[2026] VCAT 37
General information, not legal advice.
Victorian Civil and Administrative Tribunal
2026-01-20
Original judgment source is linked above.
For Applicant/First and Second Respondents by counterclaim
(a) cutting of the slab and chasing services into the slab of the premises;
(b) drilling, penetrating and cutting through the dividing precast wall between unit 8 and the premises;
(c) drilling of holes into the roof for the tethering of a marketing balloon on the roof of the premises;
(d) installing refrigeration and air-conditioning equipment on the roof of the premises; and
(e) installing a marketing balloon on the roof of the premises
(a) made structural alterations, additions and/or repairs to the premises without the written consent of the landlord; and
(b) brought articles of weight or nature onto the premises which may damage the premises
(a) By issuing the Notice of Default, did the landlord engage in unconscionable conduct in breach of s 77 of the RLA? If yes, is the tenant entitled to damages? and
(b) Is the landlord entitled to damages from the tenant because of the breaches of lease identified in the Notice of Default and if so what amount?
ISSUE 1 - DID THE LANDLORD ENGAGE IN UNCONSCIONABLE CONDUCT IN BREACH OF S 77 OF THE RLA BY ISSUING THE NOTICE OF DEFAULT?
(l) the extent to which the landlord was not reasonably willing to negotiate the rent under the lease.
(a) the language of s 77 of the RLA;
(b) the remedial and beneficial objects of the RLA;
(c) the surrounding conduct; and
- the evaluation of conduct by reference to a normative standard of conscience which may develop and change over time and which must be understood and applied in the context with which it arose. Usually, serious misconduct or actions showing no regard for conscience must be demonstrated.[3]
(a) In April 2009 he was approached by Ely Makool to approve two openings in the interparty wall between units 9 and 10. He gave approval subject to conditions and the works were carried out sometime in 2010/2011;
(b) He first became aware of the 2016 works when his wife was shopping at the premises and saw the concrete slab being cut;
(c) He contacted his managing agent who was unaware of the works being undertaken;
(d) He inspected the premises with his managing agent on 2 September 2016. George Makool was present and he expressed his concerns about the works to Mr Makool. He asked for copies of engineering drawings but never received them. He said Mr Makool laughed at him and would not engage meaningfully during the inspection;
(e) He instructed his agent to email the tenant which he did on 5 September 2016 requesting engineers' computations and drawings and photographs of steel work prior to any pouring;
(f) On 13 September 2016 the tenant was notified that it must cease works and reinstate the unauthorised works;
(g) George Makool responded on 21 September 2016 saying the family was away overseas and he would talk when back the following week;
(h) By emails dated 21 September 2016 and 4 October 2016 the agent requested an update from the tenant and reminded the tenant of the stop work request;
(i) George Makool responded on 4 October 2016 saying he was waiting for the engineer to prepare the documentation;
(j) On 5 October 2016 the landlord received a letter from Lindsay Patone of Vert Engineering Pty Ltd stating that the works appeared to be within the requirements of Australian Standards;
(k) Despite continued requests no structural or engineering drawings were provided;
(l) On 11 November 2016 he discovered the unauthorised installation of a balloon and airconditioning units on the roof;
(m) On 13 February 2017 the agent wrote to the tenant requesting cessation of works;
(n) Further requests for information about the works were made in November and December 2017.
ISSUE 2 - IS THE LANDLORD ENTITLED TO DAMAGES BECAUSE OF THE TENANT'S BREACHES SET OUT IN THE NOTICE OF DEFAULT?
The Lessee covenants and agrees with the Lessor as follows:
Clause 1(j) - Alterations and Additions - not to make or permit any structural alterations, additions or repairs to the Premises and not without prior written consent of the Lessor or the Agent (which consent may be given to conditions including, without limitation, the type of materials to be used) to install any partitions, fixtures or fittings or to alter or remove any existing partitions, fixtures or fittings or to redecorate the Premises.
