Background Facts and relevant aspects of the Planning Instruments Framework
The zoning of the Subject Land - Metropolitan Region Scheme
The City of Cockburn Town Planning Scheme - Land classification
Key provisions of TPS3 in relation to the Structure Plan
Notwithstanding clause 6.2.12.2, and without limiting the provisions of clause 6.1.2 or the extent of any provisions which may be included for a Special Control Area in Schedule 11, a Structure Plan may:
(a) Impose a classification on the land included in it by reference to reserves, zones or the Residential Design Codes;
(b) Identify precincts or otherwise place a designation on any land as an alternative, or in addition to classifying the land in accordance with the preceding paragraph; and
(c) Indicate the permissibility of land uses within any part or all of the land in the Structure Plan,
and where a Structure Plan includes any such matter it shall have effect according to its tenor as if it were part of the Scheme, unless the provisions of Schedule 11 relating to the Special Control Area are to the contrary.
(emphasis added)
(b) commence or carry out development on a Local Reserve,
without first having obtained planning approval under Part 9 of the Scheme.
3.4.2 In determining an application for planning approval the local government shall have due regard to
3.4.3 In the case of land reserved for the purposes of a public authority, the local government is to consult with that authority before determining an application for planning approval.
shall have due regard to such of the following matters as are in the opinion of the local government relevant to the use or development [the] subject of the application
(a) the aims and provisions of this Scheme and any other relevant town planning scheme(s) operating within the Scheme Area, including the [MRS];
(b) the requirements of orderly and proper planning including any relevant proposed new town planning scheme or amendment, or region scheme or amendment, which has been granted consent for public submissions to be sought;
...
(g) in the case of land reserved under the Scheme, the ultimate purpose intended for the reserve;
...
(y) any relevant submissions received on the application;
(z) the comments or submissions received from any authority consulted...; and
(za) any other consideration the local government considers relevant.
The amendment of TPS3 to reflect the Deemed Provisions
(b) commence or carry out development on a Local Reserve,
Without first having obtained planning approval under Part 7 of the Deemed Provisions.
2.4.2 In determining an application for planning approval the local government shall have due regard to
(a) the matters set out in clause 67 of the Deemed Provisions; and
(b) the ultimate purposes intended for the Reserve.
2.4.3 In the case of land reserved for the purposes of a public authority, the local government is to consult with that authority before determining an application for planning approval.
5.1.1 The following Special Control Areas are shown on the Scheme Map
(a) Development Areas shown on the Scheme Map as DA with a number and included in Table 9.
(b) Development Contribution Areas shown on the Scheme Map as DCA with a number and included in Table 10.
5.1.2 In respect of a special control area shown on a Scheme Map, the provisions applying to the special control area apply in addition to the provisions applying to any underlying zone or reserve and any general provisions of the Scheme.
...
5.2.1 Table 9 describes the Development Areas in detail and sets out the specific purposes and requirements that apply to the Development Areas.
5.2.2 Subdivision and Development in Development Areas
5.2.2.1 The development of land within a Development Area is to comply with Table 9.
5.2.2.2 The subdivision and development of land within a Development Area is to generally be in accordance with any structure plan that applies to the land.
The terms of the Structure Plan, as at 18 September 2017, when the Subject Land was conveyed to the FES
(a) that land is reserved ... under the planning scheme for a public purpose; or
(b) the scheme permits development on that land for no purpose other than a public purpose; or(c) the scheme prohibits wholly or partially
(i) the continuance of any non-conforming use of that land; or
(ii) the erection, alteration or extension on the land of any building in connection with or in furtherance of, any non-conforming use of the land, which, but for that prohibition, would not have been an unlawful erection, alteration or extension under the laws of the State or the local laws of the local government within whose district the land is situated.
no compensation is payable by the responsible authority for injurious affection to that land alleged to be due or arising out of such reservation until
(a) the land is first sold following the date of the reservation; or
(b) the responsible authority
(i) refuses an application made under the planning scheme for approval of development on the land; or
(ii) grants approval of development on the land subject to conditions that are unacceptable to the applicant.
Question 1: Was that part of the Subject Land designated as POS under the Structure Plan reserved for public purposes under TPS3 from the adoption of the Structure Plan until the commencement of the Deemed Provisions?
