[2016] VCAT 512
General information, not legal advice.
Victorian Civil and Administrative Tribunal
2016-04-05
Original judgment source is linked above.
Supply Laminex kitchen white in colour with white PVC edging as per drawing
Overhead cupboards white Laminex finish white PVC edging
Construct bulkhead two overhead cupboards and ceiling
Supply Laminex laundry white in colour with white PVC edging as per drawing
Supply and fit sliding door and all fixing include locking latch
Sand and polish flooring to kitchen, laundry, new toilet area and entrance to bathroom
A major domestic building contract is of no effect unless it is signed by the builder and the building owner (or their authorised agents).
builder means a person who, or a partnership which -
(b) manages or arranges the carrying out of domestic building work; or
(c) intends to carry out, or to manage or arrange the carrying out of, domestic building work;
domestic building contract means a contract to carry out, or to arrange or manage the carrying out of, domestic building work other than a contract between a builder and a sub-contractor;
domestic building work means any work referred to in section 5 that is not excluded from the operation of this Act by section 6;
major domestic building contract means a domestic building contract in which the contract price for the carrying out of domestic building work is more than $5000 (or any higher amount fixed by the regulations);
sub-contractor means a person who enters into a contract with a builder to carry out part of the work that is to be carried out under a domestic building contract.
the renovation, alteration, extension, improvement or repair of a home [section 5(1)(b)]
(a) any work that the regulations state is not building work to which this Act applies;
For the purpose of section 6(a) of the Act [the DBC Act], work is not building work to which the Act applies if the work is to be carried out under a contract in relation to one only of the following types of work -
(a) attaching external fixtures (including awnings, security screens, insect screens and balustrades);
(h) plumbing work as defined in section 221C of the Building Act 1993;
(j) erecting a chain wire fence to enclose a tennis court;
(k) erecting a mast, pole, antenna, aerial or similar structure.
Section 109 of the Victorian Civil and Administrative Tribunal Act 1998 ("the Act") provides that each party is to bear its own costs in the proceeding, however the Tribunal may, if it is satisfied that it is fair to do so, order that a party pay all or a specified part of the costs of another party. The relevant provisions of s109 are:
(1) Subject to this Division, each party is to bear their own costs in the proceeding.
(2) At any time, the Tribunal may order that a party pay all or a specified part of the costs of another party in a proceeding.
(3) The Tribunal may make an order under subsection (2) only if satisfied that it is fair to do so, having regard to -
(a) whether a party has conducted the proceeding in a way that unnecessarily disadvantaged another party to the proceeding by conduct such as -
(i) failing to comply with an order or direction of the Tribunal without reasonable excuse;
(ii) failing to comply with this Act, the regulations, the rules or an enabling enactment;
(iii) asking for an adjournment as a result of (i) or (ii);
(v) attempting to deceive another party or the Tribunal;
(b) whether a party has been responsible for prolonging unreasonably the time taken to complete the proceeding;
(c) the relative strengths of the claims made by each of the parties, including whether a party has made a claim that has no tenable basis in fact or law;
(e) any other matter the Tribunal considers relevant.
112 Presumption of order for costs if settlement offer is rejected
(a) a party to a proceeding (other than a proceeding for review of a decision) gives another party an offer in writing to settle the proceeding; and
(b) the other party does not accept the offer within the time the offer is open; and
(c) the offer complies with sections 113 and 114; and
(d) in the opinion of the Tribunal, the orders made by the Tribunal in the proceeding are not more favourable to the other party than the offer.
(2) If this section applies and unless the Tribunal orders otherwise, a party who made an offer referred to in subsection (1)(a) is entitled to an order that the party who did not accept the offer pay all costs incurred by the offering party after the offer was made.
(3) In determining whether its orders are or are not more favourable to a party than an offer, the Tribunal -
(a) must take into account any costs it would have ordered on the date the offer was made; and
(b) must disregard any interest or costs it ordered in respect of any period after the date the offer was received.
Section 112(2) creates, on the one hand, a prima facie entitlement to payment of "all costs" in favour of a successful offeror. Ordinarily, it appears, costs would be assessed in such a case on a party and party basis - although the tribunal would be empowered to allow costs on a more favourable basis.
[the "party and party" basis for costs, as it was then known, is akin to what is now the "standard" basis for costs]
[2] Taylor v Trentwood Homes Pty Ltd [2012] VCAT 1125 at para 34
Tozoulis
Hughes