[2016] VCAT 649
General information, not legal advice.
Victorian Civil and Administrative Tribunal
2016-04-27
Original judgment source is linked above.
DOMESTIC BUILDING: major domestic building contract; not in writing; enforceability; quantum meruit; assessment.
Mr Marcin Jacek Nicinski t/as Marcin Nicinski (ABN: 808 501 21100)
Nicinski v Chemay (Building and Property) [2016] VCAT 649
IS A MAJOR DOMESTIC BUILDING CONTRACT REQUIRED?
builder means a person who, or a partnership which -
manages or arranges the carrying out of domestic building work; or
intends to carry out, or to manage or arrange the carrying out of, domestic building work;
domestic building contract means a contract to carry out, or to arrange or manage the carrying out of, domestic building work other than a contract between a builder and a sub-contractor;
major domestic building contract means a domestic building contract in which the contract price for the carrying out of domestic building work is more than $5,000 (or any higher amount fixed by the regulations);
the renovation, alteration, extension, improvement or repair of a home.
any work that the regulations state is not building work to which this Act applies;
For the purpose of section 6(a) of the [the Domestic Building Contracts] Act, work is not building work to which the Act applies if the work is to be carried out under a contract in relation to one only of the following types of work -
(a) attaching external fixtures (including awnings, security screens, insect screens and balustrades);
(h) plumbing work as defined in section 221C of the Building Act 1993;
(j) erecting a chain wire fence to enclose a tennis court;
(k) erecting a mast, pole, antenna, aerial or similar structure.
CONSEQUENCE OF THERE BEING NO WRITTEN MAJOR DOMESTIC BUILDING CONTRACT.
(1) A builder must not enter into a major domestic building contract unless the contract -
(b) sets out in full all the terms of the contract; and
(c) has a detailed description of the work to be carried out under the contract; and
(d) includes the plans and specifications for the work and those plans and specifications contain enough information to enable the obtaining of a building permit; and
(e) states the names and addresses of the parties to the contract; and
(f) states the registration number (as it appears on the registration certificate under the Building Act 1993) of -
(g) states the date when the work is to start, or how that date is to be determined; and
(h) if the starting date is not yet known, states that the builder will do everything that it is reasonably possible for the builder to do to ensure that the work will start as soon as possible; and
(i) states the date when the work will be finished, or, if the starting date is not yet known, the number of days that will be required to finish the work once it is started; and
(j) states the contract price or, in the case of a cost plus contract, how the amount that the builder is to be paid is to be determined; and
(l) sets out details of the required insurance under the Building Act 1993 that applies to the work to be carried out under the contract (including any details required by the Director); and
(q) sets out the warranties implied into the contract by sections 8 and 20; and
(s) complies with any other requirements set out in the regulations.
A major domestic building contract is of no effect unless it is signed by the builder and the building owner (or their authorised agents).
(i) The new fan will not work when the heat lamps are on;
(ii) The old ventilation fan switch is wired in reverse;
Complaints (i), (ii) and (iii) are sustained. Either Mr Nicinski's electrician needs to return to the site to do this work, or Mrs Chemay must procure the services of a new electrician.
(c) Ensuite - the paint on the ensuite door has not been finished properly at the edge of the door.
The paintwork on the edge of the door was slightly marked and needs to be touched up.
Where a rectangle had been cut out of a tile to fit the edge of the window, a hairline crack had developed. Although the crack is minor, it is visible. I consider affixing a broken tile to be poor workmanship. Mrs Chemay is justified in asking for an allowance so that it can be replaced.
(e) Master Bedroom - the finish to the panel at top of the sliding door is poor.
The panel on top of the new sliding wardrobe door is new, and joins an existing panel over the ensuite door. The new panel is warped, and there is a noticeable mis-alignment of the new panel with the pre-existing panel. The new panel should be replaced so that it sits flush with the pre-existing panel. The replacement panel will have to be painted to match.
(f) Master Bedroom - handle to walk in robe does not match.
The handle on the sliding door to the new wardrobe does not match the handle on the pre-existing ensuite door. One or other of the handles should be changed so that they match.