(a) Applying the decision in Scutti¸ the Subject Land was injuriously affected as from 16 February 2010, by reason of the provisions of the Structure Plan and the effect of cl 6.2.6.3 and cl 6.2.12.2 of TPS 3;
(b) The Subject Land ceased to be injuriously affected on 19 October 2015, when the Deemed Provisions commenced, and the de-reservation of the Subject Land was effected. That was because the provisions of TPS3, which gave the Structure Plan's designation of part of the Subject Land as POS the force of a provision of TPS3 itself, ceased to have effect. That was long before any trigger event relied upon by Otago;
(c) Alternatively, the Subject Land ceased to be injuriously affected, at the latest, on 26 August 2016, on the amendment of TPS3 by Amendment 111, at which point cl 6.2.6.3 and 6.2.12.2 and the provisions of TPS3 in relation to DA 19 were expressly deleted. That was also months before the trigger event, of the sale of the Subject Land;
(d) From 19 October 2015, or at the latest, 26 August 2016, and since the sale of the Subject Land (on 15 September 2017) the Subject Land was not, and has not, been injuriously affected for the purposes of s 174(1)(a) of the PD Act.
(i) What is the meaning of the term 'reserved' in the phrase 'land is reserved ... under the planning scheme'?
[243] The authors recognised that, where all forms of development were prohibited on a particular parcel of land, the land should be reserved, requiring its subsequent acquisition. They said that, while it would obviously be more advantageous for the Regional Planning Authority to make the acquisition immediately, this would be difficult to achieve without a considerable sum of money being available. They went on to say... :
It is important, however, to ensure that as and when these reservations are required the necessary land can be bought without any value accruing to it by reason of additional substantial development. ...
Consequently, it is considered that where development threatens a reservation for regional purposes, and provided no minor adjustment in detail is possible, the land should be acquired.
In the case of some of the longer term regional proposals there is nothing to prevent the present use of the land being carried on for a number of years, and it is anticipated that in some of the outer areas this may well be the case.
Where land is required for a public purpose, and is shown as such in a town planning scheme, zoning does not always meet the case. Even though the land may not be required for the public purpose for many years, and the present use may continue to be enjoyed during that time, the ultimate use will exclude private development.
In a town planning scheme such land should be classified as a reservation which carries with it the inherent obligation on the part of the planning authority to purchase it. As a planning scheme envisages development for many years ahead it is likely that a number of reservations will not actually be required for their planned use until perhaps one or two decades have passed, and it is possible that they need not be acquired until just before that time. However, because the reservation virtually prevents the use of the land for other than its existing use and perhaps a limited extension, it is necessary to make provision for the reservation or any part of it to be acquired if the owner desires to develop it and the reservation prevents such development.
[253] At the time of the introduction of these provisions, the then Minister ... said ...:
The Bill also amends the compensation provisions in respect of the [MRS]. This amendment arises from a consideration of the financial resources of the metropolitan improvement fund and problems of planning authorities in other States where claims for compensation have totalled many millions of pounds - far beyond the resources of the responsible authorities. ...
[I]t is quite impossible to contemplate the acquisition immediately, or over a short period of time, of land which will not be required for many years ahead and the cost of which will, in the aggregate, run to many millions of pounds. However, as the Act stands, the authority could be confronted with a heavy claim for compensation in respect of the whole of the land reserved under the scheme and far beyond its financial ability to meet. Nevertheless, it is necessary that the land be reserved in the scheme for this future need; and the reservation imposes an obligation in respect of compensation.
It can properly be argued that reservation under the scheme depreciates the value of land. However, the depreciation is, in many cases, hypothetical and becomes real only when the land is sold at a price which reflects this depreciation, or when development is frustrated by as refusal of consent under the scheme. The amendment proposes that compensation for injurious affection be limited to two circumstances: where a sale is effected at a depressed value attributable to reservation under the scheme, or where consent to develop is refused on the ground of reservation under the scheme.'
[47] [T]he reservation of land for public purposes has a long history under Western Australian planning legislation as explained in Mount Lawley Pty Ltd v Western Australian Planning Commission. The purpose of a reservation is to indicate the intention that the land will be purchased or taken by government for public purposes. ... [P]urpose is to be determined by reference to the terms of the relevant scheme and the PRS [that is, the scheme which applied in that case] classifies land into that reserved for public purposes and other land for primarily (if not wholly) private uses.
(citation omitted)
[130] ... Sections 174(1)(a) and 174(1)(b) ... have [their] own sphere[s] of operation, although the two may overlap ... .