Is the landlord entitled to nominal damages only?
At the expiration or earlier termination of the Term, to remove any Lessee's partitions, fixtures and fittings and to reinstate the Premises to their original condition as at the commencement of the Lessee's occupancy of the Premises and to make good any damage to the premises to the reasonable satisfaction of the Lessor. The Lessee must also deliver a possession of the premises to the lessor together with all Lessor's fixtures and chattels in accordance with the Lessee's covenants contained in this Lease.
At trial, the Landlord's only claim for damages for breach of contract was based on an alleged breach of cl 2.13. Accordingly, damages are to be assessed on that basis. Clause 2.13 is an express negative covenant. It serves a function of considerable practical utility in relation to the Landlord's capacity to protect its legitimate interest in preserving the physical character of the premises leased. That function is: provided the Landlord learned of a threat to make a substantial alteration to the premises without its written consent, a speedy application could be made for an interlocutory negative injunction, an appeal could be made to the modern understanding of the principles classically stated by Lord Cairns LC in Doherty v Allman, and the status quo could readily be preserved. The clandestine conduct of the Tenant made it impossible for the Landlord to apply for an interlocutory negative injunction, but that does not detract from that aspect of cl 2.13 in assessing damages for its breach.
... Its measure of damages is the loss sustained by the failure of the tenant to perform that obligation; and that loss is the cost of restoring the premises to the condition in which they would have been if the obligation had not been breached.
(a) Mr Ian Flanders, registered building practitioner and structural engineer of Clive Steel Partners
(b) Mr Wayne Liddy, registered building practitioner, surveyor and inspector of Gardener Group
(c) Mr Justin Zumpe, registered building practitioner and quantity surveyor of Zinc Cost Management
Holes drilled in roof decking for hooks required for tethering marketing balloons
Penetrations through roof decking for Refrigeration and Mechanical Services
(a) Nicholas Warton, building consultant of Buildspect
(b) Shane Leonard, registered building practitioner, building surveyor and building inspector of Philip Chun
(c) Mark Janus, civil engineer of MRM Group Pty Ltd
(d) Allen Milner of Alpine Cost Research
(a) that he was previously employed by Vert Engineering. Mr Janus' Curriculum Vitae ('CV') attached to his reports did not include a work history;
(b) whilst employed by Vert Engineering he was directly involved in the advice to the tenant in April 2016 regarding the installation of the refrigeration condensing units on the roof of the premises. He drafted the April 2016 letter and the plan which led to the installation of that equipment;
(c) he previously worked on a significant project for the tenant's directors. The project is referenced in his CV as 'Makool's Food Distribution Centre'.
ITEMS A & B - Chasing of Hydraulic Services and Refrigeration services
(a) His estimate was based on his assumption that there was no impact to the slab by the works. He accepted in cross-examination that the statement in his report that there was no impact to the slab by the unauthorised works was not accurate;
(b) He based his estimate on the sketches he drew (a refrigeration drain plan and a deli plan). He confirmed that all visible cuts were included in the drawings. The sketches were however questionable as to their accuracy. For example, he was taken to a photograph in his report where a cut in the slab near the deli cabinet was visible but not shown in his drawings. He said he did not include it in his drawings as he was guided by Mr Ely Makool as to the location of the pipes and cuts. He was questioned about why the pump drain did not lead anywhere on the drawing. He said the drawings were based upon what Mr Ely Makool told him and what he could see;
(c) Mr Janus acknowledged in cross-examination that without plans of the work done, some of the area requiring rectification may have been missed. He also acknowledged that the structural integrity of the floor could be less than adequate if certain areas requiring repair were not rectified;
(d) Mr Janus acknowledged that statements made by him in his report were inaccurate. He accepted that there could be issues around the structure related to the existence or absence of a water barrier and the ingress of water through core holes;
(e) He agreed that he had relied entirely upon the Vert Engineering letter of 5 October 2016 which concluded that the works were compliant with Australian Standards.