(g) Master Bedroom - paintwork to be finished on walk-in robe door.
The complaint about paintwork is not sustained, as it was not highlighted at the inspection, and was not noticeable.
(h) Master Bedroom - wood strip from bedroom into ensuite is not varnished.
Mr Nicinski placed an angled strip of timber in this position to create a very short ramp to facilitate wheelchair access into the ensuite bathroom. It is not varnished, and should be, to match the floor.
(i) Master Bedroom - paintwork around window is cracking.
If the paint was cracking around the window, it was barely noticeable. I do not consider this to be a claimable defect.
(j) Lounge - the sliding doors have not been re-hung properly after removal for painting.
The doors do not shut completely, and should be re-hung.
(k) Lounge - sliding doors have been left with splatters of paint.
One of the doors did have minor paint splatters. I consider they could be easily removed.
(l) Lounge - the painting on the wall unit is scratched and damaged, allegedly from when the old locks were removed and new locks were installed.
Minor marks were visible. Mr Nicinski did not dispute they were his responsibility. I consider the wall unit could be touched up, but it does not need to be completely repainted.
(m) Lounge - the edge of the wall unit is marked with paint.
It appears that the painter did not use masking tape when painting this edge, which is adjacent to the wall. I consider this to be poor workmanship. The affected part should be sanded back, and repainted to match.
(n) Front door - painting on the outside of the door is not finished, and a patch of white is visible at the bottom.
(o) Front door - painting around the frame requires sealing and further painting.
It was very difficult, even in broad daylight, to identify this alleged defect. It is not established.
(p) Front door - painting on the wall around the front door is cracking.
Mrs Chemay pointed to scuff marks on the paintwork at the foot of the door. Although this might have been fair wear and tear in the 14 month period since the painting was done, Mr Nicinski said he would touch it up if he was allowed to.
(q) Main bathroom - the gap between the mirror frame and the tiles below has not been sealed properly.
(r) Main bathroom - joints in the plaster work have, since the completion of the painting, become visible.
This is true, but Mr Nicinski points out that the house is an old one and is clearly moving. He says his workmanship was satisfactory. I consider that Mr Nicinski cannot be held responsible, as he cannot be taken to have guaranteed the stability of the pre-existing walls in a room he was tasked with painting.
(s) Main bathroom - 2 weeks after she moved in, Mrs Chemay says a leak re-appeared outside the shower, and the adjacent architrave is rotten.
It is clear that the architrave is rotten. Mrs Chemay said that the architrave had been replaced by Mr Nicinski, and had rotted again within two weeks. I think this is an inherently unlikely scenario, and that it is highly probable that the pre-existing, rotten, architrave was not replaced. In any event, it clearly needs to be replaced now. Mrs Chemay was reluctant to test whether the base of the shower door still leaks, because she did not want to exacerbate the existing damage. It seemed clear to me that if the base area still leaked, it could be simply sealed with silicon.
(t) Rear toilet seat - requires to be installed properly, as it moves.
On inspection, the toilet seat was slightly askew. I accept that it needs to be re-affixed.
(u) Kitchen - cracked paint at base of ceiling and at top of kitchen cabinets.
Even in daylight, these alleged defects were hard to see.
(v) Kitchen - paint has been accidentally applied to neighbouring areas. For example, the paint from the ceiling has been applied to part of the kitchen skylight frame.
Even in broad daylight, this defect could not be identified. Perhaps this was because of the glare from the skylight. Even if it is present to a degree, it certainly is not visible in daylight. I do not think this defect has been established.
(w) Kitchen - the point where the kitchen canopy is fixed to the wall is unsightly.
No problem was readily detectable. A close inspection revealed that there was a very small gap between the canopy and the wall. This has been filled and painted, and is not unsightly. I do not consider it to be a defect.
(x) Dining and family room - the skylight frame has not been varnished.
It was apparent that the skylight frame had been varnished at some stage, perhaps years ago, but the varnish certainly did not match the adjoining ceiling area. This item of incomplete work is established.