[131] Section 174(1)(a) 'deals with a situation where land is 'reserved' for a public purpose. It appears to proceed on the assumption, consistently with the history of reservation outlined in Mount Lawley, that land which is to be acquired for a public purpose, even if not immediately required for that purpose, should be 'reserved' for that purpose. Although reservation was initially conceived in circumstances where all forms of development were prohibited, the effect of reservation must, ultimately, depend upon a proper construction of the scheme as a whole.
[132] Reservation of land for a public purpose would not of itself preclude other uses in the interim, pending acquisition, if the scheme permits other uses. But even if the scheme provides for approval to be given to other uses of the land in the interim, the prospect of obtaining approval for alternative uses would, at least generally speaking, and in practical terms, be overshadowed by regard to the ultimate purpose for which the land is reserved.
[133] Where land is reserved, coupled with an express provision that there is to be no other use of the land, ... s 174(1)(a) would apply because of the reservation, and ... s 174(1)(b) would prima facie apply because the scheme would also then permit 'development on that land for no purpose other than a public purpose'. The same result would follow where the land is reserved for a public purpose, without express provision for alternative use, and the court concluded that, on a proper construction of the instrument as a whole, the scheme 'permits development ... for no purpose other than for a public purpose'.
[134] At least ordinarily, however, s 174(1)(b) is intended to operate where there is no 'reservation' as such. Amongst other things, it means that the obligation to pay compensation for injurious affection cannot be avoided by simply not reserving land for a public purpose in the first place, but, instead, providing in the scheme for no development other than for a public purpose.'
(footnotes omitted)
(ii) Did the identification of part of the Subject Land as POS in the Structure Plan mean that the Subject Land was 'reserved'?
The designation of land as POS in the Structure Plan
As POS has been located based on planning and environmental criteria rather than ownership, it is necessary to include the cost of providing and developing POS as a development contribution item to ensure all owners make an equitable contribution to POS as opposed to just those owners whose land includes POS. The City will develop and landscape all the POS once the appropriate land has been ceded and funds are available through the DCA contributions.'
(emphasis added)
(iii) If so, was the Subject Land reserved 'for a public purpose'?
(iv) If so, can it be said that the Subject Land was reserved 'under the planning scheme' given that it was designated as POS in the Structure Plan, rather than in TPS3 itself?
Question 2: If the answer to question 1 is yes, did the reservation confer on Otago a vested but deferred right to compensation?
(a) If the Tribunal found that the Subject Land was injuriously affected as from 16 February 2010, on the basis that provisions of the Structure Plan together with cl 6.2.6.3 and 6.2.12.2 of TPS3 operated as a reservation of the Subject Land for a public purpose, then Otago was entitled to make a claim for any compensation that was payable due to or arising out of that reservation, following the first sale of the Subject Land;
(b) The Deemed Provisions, and Amendment 111, resulted in the Structure Plan provisions no longer operating as a reservation of the Subject Land for a public purpose, and that was 'akin to a revocation of a standard reservation of land'. However, neither the Deemed Provisions nor Amendment 111 sought to have retrospective effect or to abrogate or extinguish any potential claim for compensation in relation to any prior reservation, whatever the nature or status of that claim may be; and
(c) While the revocation or cessation of the reservation, from either 19 October 2015 or 26 August 2016, would likely have a significant impact on whether any compensation was actually payable to Otago, due to or arising out of the reservation, and would also likely trigger the concurrent operation of the provisions of s 181 dealing with the recovery of compensation following the revocation of a reservation, that had no impact on whether a claim for such compensation could be made.
The nature of the entitlement to compensation under s 173 of the PD Act
Authority in relation to the right to obtain compensation under Part 11
Question 3: If the answer to question 2 is yes, did the commencement of the Deemed Provisions (and consequential amendments) abrogate that right to compensation?
(1) Where a written law repeals an enactment, the repeal does not, unless the contrary intention appears -
...
(c) affect any right, interest, title, power or privilege created, acquired, accrued, established or exercisable or any status or capacity existing prior to the repeal;
...
(f) affect any investigation, legal proceeding or remedy in respect of any such right, interest, title, power, privilege, status, capacity, duty, obligation, liability, burden of proof, penalty or forfeiture,
and any such investigation, legal proceeding or remedy may be instituted, continued, or enforced, and any such penalty or forfeiture may be imposed and enforced as if the repealing written law had not been passed or made.