(a) It was the tenant's own unlawful actions that has brought about the uncertainty of the size of the area;
(b) I have favoured the landlord to a certain degree because the tenant's unlawful actions have made an accurate determination so problematic;[11]
(c) The absence of plans which ought to have been obtained by the tenant before the works were carried out have led to confusion over what works were carried out to the slab in 2016 and what works may have been done by a previous tenant;
(d) The uncertainty about the actual area requiring reinstatement without the removal of the tenant's installations;
(e) I have discounted Mr Janus' estimates for reasons already given;
(f) Given the works affected structural matters Mr Flanders' approach is preferred;
(g) The opinion of Mr Flanders about the need to avoid a patchwork slab and to replace in large sections instead of localised repairs so as to reinstate to full capacity;
(h) Mr Flanders' comments on the Janus' estimate and Mr Janus' acknowledgement that the Janus sketches were not completely accurate; and
(i) A discount of the area identified by Mr Flanders to account for pre-existing unidentified cuts in the slab.
(a) there is no evidence of the composition of the original slab;
(b) there are no technical documents for the 2016 unauthorised works;
(c) Mr Flanders said in re-examination that:-
(i) He recalled seeing a large roller door 4 to 5 meters wide at the rear of the premises which would allow access for a truck;
(ii) If the premises when constructed had access for a truck it could be assumed that N32 concrete was used so as to be compliant;
(iii) There were signs at the warehouse that forklifts were in use which is consistent with a minimum slab constructed from N32 concrete.
(d) Mr Flanders' unchallenged comment in his second report that the premises were originally intended as a showroom/warehouse. Based on the load required for that purpose, floors subject to traffic required a minimum strength of N32 concrete.
ITEM C - Penetration through dividing precast wall
ITEM D - Holes drilled in roof decking for hooks required for tethering marketing balloons $29,100.00
(a) Mr Flanders accepted in cross-examination that the roof was about 30 to 40 years old;
(b) replacement of areas of the roof would give the landlord a windfall gain given the age of the roof;
(c) given the age of the roof, localised patching and sealing as suggested by Mr Janus and as agreed to by the tenant's building expert Mr Liddy, would be acceptable.
ITEM E - Penetrations through roof decking for refrigeration and mechanical services $70,400.00
[1] The parties ran cases based on additional claims. The additional claims were either abandoned at the start of the hearing or in closing submissions.
[2] This is a notice issued pursuant to s 146 of the Property Law Act 1958 (Vic).
[4] The landlord abandoned his claims in relation to the mezzanine floor in opening submissions and in relation to the 2021 refrigeration works in closing submissions.
[6] See Robinson v Harman [1848] EngR 135; (1848) 1 Exch 850 at 855 [154 ER 363 at 365] which was cited in Tabcorp Holdings Ltd v Bowen Investments Pty Ltd [2009] HCA 8; [2009] 236 CLR 272 at [13].
[8] Mr Zumpe's expert reports are dated 22 November 2022 and 26 April 2024.
[9] At page 391 of Mr Zumpe's report dated 26 April 2024.
[10] Berry v CCL Secure Pty Ltd [2020] HCA 27 at [29].
[11] See Pitcher Partners Consulting Pty Ltd v Nevilles' Bus Service Pty Ltd (2019) 281 FCR 392 at 417.
Oasis Bakery Pty Ltd
Theodosiou
LANDLORD AND TENANT, retail lease, whether landlord entitled to damages for unauthorised works carried out by tenant, whether landlord required to wait until tenant's obligation to make good arises, assessment of damages, Tabcorp Holdings Ltd v Bowen Investments Pty Ltd [2009] HCA 8; (2009) 236 CLR 272, whether landlord engaged in unconscionable conduct by issuing a s 146 notice of default based on the unauthorised works, s 77(2)(l) and s 80 Retail Leases Act 2003 (Vic)
(2009) 236 CLR 272
(2019) 281 FCR 392