(y) Dining and family room - two light switch covers have not been replaced after painting.
(z) Dining and family room - new plug not tested and certified.
The plug was not visible. There is no clear evidence that it had not been tested because neither Mr Nicinski nor Mrs Chemay had any first hand knowledge about this, and Mr Nicinski's electrician was not available to give evidence.
(aa) Wardrobe in the fourth room - cannot be shut properly because the latch was removed during painting and has not been re-installed.
(bb) Wardrobe in the fourth room - top shelf not painted.
(cc) Fourth room - cracks have appeared in the wall, near wardrobe.
Minor cracks were visible. They would appear to be related to slight movement of the frame in this old house, and as such are not Mr Nicinski's responsibility.
(dd) Laundry - the external door needs to be replaced because it was not trimmed correctly before installation, and does not fit the door frame.
It is clear the door does not fit the door frame. Either the door frame is warped, or the edge of the door is not straight. It was not possible at the inspection to establish which explanation was the correct one, in the absence of a straightedge. However, it is clear that the door needs to be replaced with a door that fits the door opening.
(ee) Downstairs - the external door was not painted on the inside, nor sealed at the bottom after being cut to size to fit the door frame.
It is clear that the door has not been painted on the inside.
It is not clear that the bottom of the door has not been sealed. Mr Nicinski said that it had been. I do not think this aspect of the complaint is made out.
(ff) Downstairs - the door frame has not been cemented properly.
This complaint is sustained. The door frame needs to be cemented on both sides so that the lower, concreted, portion is consistent with the existing doorframe, and that the adjacent walls are even.
(gg) Miscellaneous - touch up of the paintwork throughout the house is required, including on the architraves. Paint drops on the floor need to be removed.
Some touching up of the paintwork needs to be done, and cleaning of paint splatter is required in places.
(i) make the new fan work when the heat lamps are on;
(ii) reverse the wiring in the old ventilation fan switch;
(e) Replace and paint the new panel in the master bedroom so that it sits flush with the pre-existing panel.
(g) Varnish the wood strip from master bedroom into ensuite.
(i) Remove splatters of paint from lounge-sliding doors.
(j) Touch up the painting on the wall unit in the lounge.
(k) Sand back, and repaint to match the edge of the wall unit in the lounge.
(l) The painting of the front door on the outside must be completed to cover the patch of white visible at the bottom.
(m) The painting on the wall around the front door should be touched up.
(n) In the second bathroom, the gap between the mirror frame and the tiles below should be sealed properly.
(o) In the second bathroom, the architrave is to be replaced.
(p) In the second bathroom, re-seal front of shower at bottom with silicon.
(s) Replace two light switch covers in dining and family room.
(w) Paint the inside of the downstairs external door.
(y) Touch up of the paintwork throughout the house, and remove paint drops on the floor.
(b) varnish the wood strip leading from the master bedroom into the ensuite;
(a) Electrical works: I adopt Mr Richter's figure of $660 because Mr Nicinski estimated that there was about one day's work for an electrician. He said $300 was an appropriate allowance. I think $300 is a manifestly inadequate, as an electrician is likely to charge at least $85 an hour.
(b) Carpentry: Mr Richter has put a price of $455 on the replacement of the poorly fitted doors, and the adjustment of the double doors, and the replacement of the cupboard handles. He has not allowed for the latch in the cupboard in the fourth bedroom, nor has he allowed for the replacement of the rotten architrave in the main bathroom. I will allow $500.
(c) Plumbing: I consider Mr Richter's quoted price of $220 for fixing the toilet seat and the repair of the leaking shower to be excessive. These items do not require the attention of a qualified plumber. I will allow $100.
(d) Painting: I have assessed this on the basis that Mr Nicinski conceded that there was a day to a day and a half's work required. In order to be conservative, I think two day's work by a painter should be allowed. Mr Nicinski did not say what his hourly rate was, but I adopt an hourly rate of $50, which yields a daily rate of $400. $800 is allowed in total.
Mr Nicinski's claim for damages in connection with the purchase of a new ladder
Nicinski
Chemay