of operation;
(d) The location of hoardings, hoists and workers' amenities;
(e) The location of public precautions, loading zones, site sheds, materials, cranes and crane/hoisting zones, gantries and any other construction related items or equipment to be located in any street;
(f) Details as to how traffic and pedestrian safety and amenity will be controlled within the vicinity of the site and its surrounds;
(g) The provision of a traffic management plan, including detailed plans that show the areas required for and the nature of items to be placed on any street during all stages of construction in accordance with approval by the responsible Building Surveyor, entry and exit points for construction vehicles (including temporary and permanent vehicle crossings), traffic management during construction including road closures/road occupation/footpath closures, work zones/construction zones to accommodate vehicles and deliveries;
(h) Service connections/road and footpath openings and anticipated impact on public land during the connection of different services;
(i) Measures to be used to protect Council infrastructure from damage;
(j) Existing services and environmental management;
(k) A list of all environmental hazards that the activities on-site pose i.e.; contaminated soil, materials and waste, dust, stormwater contamination from run-off and wash-waters sediment from the site on roads, construction noise, hours of operation, vibration, washing of concrete trucks and other vehicles and machinery, spillage from refuelling cranes and other vehicles and machinery etc;
(l) Protection measures that will be undertaken to minimise the risk of the above hazards being realised;
(m) Regular monitoring/inspections of the above protection measures;
(n) Identification as to who will be responsible for managing all of the above issues; and
(o) Measures required for interim or temporary site management; including temporary site access; car parking provision; treatment and/or screening of vacant spaces;