I certify that the preceding paragraph(s) comprise the reasons for decision of the State Administrative Tribunal.
[1] Amended Statement of Agreed Facts (AF) [3]. The Subject Land is identified as Lot 55 on Diagram 60481, Certificate of Title Volume 1593 Folio 807: Exhibit 2.1, 2.2.
[5] AF [23] [24]. The Board of Valuers is a respondent to these proceedings, but did not participate in these proceedings, and advised that it would abide the outcome.
[6] AF [36]; see also Attachment A to the Applicant's Submissions dated 15 January 2020. Otago also lodged the claim for compensation with the Western Australian Planning Commission. However, there was no suggestion in these proceedings that the Commission is the responsible authority.
[19] TPS3 cl 6.2.4.1. TPS3 provided for the manner in which structure plans would be developed and would come into effect: TPS3 cl 6.2.6.4 - 6.2.12.1.
[28] 'Infrastructure' was defined to mean 'services and facilities, which, in accordance with the [WAPC's] policy, it is reasonable for Owners to make a Cost Contribution towards': TPS3 cl 6.3.2.
[43] LPS Regulations r 10(1). The LPS Regulations were made pursuant to s 256 of the PD Act.
[44] PD Act s 257A; LPS Regulations r 10(2).
[45] PD Act s 257B(2); LPS Regulations r 10(4).
[46] PDS Act s 257B(3); LPS Regulations r 10(1) and (4).
[49] LPS Regulations Schedule 2 cl 15(a)(ii).
[50] LPS Regulations Schedule 2 cl 16(1)(c).
[52] LPS Regulations Schedule 2 cl 67(2)(j).
[53] LPS Regulations Schedule 2 cl 27(1).
[54] The amendment of TPS3 made by Amendment 111 was effected pursuant to s 75 and s 87 of the PD Act. A copy of the Government Gazette from 26 August 2016, which set out Amendment 111 of TPS3, was attached to the Third Respondent's Submissions.
[59] Western Australian Planning Commission v Southregal Pty Ltd [2017] HCA 7; (2017) 259 CLR 106.
[60] Cf Bond Corporation Pty Ltd v Western Australian Planning Commission [2000] WASCA 257, [33] (Ipp J, Wallwork J and Owen J agreeing).
[63] PD Act s 173(1); Southregal [36], [45] (Kiefel and Bell JJ), [67] - [68] (Gageler and Nettle JJ).
[64] Southregal [46] (Kiefel and Bell JJ).
[65] Southregal [44], [55] (Kiefel and Bell JJ).
[68] Southregal [44] (Kiefel and Bell JJ), [73] - [87], [94] (Gageler and Nettle JJ).
[79] Applicant's Contention [1] - [4].
[80] Applicant's Contentions 21 June 2019 [5] - [6].
[81] Applicant's Contentions 21 June 2019 [7].
[82] Applicant's Contentions 21 June 2019 [8].
[84] First Respondent's Principal Contentions [4].
[85] First Respondent's Outline of Submissions [5].
[86] First Respondent's Principal Contentions [4].
[87] First Respondent's Outline of Submissions [12].
[88] First Respondent's Outline of Submissions [14].
[89] First Respondent's Outline of Submissions [13].
[90] First Respondent's Outline of Submissions [25].
[91] First Respondent's Outline of Submissions [26].
[92] First Respondent's Outline of Submissions [30].
[94] Third Respondent's Responsive Submissions [13].
[95] Third Respondent's Responsive Submissions [2].
[96] Third Respondent's Responsive Submissions [9].
[97] Third Respondent's Responsive Submissions [8].
[98] [2008] WASAT 46 [27].
[99] O'Grady v Northern Queensland Co Ltd [1990] HCA 16; (1990) 169 CLR 356, 374 (Toohey and Gaudron JJ), 376 (McHugh J).
[100] Cf Brookton Co-operative Society Ltd v Federal Commissioner of Taxation [1981] HCA 28; (1981) 147 CLR 441; Cronulla Sutherland Leagues Club Ltd v Federal Commissioner of Taxation (1990) 23 FCR 82; Envestra Ltd v Federal Commissioner of Taxation [2008] FCA 249; (2008) 169 FCR 300 [34].
[101] Oxford English Dictionary Online.
[103] Outline of Applicant's Submissions [27].
[117] Applicant's Submissions [25], referring to Scutti at [147].
[125] Applicant's Responsive Submissions [15].
[129] ts 37, 6 February 2020. Counsel referred to par [58] of Scutti.
[131] First Respondent's Outline of Submissions [69].
[138] First Respondent's Principal Contentions [5].
[142] First Respondent's Outline of Submissions [70].
[143] First Respondent's Outline of Submissions [58].
[144] First Respondent's Outline of Submissions [62].
[145] First Respondent's Outline of Submissions [76].
[146] First Respondent's Outline of Responsive Submissions [1].
[150] Third Respondent's Submissions [5].
[151] Third Respondent's Submissions [6].
[153] Third Respondent's Submissions [7], relying on Scutti.
[156] Third Respondent's Submissions [11], referring to S and L Lenz Pty Ltd v Shire of Serpentine Jarrahdale [2017] WASC 191.
[157] Third Respondent's Submissions [12].
[158] Third Respondent's Submissions [13].
[160] Mohammadi v Bethune [2018] WASCA 98, [31] - [36].
[165] Mandurah Enterprises Pty Ltd v Western Australian Planning Commission [2008] WASCA 211; (2008) 38 WAR 276. Although that decision was the subject of a successful appeal to the High Court (see Mandurah Enterprises Pty Ltd and Ors v Western Australian Planning Commission [2010] HCA 2; (2010) 240 CLR 409 nothing in the appeal judgment cast doubt on the correctness of her Honour's explanation of the role of reservations under Western Australian planning legislation.
[166] Cf Interpretation Act 1984 (WA) s 5.
[167] Australian Unity Property Limited v City of Busselton [2018] WASCA 38 (Australian Unity Property Limited v City of Busselton) [77].
[168] Australian Unity Property Limited v City of Busselton [83].
[169] Australian Unity Property Limited v City of Busselton [84].
[170] Re Shire of Mundaring; ex parte Solomon [2007] WASCA 132 [25].
[171] Australian Unity Property Limited v City of Busselton [82].
[172] Australian Unity Property Limited v City of Busselton [84].
[173] Cf the definition of 'subsidiary legislation' in Interpretation Act 1984 (WA) s 5. We note that since the introduction of the LPS Regulations, the preparation of structure plans has been addressed in the Deemed Provisions set out in Pt 4 of Schedule 2 to the LPS Regulations.
[174] Under TPS3, land was zoned for Development in order 'to provide for future residential, industrial or commercial development in accordance with a comprehensive Structure Plan prepared under the Scheme': see TPS3 cl 4.2.1(i). The zoning table also indicated that the development and use of land zoned for Development was to be in accordance with an approved Structure Plan prepared and adopted under cl 6.2.9 of TPS3: TPS3 cl 4.3, Table 1, Note 3.
[186] Coventry Square WA Pty Ltd and City of Bayswater [2014] WASAT 83 [75]; Swanbourne Estate Development Joint Venture and City of Nedlands [2008] WASAT 274 [44].
[199] LPS Regulations Schedule 2 cl 27(1).
[200] LPS Regulations Schedule 2 cl 67.
[202] Applicant's Submissions [34], citing Two Rocks Investments Pty Ltd v WAPC [2019] WASAT 59 [24].
[212] Applicant's Responsive Submissions [5].
[214] Applicant's Submissions [29] - [30].
[216] Applicant's Responsive Submissions [6].
[217] Applicant's Responsive Submissions [3].
[218] Applicant's Responsive Submissions [2].
[219] Applicant's Responsive Submissions [3].
[220] Applicant's Responsive Submissions [8].
[221] Applicant's Responsive Submissions [7].
[222] Applicant's Responsive Submissions [7].
[228] ts 16, 6 February 2020; ts 59-60, 6 February 2020.
[232] First Respondent's Outline of Submissions [19] - [20].
[233] First Respondent's Outline of Submissions [21].
[234] First Respondent's Outline of Submissions [1], [7] - [10].
[235] First Respondent's Outline of Submissions [22], [24], referring to Temwood [30] - [31], and Southregal [32]; ts 33, 6 February 2020.
[237] First Respondent's Outline of Submissions [27] - [29].
[242] First Respondent's Outline of Submissions [36].
[243] First Respondent's Outline of Submissions [35].
[245] First Respondent's Outline of Responsive Submissions [10].
[258] Third Respondent's Submissions [21].
[259] Third Respondent's Responsive Submissions [7].
[260] Third Respondent's Responsive Submissions [7].
[262] Third Respondent's Responsive Submissions [13].
[263] Third Respondent's Responsive Submissions [7].
[272] Oxford English Dictionary Online.
[273] Oxford English Dictionary Online.
[274] Oxford English Dictionary Online.
[277] Project Blue Sky Inc v Australian Broadcasting Authority [1998] HCA 28; (1998) 194 CLR 355 [70].
[279] Section 36(3) of the TPD Act relevantly provided that 'where under the scheme any land has been reserved for a public purpose, no compensation is payable by the responsible authority for injurious affection to that land alleged to be due to or arising out of such reservation until (a) the land is first sold following the date of the reservation'.
[283] See the analysis undertaken by Kiefel and Bell JJ in Southregal at [14].
[285] Southregal [16] referring to McHugh J at [31].
[286] Southregal [16] referring to McHugh J at [30].
[287] Southregal [16] referring to Gummow and Hayne JJ [102].
[289] See Temwood [96]; see also Southregal [15].
[290] Keane J dissented for reasons which do not presently require elaboration.
[298] Southregal [46] (Kiefel and Bell JJ); [75] (Gageler and Nettle JJ).
[301] Applicant's Submissions [37], citing Dossett v TKJ Nominees Pty Ltd [2003] HCA 69; [2003] HCA 69; (2003) 218 CLR 1.
[302] Applicant's Responsive Submissions [2].
[307] Applicant's Submissions [40], [41], and ts 30, referring in particular to the joint judgment of Justices Hayne and Gummow, and to the judgment of Justice McHugh, in Temwood, and to the analysis thereof in Southregal.
[312] First Respondent's Outline of Responsive Submissions [5], referring to Southregal at [28], [70], [83].
[314] First Respondent's Outline of Responsive Submissions [7].
[315] First Respondent's Outline of Responsive Submissions [8].
[316] First Respondent's Outline of Responsive Submissions [8]; ts 51.
[318] Third Respondent's Responsive Submissions [11].
[319] Third Respondent's Responsive Submissions [12].
[320] Presiding Member of the Southern Joint Development Assessment Panel v DCSC Pty Ltd [2018] WASCA 213.
[321] Presiding Member of the Southern Joint Development Assessment Panel v DCSC Pty Ltd [102] - [107].
Scutti v City of Wanneroo [2018] WASCA 175
Australian Unity Property Limited v City of Busselton [2018] WASCA 38
Bond Corporation Pty Ltd v Western Australian Planning Commission [2000] WASCA 257
Brookton Co-operative Society Ltd v Federal Commissioner of Taxation [1981] HCA 28; (1981) 147 CLR 441
City of Canning and Avon Capital Estates (Australia) Ltd [2008] WASAT 46
Coventry Square WA Pty Ltd and City of Bayswater [2014] WASAT 83
Dossett v TKJ Nominees Pty Ltd [2003] HCA 69; (2003) 218 CLR 1
Envestra Ltd v Federal Commissioner of Taxation [2008] FCA 249; (2008) 169 FCR 300
Mandurah Enterprises Pty Ltd and Ors v Western Australian Planning Commission [2010] HCA 2; (2010) 240 CLR 409
Mandurah Enterprises Pty Ltd v Western Australian Planning Commission [2008] WASCA 211
Mount Lawley Pty Ltd v Western Australian Planning Commission [2004] WASCA 149; (2004) 29 WAR 273
O'Grady v Northern Queensland Co Ltd [1990] HCA 16; (1990) 169 CLR 356
Presiding Member of the Southern Joint Development Assessment Panel v DCSC Pty Ltd [2018] WASCA 213
Project Blue Sky Inc v Australian Broadcasting Authority [1998] HCA 28; (1998) 194 CLR 355
Re Shire of Mundaring; ex parte Solomon [2007] WASCA 132
Swanbourne Estate Development Joint Venture and City of Nedlands [2008] WASAT 274
Two Rocks Investments Pty Ltd v WAPC [2019] WASAT 59
Western Australian Planning Commission v Southregal Pty Ltd [2017] HCA 7; (2017) 259 CLR 106
(1981) 147 CLR 441
(1990) 23 FCR 82
(2003) 218 CLR 1
(2008) 169 FCR 300
(2010) 240 CLR 409
(2004) 29 WAR 273
(1990) 169 CLR 356
(1998) 194 CLR 355
(2017) 259 CLR 106
(2018) 53 WAR 417
(2008) 38 WAR 276
(2004) 221 CLR 30